Kalpataru Projects International Transmission Engineer Interview Questions and Answers

Updated 14 Jun 2022

Kalpataru Projects International Transmission Engineer Interview Experiences

1 interview found

I applied via Approached by Company

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. I had experienced the transmission lines work because he asked a simple question, phD meter value is how much? and wasted water how is make it good water?
  • Q2. What is a Tower erection? what type of tower? how is find out you? dose Tower erection start before what you will check it?
  • Ans. 

    Tower erection is the process of installing a tower for various purposes such as telecommunications or power transmission.

    • Tower erection involves the construction and installation of towers for different applications.

    • There are various types of towers used, such as communication towers, transmission towers, or wind turbine towers.

    • Tower erection requires careful planning, engineering, and coordination to ensure safety an...

  • Answered by AI
  • Q3. What is stringing ? how is the calculated final sag?
  • Ans. 

    Stringing is the process of installing conductors on transmission lines. Final sag is calculated based on factors like temperature and tension.

    • Stringing is the installation of conductors on transmission lines.

    • It involves pulling the conductor from one tower to another.

    • Final sag is the desired amount of vertical sag in the conductor.

    • Factors like temperature, tension, and conductor type are considered in calculating fina...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Kalpataru Projects International Transmission Engineer interview:
  • cast control
Interview preparation tips for other job seekers - practical work is best and transmission lines job is a difficult

Interview questions from similar companies

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I appeared for an interview before Jul 2016.

Interview Preparation Tips

Round: Group Discussion
Duration: 4 hours 5 minutes

Round: Test
Duration: 2 hours 5 minutes

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

I appeared for an interview before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. ELSR MEANS

Interview Preparation Tips

Interview preparation tips for other job seekers - Elevated service level Reservoir

Kalpataru Projects International Interview FAQs

How many rounds are there in Kalpataru Projects International Transmission Engineer interview?
Kalpataru Projects International interview process usually has 2 rounds. The most common rounds in the Kalpataru Projects International interview process are Resume Shortlist and Technical.
What are the top questions asked in Kalpataru Projects International Transmission Engineer interview?

Some of the top questions asked at the Kalpataru Projects International Transmission Engineer interview -

  1. what is a Tower erection? what type of tower? how is find out you? dose Tower e...read more
  2. what is stringing ? how is the calculated final s...read more
  3. I had experienced the transmission lines work because he asked a simple questio...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 768 Interviews
Tata Projects Interview Questions
4.2
 • 459 Interviews
KEC International Interview Questions
4.0
 • 318 Interviews
Tata Technologies Interview Questions
3.6
 • 266 Interviews
Saint-Gobain Interview Questions
4.0
 • 174 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
View all

Kalpataru Projects International Transmission Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

4.0

Salary

3.0

Job security

4.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Deputy Manager
626 salaries
unlock blur

₹5.5 L/yr - ₹21 L/yr

Assistant Manager
607 salaries
unlock blur

₹3.7 L/yr - ₹16 L/yr

Senior Engineer
509 salaries
unlock blur

₹3.4 L/yr - ₹11.2 L/yr

Engineer
288 salaries
unlock blur

₹2.7 L/yr - ₹8.5 L/yr

Manager
263 salaries
unlock blur

₹6.2 L/yr - ₹26 L/yr

Explore more salaries
Compare Kalpataru Projects International with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview