I applied via Referral and was interviewed in Feb 2024. There were 2 interview rounds.
Steel wastage can be controlled by implementing efficient production processes, proper inventory management, and regular maintenance of equipment.
Implementing efficient production processes to minimize errors and reduce scrap
Proper inventory management to avoid overstocking and material damage
Regular maintenance of equipment to ensure optimal performance and prevent breakdowns
Training employees on proper handling and c...
Routing is the process of determining the most efficient path for materials or information to flow through a production system.
Routing involves determining the sequence of operations and work centers through which a product will pass during manufacturing.
It helps in optimizing production processes by minimizing delays and maximizing efficiency.
Examples of routing decisions include selecting the best machine for a parti...
Top trending discussions
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
posted on 12 Jul 2022
I applied via Campus Placement and was interviewed before Jul 2021. There were 2 interview rounds.
Computer aptitude test
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
posted on 12 May 2018
posted on 11 May 2018
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
posted on 4 May 2019
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Deputy Manager
626
salaries
| ₹5.5 L/yr - ₹21 L/yr |
Assistant Manager
609
salaries
| ₹3.7 L/yr - ₹14.6 L/yr |
Senior Engineer
509
salaries
| ₹3.4 L/yr - ₹11.2 L/yr |
Engineer
288
salaries
| ₹2.7 L/yr - ₹8.5 L/yr |
Manager
263
salaries
| ₹6.2 L/yr - ₹26 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures