Kalpataru Projects International DGM-Projects Interview Questions and Answers

Updated 20 Apr 2024

Kalpataru Projects International DGM-Projects Interview Experiences

1 interview found

DGM-Projects Interview Questions & Answers

user image Anonymous

posted on 20 Apr 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. How to manage construction activities at site
  • Ans. 

    Construction activities at site can be managed by effective planning, coordination, communication, and supervision.

    • Develop a detailed project plan outlining tasks, timelines, and resources.

    • Regularly communicate with all stakeholders including contractors, suppliers, and team members.

    • Ensure proper coordination between different teams and departments involved in the project.

    • Implement strict quality control measures to ma...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - JMC is a good company for employees and JMC currently known as Kalptaru International

Interview questions from similar companies

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Three people seat and asked Just simple technical questions frequently from civil engineering in hindi & English and watched the confidence level also. Some difficult questions is also there but they have ...
  • Q2. Forget now because long years ago it has been done.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & should have technical knowledge.

I appeared for an interview before Jul 2016.

Interview Preparation Tips

Round: Group Discussion
Duration: 4 hours 5 minutes

Round: Test
Duration: 2 hours 5 minutes

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

I appeared for an interview before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

Kalpataru Projects International Interview FAQs

How many rounds are there in Kalpataru Projects International DGM-Projects interview?
Kalpataru Projects International interview process usually has 1 rounds. The most common rounds in the Kalpataru Projects International interview process are Technical.

Tell us how to improve this page.

Kalpataru Projects International DGM-Projects Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 757 Interviews
Tata Projects Interview Questions
4.2
 • 450 Interviews
KEC International Interview Questions
4.0
 • 310 Interviews
Tata Technologies Interview Questions
3.6
 • 263 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
View all
Kalpataru Projects International DGM-Projects Salary
based on 10 salaries
₹28 L/yr - ₹38 L/yr
13% more than the average DGM-Projects Salary in India
View more details

Kalpataru Projects International DGM-Projects Reviews and Ratings

based on 2 reviews

2.9/5

Rating in categories

2.9

Skill development

2.0

Work-life balance

3.5

Salary

2.9

Job security

2.9

Company culture

2.9

Promotions

2.5

Work satisfaction

Explore 2 Reviews and Ratings
Deputy Manager
626 salaries
unlock blur

₹5.5 L/yr - ₹21 L/yr

Assistant Manager
609 salaries
unlock blur

₹3.7 L/yr - ₹14.6 L/yr

Senior Engineer
509 salaries
unlock blur

₹3.4 L/yr - ₹11.2 L/yr

Engineer
288 salaries
unlock blur

₹2.7 L/yr - ₹8.5 L/yr

Manager
263 salaries
unlock blur

₹6.2 L/yr - ₹26 L/yr

Explore more salaries
Compare Kalpataru Projects International with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview