Construction activities at site can be managed by effective planning, coordination, communication, and supervision.
Develop a detailed project plan outlining tasks, timelines, and resources.
Regularly communicate with all stakeholders including contractors, suppliers, and team members.
Ensure proper coordination between different teams and departments involved in the project.
Implement strict quality control measures to ma...
Top trending discussions
posted on 1 Jul 2024
posted on 11 Dec 2023
The process of building survey involves several steps to assess the condition and suitability of a building.
Determine the purpose of the survey and the scope of work
Conduct a visual inspection of the building's exterior and interior
Identify any structural issues, such as cracks or signs of deterioration
Assess the building's systems, including electrical, plumbing, and HVAC
Evaluate the building's compliance with buildin...
Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.
Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.
It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.
The development length can vary depending on the ...
Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.
Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.
It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.
Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.
Pr...
The circumstances of handing over the flat to Clint
The flat was handed over to Clint after completing all necessary paperwork
The condition of the flat was documented before handing it over to Clint
Keys and access cards were provided to Clint
Any outstanding payments or dues were settled before the handover
posted on 6 Apr 2024
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
posted on 14 Feb 2023
posted on 14 Aug 2021
Efficient team leading requires clear communication, delegation, and motivation.
Establish clear goals and expectations
Delegate tasks based on team members' strengths
Provide regular feedback and recognition
Encourage open communication and collaboration
Lead by example and maintain a positive attitude
posted on 28 Oct 2022
I applied via Approached by Company and was interviewed before Oct 2021. There were 2 interview rounds.
posted on 7 Oct 2023
I applied via Company Website and was interviewed in Apr 2023. There were 4 interview rounds.
posted on 24 Jul 2023
Interview experience
based on 2 reviews
Rating in categories
Deputy Manager
606
salaries
| ₹5.1 L/yr - ₹18 L/yr |
Assistant Manager
524
salaries
| ₹3.8 L/yr - ₹14.8 L/yr |
Senior Engineer
522
salaries
| ₹3.4 L/yr - ₹10.6 L/yr |
Civil Engineer
247
salaries
| ₹2 L/yr - ₹7.7 L/yr |
Manager
242
salaries
| ₹6.2 L/yr - ₹24 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power