i
JSW One Platforms
Filter interviews by
I applied via Referral and was interviewed in Apr 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.
I use frameworks such as RICE, Kano model, Value vs. Effort matrix for roadmap prioritisation.
RICE framework helps prioritize features based on Reach, Impact, Confidence, and Effort.
Kano model categorizes features into basic, performance, and delighters to prioritize based on customer satisfaction.
Value vs. Effort matrix helps in prioritizing features by comparing their value to the effort required.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There were 2 interview rounds.
The process for installing a fan for plant operations involves planning, preparation, installation, and testing.
Plan the location of the fan for optimal air circulation
Prepare the necessary tools and equipment for installation
Install the fan according to manufacturer's instructions
Test the fan to ensure proper functioning
Ensure proper maintenance and regular checks for optimal performance
The heat consumption required for manufacturing 1 metric ton of cement varies depending on the type of cement and production process.
Heat consumption can range from 3.6 - 6.0 GJ per metric ton of cement produced.
Factors such as the type of kiln used, fuel type, and energy efficiency measures can impact heat consumption.
For example, dry process cement production typically requires less heat compared to wet process produ
Daily job responsibilities include overseeing production processes, managing staff, ensuring quality control, and meeting production targets.
Overseeing production processes to ensure efficiency and quality
Managing staff, including scheduling, training, and performance evaluations
Ensuring quality control measures are in place and followed
Meeting production targets and deadlines
Collaborating with other departments to opt
Balancing raw materials in production involves accurately measuring and adjusting the quantities of each material to ensure optimal production output.
Calculate the required quantities of each raw material based on the production schedule
Monitor the inventory levels of each raw material to avoid shortages or excess
Adjust the amounts of raw materials used in production based on quality control standards
Utilize software s...
posted on 15 Jun 2024
PC firing refers to the type of firing system used in a power plant's boiler to ignite the fuel.
PC firing stands for Pulverized Coal firing, where coal is ground into fine powder before being injected into the boiler combustion chamber
It is a common method used in coal-fired power plants to efficiently burn coal and generate steam for electricity production
Other types of firing systems include fluidized bed combustion
The type of cooler house depends on the specific requirements of the production process, such as air flow, temperature control, and size.
Cooling towers for large-scale industrial production
Air conditioning units for smaller production facilities
Evaporative coolers for energy-efficient cooling solutions
Refrigeration units for temperature-sensitive production processes
The preheater stage in cement production is the calciner stage.
The preheater typically consists of several stages including the cyclones and the calciner.
The calciner stage is where the raw materials are heated to high temperatures before entering the rotary kiln.
The calciner stage helps to reduce the energy consumption in the rotary kiln by preheating the raw materials.
An example of a preheater configuration is a 4-st
Capacity planning is crucial for ensuring optimal production output and resource utilization.
Capacity planning involves assessing current production capacity and forecasting future needs.
Factors to consider include equipment capabilities, workforce availability, and production demand.
Examples of capacity planning tools include production scheduling software and simulation models.
posted on 27 Jan 2025
Basic Knowledge of maths
posted on 2 Jan 2022
I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.
posted on 30 Jan 2022
I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.
based on 2 interviews
Interview experience
based on 1 review
Rating in categories
Assistant Manager
177
salaries
| ₹4.5 L/yr - ₹11.5 L/yr |
Deputy Manager
54
salaries
| ₹9.2 L/yr - ₹15 L/yr |
Senior Manager
35
salaries
| ₹16.9 L/yr - ₹31.1 L/yr |
Sales Manager
26
salaries
| ₹6 L/yr - ₹21.5 L/yr |
Senior Product Manager
26
salaries
| ₹28 L/yr - ₹52 L/yr |
Tata Group
Reliance Industries
Adani Group
Bharti Enterprises