Sequencing in planning refers to determining the order in which tasks or activities should be completed to achieve project goals.
Sequencing involves identifying dependencies between tasks to ensure that they are completed in the correct order.
It helps in creating a logical flow of work and avoiding bottlenecks in the project timeline.
Examples include creating a Gantt chart to visualize the sequence of tasks and using t...
S-Curve can be plotted by using a graph with time on the x-axis and cumulative costs or progress on the y-axis.
Start by creating a graph with time on the x-axis and cumulative costs or progress on the y-axis.
Plot the initial phase of slow progress or low costs at the beginning of the curve.
As time progresses, the curve should show an increase in progress or costs at an accelerating rate.
Towards the end of the project, ...
Productivity is the measure of efficiency in completing tasks or achieving goals.
Productivity is the ratio of output to input in a specific period of time.
It can be measured by the amount of work completed or goals achieved in a given time frame.
Examples include completing a project ahead of schedule, increasing sales revenue, or reducing costs while maintaining quality.
I applied via Recruitment Consulltant and was interviewed in May 2024. There were 2 interview rounds.
Fire dampers are devices installed in ducts to prevent the spread of fire and smoke throughout a building.
Fire dampers are typically installed in HVAC ductwork to close off airflow in the event of a fire.
They are activated by a fusible link that melts at high temperatures, causing the damper to close.
Fire dampers help contain fire and smoke within a specific area of a building, preventing it from spreading to other are...
AHU components include filters, coils, fans, dampers, and controls, each serving a specific function in the air handling process.
Filters: remove dust and particles from the air
Coils: heat or cool the air as needed
Fans: circulate the air throughout the system
Dampers: control the flow of air
Controls: regulate the overall operation of the AHU
I applied via LinkedIn and was interviewed in Nov 2023. There were 2 interview rounds.
I expect a competitive salary based on my qualifications, experience, and the responsibilities of the Assistant Project Leader role.
I am looking for a salary that reflects my skills and expertise in project management.
I have researched the market rates for Assistant Project Leader positions and have a realistic expectation.
I am open to negotiation and willing to consider other benefits or incentives in addition to the ...
The cop range of chillers refers to the Coefficient of Performance, which is a measure of the efficiency of a chiller system.
The COP range of chillers typically varies depending on the type and size of the chiller.
Higher COP values indicate greater efficiency in cooling.
For example, a typical air-cooled chiller may have a COP range of 3-6, while a water-cooled chiller may have a COP range of 4-7.
JLL interview questions for designations
I applied via Referral and was interviewed in Apr 2024. There was 1 interview round.
Project execution process and documention
Get interview-ready with Top JLL Interview Questions
I applied via Campus Placement and was interviewed in Apr 2023. There were 3 interview rounds.
Project management and process
I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Sep 2023. There was 1 interview round.
Market rates of construction materials vary depending on location, demand, and supply.
Market rates for construction materials fluctuate based on factors like location, demand, and supply
Prices can vary significantly between regions and even within the same city
For example, the price of cement in one city may be higher due to increased demand for construction projects
It is important to regularly monitor market rates to
I applied via Walk-in and was interviewed before Dec 2022. There were 3 interview rounds.
1 Interview rounds
based on 89 reviews
Rating in categories
Assistant Manager
1k
salaries
| ₹3.5 L/yr - ₹14.2 L/yr |
Facility Executive
1k
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Senior Analyst
561
salaries
| ₹3 L/yr - ₹10 L/yr |
Assistant Project Leader
511
salaries
| ₹3.3 L/yr - ₹11.5 L/yr |
Assistant Facility Manager
484
salaries
| ₹3 L/yr - ₹10.3 L/yr |
CBRE
Colliers India
Cushman & Wakefield
Knight Frank