i
JK Cement
Filter interviews by
I applied via Company Website and was interviewed before Apr 2021. There were 2 interview rounds.
LRS maintenance and troubleshooting involves the regular upkeep and identification of issues in electrical systems.
LRS stands for Low Resistance System, which is used to control and protect electrical equipment.
Maintenance of LRS includes regular inspections, cleaning, and testing of components to ensure proper functioning.
Troubleshooting involves identifying and resolving issues such as faulty connections, damaged com...
GRR maintenance and troubleshooting refers to the process of ensuring the proper functioning and resolving issues related to GRR systems.
GRR stands for Grounding, Resistance, and Reactance.
Maintenance involves regular inspections, testing, and repairs to ensure the system is functioning optimally.
Troubleshooting involves identifying and resolving any issues or malfunctions in the GRR system.
Examples of troubleshooting ...
Top trending discussions
posted on 5 Jan 2025
I applied via Newspaper Ad and was interviewed in Jul 2024. There were 3 interview rounds.
General aptitude and logical reasoning
posted on 18 Nov 2024
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
A motor is a device that converts electrical energy into mechanical energy to produce motion.
Converts electrical energy into mechanical energy
Produces motion
Common types include AC motors and DC motors
A transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction.
Consists of primary and secondary coils
Works on the principle of electromagnetic induction
Used to step up or step down voltage levels
Examples: power transformers, distribution transformers
PCC stands for Power Control Center.
PCC is a type of electrical distribution panel used to control power supply to various electrical equipment.
It helps in distributing power to different circuits and equipment in an organized manner.
PCCs are commonly used in industrial settings to manage power distribution efficiently.
posted on 10 Jun 2023
posted on 12 Sep 2023
posted on 3 Jan 2024
I applied via Campus Placement and was interviewed in Jul 2023. There was 1 interview round.
posted on 18 Nov 2023
I applied via Job Portal and was interviewed before Nov 2022. There were 4 interview rounds.
I applied via Campus Placement and was interviewed in Nov 2021. There was 1 interview round.
posted on 9 May 2022
I applied via LinkedIn and was interviewed in Nov 2021. There were 4 interview rounds.
Advance electrical
based on 3 reviews
Rating in categories
Assistant Manager
528
salaries
| ₹6.3 L/yr - ₹16 L/yr |
Marketing Executive
275
salaries
| ₹2.4 L/yr - ₹8.7 L/yr |
Senior Marketing Executive
237
salaries
| ₹5.5 L/yr - ₹12 L/yr |
Deputy Manager
234
salaries
| ₹7.5 L/yr - ₹20 L/yr |
Area Sales Manager
227
salaries
| ₹6 L/yr - ₹20 L/yr |
UltraTech Cement
Ambuja Cements
ACC
Shree Cement