Filter interviews by
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
Daily MIS reports provide management with key insights and data to make informed decisions.
Daily MIS reports should include key performance indicators (KPIs) such as sales numbers, conversion rates, and customer acquisition costs.
These reports help management track progress towards goals and identify areas for improvement.
Examples of daily MIS reports could include a summary of sales activities, a comparison of actual ...
I applied via Company Website and was interviewed in Aug 2021. There was 1 interview round.
Fault level is the maximum current that can flow through a power system during a fault.
Fault level is a measure of the system's ability to handle fault currents.
It is important to calculate fault level to ensure the safety and reliability of the power system.
Fault level can be calculated by considering the impedance of the system and the available fault current sources.
The calculation involves determining the maximum f...
I would assess the situation, prioritize based on urgency and impact on operations, and make a fair decision considering the needs of the team and the business.
Assess the reasons for leave requests - urgent personal matters, planned vacations, etc.
Prioritize based on urgency and impact on operations - critical tasks, team workload, upcoming deadlines.
Consider alternative solutions - shifting schedules, temporary replac...
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 4 interview rounds.
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
I applied via Campus Placement and was interviewed before Jul 2022. There were 4 interview rounds.
Basic Aptitude questions and options to attenpt
General topic to discussed and concluded finally
I applied via Walk-in and was interviewed before Aug 2020. There was 1 interview round.
Flushing and pickling are processes used to clean and protect hydraulic systems.
Flushing involves removing contaminants and debris from the system using a flushing fluid.
Pickling involves applying a protective coating to the system to prevent corrosion.
Both processes are important for maintaining the performance and longevity of hydraulic systems.
Examples of flushing fluids include water, solvents, and specialized flus...
Preventive maintenance is planned maintenance to prevent breakdowns, while breakdown maintenance is repairing equipment after it has failed.
Preventive maintenance is scheduled and proactive
Breakdown maintenance is reactive and occurs after equipment failure
Preventive maintenance reduces downtime and increases equipment lifespan
Breakdown maintenance can be costly and cause production delays
Examples of preventive mainten...
I applied via Referral and was interviewed before Nov 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before May 2020. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 7 reviews
Rating in categories
Assistant Manager
2.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
977
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
763
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
615
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
Vedanta Limited