Filter interviews by
Problem solving techniques involve identifying the issue, analyzing it, developing solutions, and implementing them.
Identify the problem by gathering information and defining the issue
Analyze the problem by breaking it down into smaller parts and examining each part
Develop solutions by brainstorming, evaluating options, and selecting the best one
Implement the solution by creating an action plan and following through wi...
Top trending discussions
I was interviewed in Feb 2025.
I applied via Approached by Company and was interviewed in Dec 2024. There was 1 interview round.
Some things like product knowledge, channel partners.
I applied via Naukri.com and was interviewed in Mar 2024. There were 3 interview rounds.
I am currently located in New York City.
Living in a bustling urban environment
Close proximity to various amenities and attractions
Access to public transportation
Diverse cultural experiences
Examples: Times Square, Central Park, Broadway shows
As an Assistant Manager, my job role involves supporting the manager in overseeing daily operations, managing staff, and ensuring the smooth running of the business.
Supporting the manager in daily operations
Managing and supervising staff
Ensuring compliance with company policies and procedures
Assisting in developing and implementing strategies to improve business performance
Handling customer complaints and resolving iss...
I am a dedicated and organized individual with strong leadership skills and a passion for helping others succeed.
Dedicated and hardworking
Strong leadership skills
Passionate about helping others succeed
An erection plan is a detailed document outlining the steps and timeline for constructing a building or structure.
Includes detailed schedule of tasks and milestones
Specifies materials and equipment needed for each phase
Outlines safety measures and quality control procedures
May include diagrams or blueprints for reference
Handling complexity involves breaking down tasks, prioritizing, delegating, and staying organized.
Break down complex tasks into smaller, manageable steps
Prioritize tasks based on importance and deadlines
Delegate tasks to team members when necessary
Stay organized with to-do lists, calendars, and project management tools
I applied via Approached by Company and was interviewed in May 2024. There were 2 interview rounds.
Discuss About Network Expansion, Product Growth, Target Achivement, Market Competitor Information, Market Opportunity, Sale Volume Growth, Warehouse Stock Management, Dispatch Process, Invoicing, Product Category, Market Price.
My CTC expectations are in line with industry standards for an Assistant Manager role.
Research industry standards for Assistant Manager CTC
Consider my experience, skills, and qualifications
Negotiate based on job responsibilities and company size
Provide a range rather than a specific number
I applied via Referral and was interviewed in Dec 2023. There were 4 interview rounds.
Spare parts are components used in boilers to replace damaged or worn-out parts and ensure their proper functioning.
Spare parts are essential for maintaining and repairing boilers.
They help in replacing faulty or damaged components to prevent breakdowns.
Examples of spare parts in boilers include valves, pumps, gaskets, and sensors.
Regular inspection and inventory management of spare parts are crucial for efficient boil...
Spare parts in a boiler are components that are kept on hand to replace any faulty or worn-out parts.
Spare parts ensure the smooth operation of a boiler by allowing for quick repairs and replacements.
Common spare parts in a boiler include valves, pumps, gaskets, pressure switches, and control boards.
Having spare parts readily available reduces downtime and increases the lifespan of the boiler.
Regular maintenance and in...
Boiler feed pump is used in power plants to supply water to the boiler at high pressure.
Boiler feed pump is a type of centrifugal pump.
It is used to deliver feedwater to the boiler at high pressure.
The pump increases the pressure of the water to overcome the boiler's pressure requirement.
It ensures a continuous supply of water to the boiler for steam generation.
The pump is typically driven by an electric motor or a ste...
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
11
salaries
| ₹5.6 L/yr - ₹8.5 L/yr |
Assistant Engineer
9
salaries
| ₹2.2 L/yr - ₹4.6 L/yr |
Electrician
8
salaries
| ₹2.4 L/yr - ₹3.2 L/yr |
Mechanical Engineer
8
salaries
| ₹3.8 L/yr - ₹5.4 L/yr |
Senior Executive
7
salaries
| ₹4 L/yr - ₹7.2 L/yr |
Tata Steel
Steel Authority Of India
JSW Steel
Reliance Industries