Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Jhajharia Nirman Limited Team. If you also belong to the team, you can get access from here

Jhajharia Nirman Limited Verified Tick

Compare button icon Compare button icon Compare
3.9

based on 101 Reviews

Filter interviews by

Jhajharia Nirman Limited Site Engineer Interview Questions and Answers

Updated 6 Jan 2023

Jhajharia Nirman Limited Site Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Questions ask on the basis of your experience, expertise.
  • Q2. What kind of foundation you did in your previous company ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company ,work life balance ,and most important you will give ample amount of leaves in this company.
Strong one is job security .

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Size of steel used for columns
  • Ans. 

    The size of steel used for columns depends on the load it needs to support and the height of the column.

    • The size of steel columns is typically specified by their dimensions in terms of width, depth, and thickness.

    • The size of steel columns can also be determined based on the structural design calculations and building codes.

    • Common sizes for steel columns include W6x9, W8x10, and W10x12, where the first number represents...

  • Answered by AI
  • Q2. Development bars length
  • Ans. 

    Development bars length refers to the length of reinforcement bars used in construction to provide strength and stability.

    • Development bars length is determined based on structural design requirements.

    • It is important to follow the specifications provided by the structural engineer.

    • The length of development bars can vary depending on the type of structure and load requirements.

    • Proper placement and anchoring of developmen

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. What is base course
  • Ans. 

    Base course is a layer of material laid on the subgrade to provide a stable foundation for pavement construction.

    • Base course is typically made of crushed stone, gravel, or recycled concrete.

    • It is placed on top of the subgrade and compacted to provide a solid base for the pavement.

    • The thickness and type of base course used depend on the specific project requirements.

    • Base course helps to distribute the load of the paveme...

  • Answered by AI
  • Q2. Discuss shallow foundation
  • Ans. 

    Shallow foundations are used when the soil near the surface has sufficient bearing capacity to support the structure.

    • Shallow foundations are typically used for small to medium-sized structures.

    • They are placed near the ground surface and spread the load over a larger area.

    • Common types of shallow foundations include spread footings, mat foundations, and slab-on-grade foundations.

    • Shallow foundations are cost-effective and...

  • Answered by AI
  • Q3. What did u know

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Nov 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. : What are some of the biggest challenges civil engineers face?
  • Ans. 

    Some of the biggest challenges civil engineers face include managing project budgets, dealing with unexpected site conditions, and ensuring compliance with regulations.

    • Managing project budgets effectively to avoid cost overruns

    • Dealing with unexpected site conditions such as soil instability or environmental hazards

    • Ensuring compliance with regulations and obtaining necessary permits

    • Balancing the needs of various stakeho...

  • Answered by AI
  • Q2. What is your favorite role on a project team? How do you react to a task you're not sure how to approach?
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

What is the colume
The vertical part of the building and base of the slab, distribution of load

Round 2 - One-on-one 

(2 Questions)

  • Q1. What is the footing
  • Q2. The base of the building
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Size of steel used for columns
  • Ans. 

    The size of steel used for columns depends on the load it needs to support and the height of the column.

    • The size of steel columns is typically specified by their dimensions in terms of width, depth, and thickness.

    • The size of steel columns can also be determined based on the structural design calculations and building codes.

    • Common sizes for steel columns include W6x9, W8x10, and W10x12, where the first number represents...

  • Answered by AI
  • Q2. Development bars length
  • Ans. 

    Development bars length refers to the length of reinforcement bars used in construction to provide strength and stability.

    • Development bars length is determined based on structural design requirements.

    • It is important to follow the specifications provided by the structural engineer.

    • The length of development bars can vary depending on the type of structure and load requirements.

    • Proper placement and anchoring of developmen

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. What is base course
  • Ans. 

    Base course is a layer of material laid on the subgrade to provide a stable foundation for pavement construction.

    • Base course is typically made of crushed stone, gravel, or recycled concrete.

    • It is placed on top of the subgrade and compacted to provide a solid base for the pavement.

    • The thickness and type of base course used depend on the specific project requirements.

    • Base course helps to distribute the load of the paveme...

  • Answered by AI
  • Q2. Discuss shallow foundation
  • Ans. 

    Shallow foundations are used when the soil near the surface has sufficient bearing capacity to support the structure.

    • Shallow foundations are typically used for small to medium-sized structures.

    • They are placed near the ground surface and spread the load over a larger area.

    • Common types of shallow foundations include spread footings, mat foundations, and slab-on-grade foundations.

    • Shallow foundations are cost-effective and...

  • Answered by AI
  • Q3. What did u know

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

Jhajharia Nirman Limited Interview FAQs

How many rounds are there in Jhajharia Nirman Limited Site Engineer interview?
Jhajharia Nirman Limited interview process usually has 2 rounds. The most common rounds in the Jhajharia Nirman Limited interview process are Resume Shortlist and Technical.

Tell us how to improve this page.

Jhajharia Nirman Limited Site Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Jhajharia Nirman Limited Site Engineer Salary
based on 45 salaries
₹1.8 L/yr - ₹4.8 L/yr
13% less than the average Site Engineer Salary in India
View more details

Jhajharia Nirman Limited Site Engineer Reviews and Ratings

based on 8 reviews

3.7/5

Rating in categories

4.4

Skill development

3.6

Work-life balance

3.1

Salary

3.9

Job security

3.6

Company culture

3.2

Promotions

3.8

Work satisfaction

Explore 8 Reviews and Ratings
Site Engineer
45 salaries
unlock blur

₹1.8 L/yr - ₹4.8 L/yr

Civil Site Engineer
42 salaries
unlock blur

₹1.8 L/yr - ₹4.8 L/yr

Senior Engineer
16 salaries
unlock blur

₹4.5 L/yr - ₹7.2 L/yr

Safety Officer
8 salaries
unlock blur

₹3 L/yr - ₹3.8 L/yr

Project Engineer
8 salaries
unlock blur

₹3.2 L/yr - ₹6 L/yr

Explore more salaries
Compare Jhajharia Nirman Limited with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview