Filter interviews by
I applied via Campus Placement and was interviewed before Sep 2023. There was 1 interview round.
I applied via Company Website and was interviewed before Jun 2022. There were 3 interview rounds.
I applied via AmbitionBox and was interviewed before Jan 2023. There were 3 interview rounds.
Company details, and about my work
Top trending discussions
I applied via Referral and was interviewed before Aug 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.
A line diagram of a wind turbine generator (WTG) shows the flow of energy from wind to electricity.
The diagram typically includes the rotor blades, gearbox, generator, and power electronics
The blades capture wind energy and turn the rotor, which drives the gearbox
The gearbox increases the rotational speed and sends it to the generator
The generator converts the rotational energy into electrical energy
The power electroni...
DFIG converters are used in wind turbines to convert variable frequency AC power to DC power and back to AC power.
DFIG stands for Doubly Fed Induction Generator
The converter consists of two back-to-back voltage source converters
One converter controls the rotor current and the other controls the grid current
The rotor current is controlled to maintain a constant torque on the turbine
The grid current is controlled to main...
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
To check the problem in a windvane showing false reading, first ensure it is properly aligned and calibrated. Then check for any obstructions or damage.
Ensure the windvane is properly aligned and calibrated according to manufacturer's instructions.
Check for any obstructions such as debris or bird nests that may be affecting the vane's movement.
Inspect the vane for any damage or wear that could be causing inaccurate rea...
Manpower on site is controlled through proper scheduling, supervision, communication, and monitoring.
Create a detailed schedule outlining tasks, deadlines, and manpower requirements.
Assign specific roles and responsibilities to each team member.
Regularly communicate with the team to ensure everyone is on the same page.
Supervise the work progress and address any issues or delays promptly.
Monitor the performance of each ...
posted on 16 Mar 2023
I applied via Approached by Company and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Nov 2020. There were 5 interview rounds.
HVDC stands for High Voltage Direct Current. It is a system used for transmitting high voltage electricity over long distances.
HVDC systems are used to transmit electricity over long distances with minimal losses.
They are more efficient than traditional AC systems for long-distance transmission.
HVDC systems use converters to convert AC power to DC power and vice versa.
Examples of HVDC systems include the Itaipu HVDC sy...
A rectifier is an electronic device that converts AC to DC.
Rectifiers are commonly used in power supplies to convert AC voltage to DC voltage.
They can be made using diodes or other semiconductor devices.
Rectifiers are essential for many electronic devices to function properly.
Examples of rectifiers include bridge rectifiers, half-wave rectifiers, and full-wave rectifiers.
I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.
based on 4 interviews
Interview experience
based on 30 reviews
Rating in categories
Service Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Field Service Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Quality Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrician
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Power
Adani Green Energy
Azure Power
Hero Future Energies