i
Infra.Market
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Campus Placement and was interviewed before Sep 2022. There were 2 interview rounds.
Problems faced in Ready Mix Concrete (RMC) production and delivery
Quality control issues leading to inconsistent concrete strength
Logistical challenges in transporting concrete to construction sites
Equipment breakdowns causing delays in production
Environmental concerns related to waste disposal and water usage
High initial setup costs for RMC plants
Top trending discussions
posted on 9 Oct 2022
I applied via Approached by Company and was interviewed before Oct 2021. There were 2 interview rounds.
Implemented energy-efficient measures and optimized procurement processes resulting in significant cost savings.
Introduced LED lighting and motion sensors to reduce electricity consumption
Negotiated better deals with suppliers and implemented a centralized procurement system
Implemented a waste reduction program to minimize material waste and disposal costs
Introduced remote working options to reduce office space and ass
MTTR and MTBF can be improved through proper maintenance and repair strategies.
Regular maintenance and inspections can help identify and prevent potential issues before they occur.
Using high-quality parts and equipment can increase the reliability and lifespan of machinery.
Implementing a proactive maintenance approach, such as predictive maintenance, can reduce downtime and increase MTBF.
Training and educating staff on...
posted on 10 Sep 2020
I applied via Campus Placement and was interviewed before Sep 2019. There were 4 interview rounds.
posted on 12 Oct 2020
I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.
posted on 18 Jan 2020
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Maintain elevation of underground piping by using level instruments and proper installation techniques.
Use a level instrument to check the elevation of the piping during installation.
Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.
Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.
Consider using supports o...
In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer complaints and resolved issues in a timely manner
Created and implemented strategies to improve efficiency and productivity
Collaborated with other departments to achieve company goals
Conducted performanc
Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.
Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.
Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.
Cast iron electrodes have a high nickel content to prevent cracking.
Aluminum electrodes have a special coating ...
posted on 11 May 2018
I was interviewed before Mar 2020.
posted on 25 Mar 2022
I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.
posted on 23 Oct 2021
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 2 May 2021
based on 1 interview
Interview experience
based on 9 reviews
Rating in categories
Assistant Manager
126
salaries
| ₹0 L/yr - ₹0 L/yr |
Business Development Manager
104
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Executive
78
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Accountant
74
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Sales Executive
63
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
UltraTech Cement
Larsen & Toubro Limited
ACC