Filter interviews by
Testing methods and standards refer to the processes and criteria used to ensure the quality and reliability of products or services.
Testing methods include manual testing, automated testing, regression testing, and performance testing.
Standards such as ISO 9001, CMMI, and IEEE define best practices for quality assurance.
Adhering to testing methods and standards helps identify defects early and improve overall product ...
QMS stands for Quality Management System, which is a set of policies, processes, and procedures required for planning and execution in the core business area of an organization.
QMS is a systematic approach to managing quality throughout the organization.
Certification process involves an external certification body assessing the organization's QMS against a specific standard (e.g. ISO 9001).
Certification demonstrates th...
I applied via Walk-in
I am a detail-oriented Quality Inspector with experience in ensuring product quality and compliance.
Experienced in conducting inspections and tests to identify defects and deviations from specifications
Proficient in using various measuring tools and equipment
Skilled in interpreting blueprints and technical drawings
Knowledgeable in quality control standards and procedures
Strong attention to detail and ability to maintai...
You should work with us because we offer a supportive work environment, opportunities for growth, and a commitment to quality.
Supportive work environment: We prioritize teamwork and collaboration, creating a positive atmosphere.
Opportunities for growth: We provide training and development programs to help you enhance your skills and advance in your career.
Commitment to quality: We value excellence and strive to maintai...
Top trending discussions
posted on 19 Dec 2024
I am applying for this job because of my passion for managing civil projects and my proven track record of successful project completions.
Passion for managing civil projects
Proven track record of successful project completions
Excited about the opportunity to contribute to impactful infrastructure projects
I requested a salary hike due to increased responsibilities, achievements, and market value.
Increased responsibilities in current role
Achievements such as successful completion of projects or exceeding targets
Market value based on industry standards and experience
Cost of living increase or inflation affecting expenses
The various stages of construction of the foundation of a building include site preparation, excavation, foundation design, footing construction, and foundation pouring.
Site preparation involves clearing the area and leveling the ground for construction.
Excavation is the process of digging a hole in the ground to create space for the foundation.
Foundation design is crucial to ensure the building's stability and load-be...
The design mix for concrete is the proportion of various ingredients like cement, sand, aggregates, and water to achieve the desired strength and durability.
Design mix is determined based on the required strength and durability of the concrete
It involves selecting the right proportions of cement, sand, aggregates, and water
Various factors like type of construction, exposure conditions, and desired workability influence...
I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.
Very nicely & strictly selected
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.
MTTR stands for Mean Time To Repair and MTBF stands for Mean Time Between Failures.
MTTR is the average time taken to repair a failed component or system.
MTBF is the average time between failures of a component or system.
MTTR is calculated as total downtime divided by the number of failures.
MTBF is calculated as total uptime divided by the number of failures.
For example, if a system has an MTTR of 2 hours and an MTBF of...
Data type string in PLC is used to store alphanumeric characters or text data.
String data type is used to store text data in PLC programming.
Strings can be used to store alphanumeric characters, words, sentences, etc.
Example: STRING name := 'John Smith';
posted on 22 Jul 2024
I applied via Company Website
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
2 hours of psychometric test including English test
I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.
Creating and updating of safety manuals, SOPs, WIs, OPLs, records for effective awareness in shop floor Safety
based on 54 reviews
Rating in categories
Quality Engineer
27
salaries
| ₹2.3 L/yr - ₹3.6 L/yr |
Junior Engineer
12
salaries
| ₹2 L/yr - ₹3 L/yr |
Engineer
10
salaries
| ₹2.3 L/yr - ₹4 L/yr |
Production Engineer
8
salaries
| ₹2.4 L/yr - ₹4 L/yr |
Senior Quality Engineer
7
salaries
| ₹2.5 L/yr - ₹4 L/yr |
Bharat Forge
Tata Steel
Jindal Steel and Power
Hindalco Industries