Interview preparation tips for other job seekers - This,company Construction contractor Toll Plaza, Foot Over bridge, MS Steel Structures and Civil Construction work.

Interview questions from similar companies

I applied via Walk-in and was interviewed before Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Field of your work
  • Ans. 

    I work in the field of software engineering.

    • Developing and maintaining software applications

    • Designing and implementing software solutions

    • Collaborating with cross-functional teams

    • Troubleshooting and debugging software issues

    • Ensuring code quality and adherence to best practices

  • Answered by AI
  • Q2. What about your work
  • Q3. Complete plumbing and firefighting work including STP,WTP,S.POOL, and external sewerage system and storm water and firefighting work and water supply too
  • Q4. Tell about pipes you used at project
  • Q5. GI in water supply and ci ln soil and waste, glazed stoneware in external sewerage system and RCC in storm water,MS in firefighting

Interview Preparation Tips

Interview preparation tips for other job seekers - Well and good
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.

I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well for technical questions I.e. mep related question and software like autocad ms excel etc
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join their Site billing profile.They suck at their system and there is nothing such Client approach towards the project.It's kind of In-house and chosen vendors for their projects are so bad that site billing will suffer and you will be blamed.

I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Deduction in shuttering criteria
  • Ans. 

    Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.

    • Deduction in shuttering criteria is done to reduce the cost of construction.

    • It is also done to reduce the time taken for construction.

    • The deduction is usually done based on the strength of the concrete being used.

    • For example, if the concrete strength is high, less shuttering material is required.

    • The deduct...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepared yourself for interview to get selection
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

Interview Preparation Tips

Interview preparation tips for other job seekers - Please feel free to share the skills you have mastered and identify one area in which you believe you excel compared to others.

Imaginearc Infrastructure Interview FAQs

How many rounds are there in Imaginearc Infrastructure Site Engineer interview?
Imaginearc Infrastructure interview process usually has 2 rounds. The most common rounds in the Imaginearc Infrastructure interview process are Aptitude Test and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

Sunteck Realty Interview Questions
3.3
 • 23 Interviews
ASSA ABLOY Interview Questions
3.5
 • 17 Interviews
Pittie Group Interview Questions
2.7
 • 16 Interviews
Ambience Group Interview Questions
3.4
 • 16 Interviews
Alpha Corp Interview Questions
4.4
 • 14 Interviews
Pin Click Interview Questions
3.2
 • 12 Interviews
91springboard Interview Questions
3.6
 • 11 Interviews
View all
Imaginearc Infrastructure Site Engineer Salary
based on 5 salaries
₹1.6 L/yr - ₹3 L/yr
40% less than the average Site Engineer Salary in India
View more details

Imaginearc Infrastructure Site Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

4.0

Work-life balance

3.0

Salary

3.0

Job security

4.0

Company culture

4.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Site Engineer
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Structural Design Engineer
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive Accountant
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager
3 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Imaginearc Infrastructure with

Signature Global

3.9
Compare

Sunteck Realty

3.3
Compare

Pittie Group

2.7
Compare

Pin Click

3.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview