I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
posted on 21 Jul 2024
Materials can be received through purchase orders, deliveries, or transfers. The basic procedure involves receiving, inspecting, documenting, and storing the materials.
Materials can be received through purchase orders placed with suppliers.
Deliveries can be made directly to the storage location or to a designated receiving area.
Materials can also be received through transfers from other departments or locations.
The bas...
Client material receipt/BOQ items procedure involves thorough inspection, documentation, and verification.
Upon receipt of client materials, conduct thorough inspection for damages or discrepancies.
Document all received items in a log or system for tracking purposes.
Verify received items against the Bill of Quantities (BOQ) to ensure accuracy.
Report any issues or discrepancies to the relevant stakeholders for resolution...
I applied via Referral and was interviewed in May 2024. There were 3 interview rounds.
Project coordination involves overseeing and managing various aspects of a project to ensure successful completion.
Developing project plans and timelines
Coordinating with team members and stakeholders
Monitoring progress and addressing any issues
Ensuring project goals are met within budget and timeline
Communicating updates and milestones to stakeholders
I applied via Naukri.com and was interviewed before Nov 2021. There were 3 interview rounds.
Ind AS 116 is a new accounting standard for lease accounting.
Ind AS 116 replaces the previous standard Ind AS 17.
It requires lessees to recognize all leases on their balance sheet.
Lessees must also separate lease components from non-lease components.
It impacts financial statements, ratios, and covenants.
It became effective from April 1, 2019.
Example: A company leasing a building must recognize the lease liability and r
I was interviewed before Jan 2024.
The limit of pile settlement for vertiload testing is typically determined by the project specifications and design requirements.
The limit of pile settlement can vary depending on the type of structure being supported and the soil conditions
Common limits for pile settlement range from 10mm to 25mm
Settlement limits may also be specified in terms of a percentage of the pile diameter
Exceeding the allowable settlement limi...
IRC code for flexible pavement design
IRC: Indian Roads Congress
Flexible pavement design is covered in IRC:37-2012
IRC:37-2012 provides guidelines for design, construction, and maintenance of flexible pavements
Pile shifting limit refers to the maximum allowable movement of piles during construction.
Pile shifting limit is typically specified in the project specifications or design drawings.
Exceeding the pile shifting limit can lead to structural instability and potential failure.
Monitoring equipment such as inclinometers or settlement gauges may be used to track pile movement.
Adjustments to construction methods or pile design...
posted on 5 Jan 2025
I applied via Recruitment Consulltant and was interviewed in Dec 2024. There was 1 interview round.
Process of Goods receive, Material Issuence ,Inventory control ,Gate Pass of Job work Material
Logistics management Suppy Chain internet and CV.
Organization Amazon, Udaan and Dehaat skills assessment the same important working support.
posted on 26 Jan 2024
Introducing, departments related advice, wastage, cost control, handling store and material
posted on 21 Aug 2023
I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 4 interview rounds.
based on 1 interview
Interview experience
Assistant Manager
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Accounts Officer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Officer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Ashoka Buildcon
IRB Infrastructure
Patel Engineering
Reliance Infrastructure