Electronics based questions on sta ,mosfet etc
Setup and hold time are timing constraints in digital circuits to ensure proper operation of flip-flops.
Setup time is the minimum amount of time data must be stable before the clock edge for proper operation.
Hold time is the minimum amount of time data must be stable after the clock edge for proper operation.
Violating setup time can result in metastability issues.
Violating hold time can result in data corruption.
Exampl...
Top trending discussions
posted on 11 Jul 2023
I applied via Campus Placement and was interviewed in Jun 2023. There were 3 interview rounds.
Aptitude and reasoning questions
posted on 22 Mar 2022
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
A technical interview for Engineer Trainee covering topics such as CMOS, latch, flip flops, MOSFET, and dynamic memory.
CMOS stands for Complementary Metal-Oxide-Semiconductor and is a type of technology used in microprocessors and digital logic circuits.
A latch is a type of digital circuit that can store one bit of information.
The main difference between a latch and a flip flop is that a flip flop has a clock input and...
posted on 27 Feb 2024
I applied via Campus Placement
60 que 60 min aptitude+technical
I applied via campus placement at Oriental Institute of Science and Technology, Bhopal and was interviewed in Mar 2023. There were 3 interview rounds.
posted on 29 Mar 2022
I applied via Company Website and was interviewed in Oct 2021. There were 5 interview rounds.
posted on 11 Jul 2023
I applied via Campus Placement and was interviewed in Jun 2023. There were 3 interview rounds.
Aptitude and reasoning questions
posted on 8 May 2022
I applied via Campus Placement and was interviewed in Apr 2022. There were 2 interview rounds.
posted on 24 Dec 2023
I applied via Approached by Company and was interviewed before Dec 2022. There were 2 interview rounds.
Check compressor by monitoring performance, inspecting for leaks, and listening for unusual noises.
Monitor performance by checking pressure levels and temperature readings.
Inspect for leaks by using a soap solution to detect air bubbles.
Listen for unusual noises such as knocking or rattling sounds.
Check for proper lubrication and ensure all connections are secure.
Inspect the compressor motor for any signs of overheatin
VCR's cycle involves recording and playback of video content using magnetic tape.
VCR records video content onto magnetic tape during the recording phase
During playback, the recorded video content is read from the tape and displayed on the screen
The cycle involves the user inserting a tape, recording content, and then playing back the recorded content
VCR's cycle can be represented in a diagram showing the flow of record
The machine may not work properly due to issues with the cooling system, such as low refrigerant levels or a malfunctioning compressor.
Low refrigerant levels can lead to inadequate cooling capacity
A malfunctioning compressor can result in poor cooling performance
Blocked air filters or condenser coils can restrict airflow and reduce cooling efficiency
Possible reasons for no cooling in a machine include dust in evaporator coil, lack of refrigerant, improper compressor pumping, and a chocked expansion valve.
Check for dust accumulation in the evaporator coil and clean if necessary
Inspect for any leaks or lack of refrigerant in the unit
Ensure the compressor is functioning properly and pumping refrigerant effectively
Check for any blockages or issues with the expansion v
based on 1 interview
Interview experience
Senior Engineer
52
salaries
| ₹6.5 L/yr - ₹17 L/yr |
Engineer
38
salaries
| ₹5 L/yr - ₹10.8 L/yr |
Senior Software Engineer
33
salaries
| ₹8.5 L/yr - ₹22.2 L/yr |
AI Engineer
27
salaries
| ₹5 L/yr - ₹11 L/yr |
Embedded Software Engineer
27
salaries
| ₹5 L/yr - ₹10.5 L/yr |
Sasken
Persistent Systems
LTIMindtree
L&T Technology Services