Filter interviews by
I applied via Naukri.com and was interviewed before Jan 2022. There were 3 interview rounds.
Vendor followups and planning when schedule not met
Regular follow-ups with vendors to ensure timely delivery
Identify the root cause of schedule delay and take corrective actions
Re-plan the production schedule with updated delivery dates
Communicate the revised schedule to all stakeholders
Monitor the progress and take necessary actions to ensure on-time delivery
Top trending discussions
posted on 16 Jul 2017
I was interviewed in Jan 2017.
Production is the process of creating goods or services through various steps and techniques.
Production involves transforming raw materials into finished products.
Steel is prepared by melting iron ore and adding other elements to achieve desired properties.
Raw materials are the basic substances used in production, such as iron ore for steel production.
Thermodynamics is the study of energy and its transformations in phy...
based on 2 reviews
Rating in categories
Engineer
47
salaries
| ₹2.3 L/yr - ₹4.8 L/yr |
Junior Engineer
42
salaries
| ₹2.1 L/yr - ₹4.8 L/yr |
Senior Engineer
27
salaries
| ₹4 L/yr - ₹7 L/yr |
Assistant Manager
23
salaries
| ₹5.6 L/yr - ₹8.5 L/yr |
Production Engineer
18
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
ArcelorMittal Nippon Steel