I applied via Referral

Round 1 - Technical 

(2 Questions)

  • Q1. Vrf Hvac chiller services Screw, scroll, Ahu Fcu
  • Q2. Hvac chiller service

Hvac Supervisor Interview Questions asked at other Companies

Q1. what would you do when you receive any complaint the room is not cooled?
View answer (1)

Site Engineer Interview Questions & Answers

user image AMAR SINGH PATEL

posted on 7 Jun 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Development length of tmt bar
  • Ans. 

    Development length of TMT bar is the length of the bar required to transfer the stress from concrete to the steel for proper bond.

    • Development length depends on the diameter of the bar, concrete strength, and bond strength.

    • It is usually calculated using empirical formulas provided by codes like IS 456.

    • Proper development length ensures that the bar does not slip out of the concrete under load.

    • Example: For a 20mm diameter...

  • Answered by AI
  • Q2. You read autocad drawing.?
  • Ans. 

    Yes, I am proficient in reading AutoCAD drawings.

    • I have experience interpreting various types of AutoCAD drawings such as architectural, structural, and mechanical.

    • I am familiar with different symbols, scales, and measurements used in AutoCAD drawings.

    • I can identify different components, dimensions, and annotations in the drawings.

    • I have used AutoCAD software to create and modify drawings as per project requirements.

  • Answered by AI

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (2)

I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Basic of our HVAC system
  • Q2. Permanent job offer
  • Q3. 20k salery

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing

Hvac Design Engineer Interview Questions asked at other Companies

Q1. How much are you proficient in Autocad layout design for HVAC system?
View answer (1)

Interview Questionnaire 

1 Question

  • Q1. HVAC DESIGN & DRAFTman, PLUMBING, Fir Fiting

Interview Preparation Tips

Interview preparation tips for other job seekers - Hello sir
I'm Asar Faisal
I'm Good work & Hard work
Meri soch ye h ki company mujhe kya degi ye koi maine nhi rakhta
Ki mai company ko kya de sakta hun company ke liye kaisa work Kar sakta hu

HVAC Systems interview questions for popular designations

 Hvac Design Engineer

 (1)

 Hvac Draughtsman

 (1)

 Hvac Supervisor

 (1)

 Site Engineer

 (1)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before May 2017.

Interview Questionnaire 

4 Questions

  • Q1. Good discussion with accounts team
  • Q2. Having good discussion with team
  • Q3. Good discussion for salary and others
  • Q4. Good company for working
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

Interview Questionnaire 

2 Questions

  • Q1. Type of pile , why we provide pile,pile dia , lvup vup svup type questions
  • Ans. 

    Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.

    • Types of piles include driven piles, bored piles, and screw piles.

    • Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.

    • The diameter of a pile is determined based on the load it needs to support and the soil conditions.

    • LVUP (Large...

  • Answered by AI
  • Q2. Mostly we use two types of pile (1) friction pile (2)end bearing pile

Interview Preparation Tips

Interview preparation tips for other job seekers - Please read MORTH AN

I applied via Walk-in and was interviewed in Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Layout plan of switching station and how many interruptor use in ssp?
  • Ans. 

    The layout plan of a switching station includes the arrangement of equipment and the number of interrupters used.

    • The layout plan of a switching station is designed to ensure efficient and safe operation.

    • It includes the arrangement of various equipment such as transformers, circuit breakers, and disconnect switches.

    • The number of interrupters used in a switching station depends on the size and capacity of the station.

    • Int...

  • Answered by AI
  • Q2. What's the function of Neutral section and section insulator in OHE
  • Ans. 

    The neutral section and section insulator in OHE have important functions in electrical systems.

    • The neutral section is used to provide a return path for the current in the electrical system.

    • It helps maintain the balance of electrical potential between the overhead wires and the ground.

    • The section insulator is used to electrically isolate different sections of the overhead wires.

    • It prevents the flow of current between a...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn railway standards policy and guidance from seniors and briefs about the execution work, list out materials and utilisations.

Interview Questionnaire 

6 Questions

  • Q1. Percentage of steel in pile
  • Ans. 

    The percentage of steel in a pile varies depending on the type and design of the pile.

    • The percentage of steel in a pile can range from 0% to over 90%.

    • The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.

    • Steel piles typically have a higher percentage of steel than other types of piles.

    • The percentage of steel in a pile can also affect its

  • Answered by AI
  • Q2. Pile built-up above cut off level as per IS code
  • Ans. 

    Pile built-up above cut off level as per IS code

    • IS code specifies the maximum allowable pile length above cut off level

    • Pile length above cut off level should not exceed 3 times the pile diameter

    • Built-up pile above cut off level can cause structural instability and failure

  • Answered by AI
  • Q3. Pile vertical tolerance as per IS code
  • Ans. 

    Vertical tolerance for piles as per IS code

    • As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm

    • This tolerance is applicable for both driven and cast-in-situ piles

    • The tolerance is measured at the top of the pile and at intervals of 3m along the length

    • If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken

  • Answered by AI
  • Q4. Pile concrete consumption +- tolerance
  • Ans. 

    Pile concrete consumption tolerance depends on various factors.

    • Pile diameter and length

    • Concrete mix design

    • Placement method

    • Quality control measures

    • Environmental conditions

    • Tolerance typically ranges from 5-10% of estimated consumption

    • Regular monitoring and adjustment of concrete consumption is necessary

  • Answered by AI
  • Q5. Unit weight of steel
  • Ans. 

    Unit weight of steel is 7850 kg/m³

    • The unit weight of steel is the weight of a specific volume of steel

    • It is measured in kilograms per cubic meter (kg/m³)

    • The unit weight of steel is 7850 kg/m³

    • This value may vary slightly depending on the composition and manufacturing process of the steel

  • Answered by AI
  • Q6. Contractor MB related

I applied via Recruitment Consultant and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Regarding Welding process, Painting, Coating System, NDT Inspection, Piping and Structural codes and acceptance.

Interview Preparation Tips

Interview preparation tips for other job seekers - Must have knowledge about different type of materials, welding process and Advanced Technology for Inspection.

Interview Questionnaire 

4 Questions

  • Q1. What is Water density?
  • Ans. 

    Water density is the mass per unit volume of water.

    • Water density is typically around 1000 kg/m^3 at 4 degrees Celsius.

    • It can vary slightly with temperature and salinity.

    • Water density is important in various fields such as oceanography, hydrology, and engineering.

  • Answered by AI
  • Q2. What is DLC & Thickness?
  • Ans. 

    DLC stands for Diamond-Like Carbon coating, which is a type of protective coating applied to surfaces. Thickness refers to the measurement of how thick the coating is.

    • DLC is a thin film coating that provides hardness, wear resistance, and low friction properties.

    • Thickness of DLC coating is typically measured in microns or nanometers.

    • Examples of applications include coating on cutting tools, automotive components, and m

  • Answered by AI
  • Q3. What is PQC And Dowel bar Dia?
  • Ans. 

    PQC stands for Pavement Quality Concrete and Dowel bar Dia refers to the diameter of dowel bars used in construction.

    • PQC is a type of concrete used in pavement construction to ensure durability and strength.

    • Dowel bar Dia refers to the diameter of dowel bars, which are used to transfer loads between slabs in concrete pavements.

    • For example, a common dowel bar Dia used in pavement construction is 32mm.

  • Answered by AI
  • Q4. What is work details for EMB?
  • Ans. 

    EMB stands for Electro-Magnetic Ballast, which is a device used to regulate the flow of electrical current in fluorescent lighting fixtures.

    • EMB is used in fluorescent lighting fixtures to control the flow of electrical current.

    • It helps to stabilize the current and prevent flickering or buzzing in the lights.

    • EMBs are commonly found in commercial buildings, offices, and industrial settings.

    • Examples of EMB brands include

  • Answered by AI

HVAC Systems Interview FAQs

How many rounds are there in HVAC Systems interview?
HVAC Systems interview process usually has 1-2 rounds. The most common rounds in the HVAC Systems interview process are Technical and Resume Shortlist.
What are the top questions asked in HVAC Systems interview?

Some of the top questions asked at the HVAC Systems interview -

  1. You read autocad drawin...read more
  2. Development length of tmt ...read more
  3. HVAC DESIGN & DRAFTman, PLUMBING, Fir Fiti...read more

Tell us how to improve this page.

HVAC Systems Interview Process

based on 3 interviews

Interview experience

4.7
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 733 Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
KEC International Interview Questions
4.1
 • 295 Interviews
Tata Technologies Interview Questions
3.6
 • 257 Interviews
TCE Interview Questions
3.8
 • 246 Interviews
View all

HVAC Systems Reviews and Ratings

based on 24 reviews

4.0/5

Rating in categories

3.8

Skill development

3.6

Work-life balance

3.7

Salary

3.8

Job security

3.5

Company culture

3.5

Promotions

3.7

Work satisfaction

Explore 24 Reviews and Ratings
Hvac Supervisor
7 salaries
unlock blur

₹1.9 L/yr - ₹8.6 L/yr

Project Engineer
5 salaries
unlock blur

₹2.8 L/yr - ₹6.1 L/yr

Site Engineer
5 salaries
unlock blur

₹2 L/yr - ₹3 L/yr

Hvac Draughtsman
5 salaries
unlock blur

₹1 L/yr - ₹3 L/yr

Hvac Site Engineer
5 salaries
unlock blur

₹1.5 L/yr - ₹3.3 L/yr

Explore more salaries
Compare HVAC Systems with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview