Upload Button Icon Add office photos

Filter interviews by

Husk Power Systems Transmission Lead Interview Questions and Answers

Updated 26 Nov 2022

Husk Power Systems Transmission Lead Interview Experiences

1 interview found

I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Why do you want to join our company?
  • Ans. 

    I want to join your company because of its strong reputation, innovative projects, and opportunities for growth.

    • Strong reputation: Your company is known for its high-quality work and excellent customer satisfaction.

    • Innovative projects: I am excited about the chance to work on cutting-edge technologies and contribute to groundbreaking solutions.

    • Opportunities for growth: Your company offers a clear career path and invest...

  • Answered by AI
  • Q2. What's your salary expectations?
  • Ans. 

    I would expect a salary that is competitive and reflective of my experience and skills.

    • Research the average salary range for Transmission Leads in your industry and location.

    • Consider your years of experience and any specialized skills or certifications you possess.

    • Factor in the responsibilities and scope of the role.

    • Be prepared to negotiate and discuss benefits and other compensation components.

  • Answered by AI
Round 3 - Technical 

(3 Questions)

  • Q1. What are the types of insulators used in distribution lines?
  • Ans. 

    The types of insulators used in distribution lines include pin insulators, suspension insulators, and strain insulators.

    • Pin insulators are used to support the conductor on the pole or tower.

    • Suspension insulators are used to hang the conductor from the crossarm.

    • Strain insulators are used to provide mechanical support and electrical insulation at the ends of the conductor spans.

    • Other types of insulators used in distribut...

  • Answered by AI
  • Q2. What is the pole to pole distance in short solar pv transmission system?
  • Ans. 

    The pole to pole distance in a short solar PV transmission system varies depending on the specific installation and requirements.

    • The pole to pole distance is determined by factors such as the location, terrain, and available space for installation.

    • In urban areas, the pole to pole distance may be shorter due to limited space.

    • In rural or open areas, the pole to pole distance can be longer to accommodate larger solar arra...

  • Answered by AI
  • Q3. Name the cable used for 25 to 30 KWp solar mini grid transmission line?
  • Ans. 

    The cable used for 25 to 30 KWp solar mini grid transmission line is typically an aluminum or copper conductor cable.

    • Aluminum or copper conductor cables are commonly used for solar mini grid transmission lines.

    • The cable size and type may vary depending on the specific requirements of the installation.

    • For higher power transmission, larger cable sizes may be necessary to minimize power losses.

    • Examples of commonly used ca...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Husk Power Systems Transmission Lead interview:
  • Power System
  • Transmission Line
  • Basic Electrical
  • Electrical Machines
Interview preparation tips for other job seekers - Never lose hope and try to be confident in your answer when you are knowing it correctly.

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. Relocate to any location in India
  • Q2. Basic techanical question and prefer experience of wind sector

Interview Preparation Tips

Interview preparation tips for other job seekers - Technology and DFIG system

I applied via Walk-in and was interviewed in Oct 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. About Machinery matters

Interview Preparation Tips

Interview preparation tips for other job seekers - Self Confidence Need to Priority

I applied via Referral and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Current jd

Interview Preparation Tips

Interview preparation tips for other job seekers - Current job description and ready to work all over india

I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Speak about your responsibility/role in the project mentioned in the resume ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Experience and salary expectation
Round 2 - Technical 

(1 Question)

  • Q1. Product knowledge

Design Engineer Interview Questions & Answers

Siemens Energy user image Jadhav Akshay Nandlal

posted on 7 May 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Mostly covers on GD&T
  • Q2. Drawing reading
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Basic GD&T and knowledge about compressors
Round 3 - Design Test 

(1 Question)

  • Q1. Need to do both modelling and drafting

I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Expertise in working on SAP
  • Ans. 

    I have extensive experience working with SAP, including implementation, customization, and troubleshooting.

    • Implemented SAP modules such as FI/CO, MM, and SD

    • Customized SAP reports and forms using ABAP programming language

    • Troubleshot and resolved SAP system issues

    • Trained end-users on SAP functionality and best practices

  • Answered by AI
  • Q2. Latest update under GST and knowledge of revenue recognition concept.

Interview Preparation Tips

Interview preparation tips for other job seekers - Take the knowledge on HSS, Import procedures, SAP, Revenue recognition concept.

Skills evaluated in this interview

Round 1 - One-on-one 

(1 Question)

  • Q1. Mostly the questions are related to resume and UG NX

Interview Preparation Tips

Interview preparation tips for other job seekers - For 1-3 yrs experience in NX, tool test is important criteria
They will ask questions releted to resume and those are relatively easy technical question.

Husk Power Systems Interview FAQs

How many rounds are there in Husk Power Systems Transmission Lead interview?
Husk Power Systems interview process usually has 3 rounds. The most common rounds in the Husk Power Systems interview process are Resume Shortlist, HR and Technical.
What are the top questions asked in Husk Power Systems Transmission Lead interview?

Some of the top questions asked at the Husk Power Systems Transmission Lead interview -

  1. What is the pole to pole distance in short solar pv transmission syst...read more
  2. What are the types of insulators used in distribution lin...read more
  3. Name the cable used for 25 to 30 KWp solar mini grid transmission li...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

ReNew Interview Questions
4.2
 • 87 Interviews
Vestas Interview Questions
4.3
 • 83 Interviews
Jakson Group Interview Questions
4.3
 • 78 Interviews
Siemens Energy Interview Questions
4.1
 • 73 Interviews
Waaree Energies Interview Questions
3.9
 • 57 Interviews
Inox Wind Interview Questions
3.7
 • 37 Interviews
Sterlite Power Interview Questions
4.0
 • 25 Interviews
Avaada Energy Interview Questions
4.4
 • 23 Interviews
View all
Area Sales Manager
23 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Lead
17 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Service Engineer
14 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive Accountant
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Electrical Engineer
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Husk Power Systems with

Selco Solar Light

4.5
Compare

Mera Gao Power

3.9
Compare

Simpa Energy

4.4
Compare

ONergy

4.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview