i
Horizon Electric Corporation
Filter interviews by
I applied via Job Portal and was interviewed in Jan 2024. There was 1 interview round.
V-Guard products are known for their high quality, durability, and innovative features.
High quality: V-Guard products are manufactured using top-notch materials and undergo rigorous quality control processes.
Durability: V-Guard products are designed to withstand tough conditions and have a long lifespan.
Innovative features: V-Guard products often incorporate advanced technologies and unique features to enhance user exp...
Wire sizes vary depending on their gauge or diameter.
Wire sizes are measured using gauge numbers, with smaller numbers indicating thicker wires.
Common wire sizes include 10 gauge, 12 gauge, 14 gauge, and 16 gauge.
Thicker wires are typically used for higher current applications, while thinner wires are used for lower current applications.
Wire sizes can also be specified in terms of their diameter in millimeters or inche
Top trending discussions
posted on 15 Jul 2024
Execution in structure refers to the ability to effectively implement plans and strategies within an organized framework.
Understanding the overall goals and objectives of the organization
Developing detailed action plans to achieve those goals
Assigning tasks and responsibilities to team members
Monitoring progress and making adjustments as needed
Ensuring that resources are allocated efficiently
Communicating effectively w...
posted on 15 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There were 3 interview rounds.
Strings and array concepts
posted on 2 Aug 2024
Concurrency problem occurs when multiple threads access shared resources simultaneously, leading to unexpected behavior.
Use synchronization mechanisms like locks, semaphores, or monitors to control access to shared resources.
Avoid race conditions by ensuring that critical sections of code are executed atomically.
Consider using thread-safe data structures or immutable objects to minimize the risk of concurrency issues.
posted on 19 Jun 2022
I applied via Walk-in and was interviewed before Jun 2021. There were 3 interview rounds.
Data structure is a way of organizing and storing data in a computer so that it can be accessed and used efficiently.
Data structures are used to manage large amounts of data efficiently.
They provide a way to organize data in a way that makes it easy to access and manipulate.
Examples of data structures include arrays, linked lists, stacks, queues, trees, and graphs.
Explain logic of stack
I applied via LinkedIn and was interviewed in May 2024. There was 1 interview round.
Experienced business analyst with a background in data analysis and process improvement.
Over 5 years of experience in analyzing business processes and identifying areas for improvement
Skilled in data analysis tools such as Excel, SQL, and Tableau
Strong communication and problem-solving skills
Led a project to streamline inventory management processes, resulting in a 20% reduction in costs
I was interviewed before Feb 2024.
The seven quality control tools are essential for process improvement and problem-solving in engineering.
Check sheet: Used to collect and analyze data in a systematic way, such as tracking defects in a manufacturing process.
Pareto chart: Helps identify the most significant factors contributing to a problem by displaying them in descending order of frequency or impact.
Cause-and-effect diagram (Fishbone diagram): Visuali...
Autonomous maintenance is a key pillar of Total Productive Maintenance (TPM) and involves seven steps to empower operators to take care of their equipment.
Step 1: Initial Cleaning - Operators clean the equipment and surrounding area to identify abnormalities.
Step 2: Eliminate Sources of Contamination - Remove dirt, dust, and debris that can lead to breakdowns.
Step 3: General Inspection - Operators visually inspect the ...
OEE calculations involve Availability, Performance, and Quality factors to measure equipment efficiency.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Possible Production.
Calculate Quality by dividing Good Units Produced by Total Units Started.
Implementing lean practices is mandatory for organizations to improve efficiency, reduce waste, and increase productivity.
Lean practices help organizations identify and eliminate waste in processes, leading to cost savings and improved efficiency.
By implementing lean practices, organizations can improve quality control and reduce defects in products or services.
Lean practices promote continuous improvement and empower ...
Downstream team members can be motivated through recognition, clear communication, opportunities for growth, and fostering a positive work environment.
Provide recognition for their hard work and achievements
Communicate clearly about goals, expectations, and feedback
Offer opportunities for growth and development, such as training or mentorship programs
Create a positive work environment through team-building activities a
Pareto analysis is a technique used to identify the most important factors contributing to a problem or situation.
Pareto analysis is based on the Pareto Principle, also known as the 80/20 rule, which states that roughly 80% of effects come from 20% of causes.
It involves identifying and prioritizing the factors that have the most significant impact on a particular outcome.
By focusing on addressing the most critical fact...
A Gemba walk is a Lean management technique where managers go to the actual workplace to observe operations and engage with employees.
Gemba walks involve observing processes, asking questions, and identifying opportunities for improvement.
Managers should focus on understanding the work being done and the challenges faced by employees.
Gemba walks help in building relationships with employees and fostering a culture of c...
Steps involved in performing safety risk assessments
Identify hazards and potential risks
Assess the likelihood and severity of each risk
Implement control measures to mitigate risks
Monitor and review the effectiveness of control measures
Document findings and recommendations
Communicate risks to relevant stakeholders
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.
It involves autonomous maintenance, planned maintenance, and focused improvement activities.
TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and ...
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Electrical Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Electrical Engineer
3
salaries
| ₹0 L/yr - ₹0 L/yr |
GAMMON INDIA
Patil Group
Millennium Engineers & Contractors
Karam Industries