Filter interviews by
I applied via Naukri.com and was interviewed before May 2021. There was 1 interview round.
CNC stands for Computer Numerical Control. It is a manufacturing process that uses computerized systems to control machine tools.
CNC is a manufacturing process that automates the operation of machine tools.
It uses computerized systems to control the movement and operation of the tools.
CNC machines are programmed with specific instructions to perform precise cutting, drilling, or shaping operations.
The instructions are ...
I use various types of gauges depending on the specific engineering task at hand.
I use pressure gauges to measure fluid pressure in hydraulic systems.
I use temperature gauges to monitor the temperature of machinery and equipment.
I use strain gauges to measure the deformation or strain of materials under load.
I use flow meters to measure the flow rate of liquids or gases in pipelines.
I use level gauges to determine the ...
The number of tools used in CNC machining varies depending on the complexity of the project and the machine capabilities.
The number of tools used in CNC machining can range from a few to hundreds, depending on the requirements of the project.
Different tools are used for different operations such as drilling, milling, turning, and cutting.
The selection of tools depends on factors like material type, desired finish, tole...
I applied via Recruitment Consulltant and was interviewed before Mar 2021. There were 2 interview rounds.
Panel of 3 members asking situation based questions
I appeared for an interview in Sep 2021.
I applied via Naukri.com and was interviewed in Jun 2023. There were 2 interview rounds.
Net working capital is the difference between a company's current assets and current liabilities.
Net working capital measures a company's liquidity and ability to meet short-term obligations.
It is calculated by subtracting current liabilities from current assets.
A positive net working capital indicates that a company has enough current assets to cover its current liabilities.
A negative net working capital suggests that...
To tackle 3000 customers, I would implement efficient customer service strategies and utilize technology to streamline processes.
Implement a customer service team with well-defined roles and responsibilities
Utilize technology such as customer relationship management (CRM) software to manage customer interactions and data
Implement self-service options like online ordering or automated phone systems to handle routine inq...
I applied via Naukri.com and was interviewed before Apr 2023. There were 2 interview rounds.
Just basics maths
posted on 1 Mar 2025
About sales and personal info
posted on 6 Jun 2022
I applied via Naukri.com and was interviewed in Dec 2021. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 4 interview rounds.
Aptitude questions were asked by the team member
Coding round where I was asked to code
I applied via Naukri.com
Prepare for topics on current events, government regulations, corporate trends
Prepare for Management case study on complex problems, strategic issues
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
Motor and panel switchgear erection in oil and gas field
Experience in installation and maintenance of motor and panel switchgear in oil and gas field
Knowledge of safety regulations and procedures in hazardous environments
Ability to read and interpret technical drawings and schematics
Familiarity with testing and commissioning procedures
Experience in troubleshooting and resolving electrical issues
Examples: installation o...
Date of completion refers to the deadline or expected date of finishing a project or task.
It is important to set a realistic date of completion to ensure timely delivery of projects.
Factors such as available resources, team capacity, and project complexity should be considered when setting the date of completion.
Regular monitoring and tracking of progress can help ensure that the project is on track to meet the date of...
Senior Consultant
75
salaries
| ₹12 L/yr - ₹35 L/yr |
Assistant Manager
73
salaries
| ₹6 L/yr - ₹26 L/yr |
Project Engineer
65
salaries
| ₹7.5 L/yr - ₹16 L/yr |
AC Technician
54
salaries
| ₹1.4 L/yr - ₹7 L/yr |
Software Engineer
49
salaries
| ₹2 L/yr - ₹10.4 L/yr |
John Deere
ABB
Tractors and Farm Equipment
KONE