Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Hitachi Energy Team. If you also belong to the team, you can get access from here

Hitachi Energy Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Hitachi Energy Maintenance Team Lead Interview Questions and Answers

Updated 8 Apr 2024

Hitachi Energy Maintenance Team Lead Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. PLC, Plant Maintenance, Budget Planning, MTTR, MTBF,
Round 3 - Technical 

(1 Question)

  • Q1. SLD Diagram of Power starion . PLC programming, MTTR, MTBF, Equipment Availability
  • Ans. 

    SLD diagram is a graphical representation of a power station's electrical system. PLC programming is used for automation. MTTR, MTBF, and equipment availability are key metrics for maintenance.

    • SLD diagram provides a visual representation of the power station's electrical system, including transformers, generators, switchgear, and distribution lines.

    • PLC programming is used to automate processes in the power station, suc...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
-

I applied via Company Website and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - HR 

(6 Questions)

  • Q1. Barring checking and replacement work and safety first and paper work and walked away clean and fresh and try out and blumber block top cover open and old barring slue remove and new barring slue replace a...
  • Q2. V-scraper replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old v-scraper remove and new v-scraper replace and bolt nut tightening sure and ...
  • Q3. Motor replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old motor remove and new motor replace and bolt nut tightening sure and dayal guage ...
  • Q4. Discharge chute replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old discharge chute remove and new discharge chute replace and bolt nut ti...
  • Q5. Gear box replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old gear box remove and new gear box replace and bolt nut tightening sure and day...
  • Q6. Conveyor pully greasing and saving work and safety first and paper work and walked away clean and fresh and grease gunand all pully checking and saving greasing work and paper work cancelled

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the growth of opportunity and advancement
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Newspaper Ad

Round 1 - Technical 

(2 Questions)

  • Q1. Why we can't more efficiency in Boiler
  • Ans. 

    Efficiency in boilers is limited due to various factors.

    • Incomplete combustion of fuel leads to energy loss

    • Heat loss through flue gases and radiation

    • Inefficient heat transfer due to scaling or fouling

    • Improper insulation leading to heat loss

    • Inadequate maintenance and tuning

    • Lack of advanced control systems

    • Design limitations and constraints

    • Fuel quality and composition

    • Operating conditions and load variations

  • Answered by AI
  • Q2. Why Turbine,s efficiency is less & so derive the efficiency equation
  • Ans. 

    The efficiency of a turbine is less due to various factors such as friction, heat losses, and mechanical losses.

    • Friction between the moving parts of the turbine reduces its efficiency.

    • Heat losses occur due to the conversion of thermal energy into mechanical energy.

    • Mechanical losses include losses in bearings, seals, and other components.

    • Efficiency equation: Efficiency = (Useful output energy / Input energy) * 100%

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through text book of steam turbines properly & come with positive also go through Boiler books & different types of Boilers & its Design.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the process de-ashing the from esp to silo.
  • Ans. 

    De-ashing process from ESP to silo involves several steps.

    • The ash is collected in hoppers located at the bottom of the ESP.

    • The ash is then transported to the silo using a pneumatic conveying system.

    • The ash is stored in the silo until it can be disposed of properly.

    • Regular maintenance of the ESP and pneumatic conveying system is necessary to ensure efficient de-ashing.

    • Proper safety measures must be taken during the de-a

  • Answered by AI
  • Q2. What is the capacity of esp hoppers.
  • Ans. 

    The capacity of ESP hoppers varies depending on the size and model of the equipment.

    • ESP hoppers can range from a few hundred cubic feet to several thousand cubic feet in capacity.

    • The capacity can also depend on the type of material being collected in the hopper.

    • It is important to regularly monitor and maintain the hopper to prevent overfilling and potential equipment damage.

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. I will pay you only this.

Interview Preparation Tips

Interview preparation tips for other job seekers - Worst things going inside the company they just making everyone life & growth in danger.

I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Hydraulic. Pneumatic
  • Q2. Pump. gearbox . Bearings

Interview Preparation Tips

Topics to prepare for Vestas Maintenance Technician interview:
  • Gearbox
Interview preparation tips for other job seekers - Skill and behaviour good performance and reliability

I was interviewed before Aug 2016.

Interview Preparation Tips

Round: Test
Total Questions: 60

Skills: Technical Questions
Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Coding Test 

Any questions ask my job related

Round 3 - Technical 

(1 Question)

  • Q1. My job related ask any questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jun 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is motor and MCB.
  • Ans. 

    A motor is a device that converts electrical energy into mechanical energy, while MCB stands for Miniature Circuit Breaker used for electrical protection.

    • Motor is a machine that converts electrical energy into mechanical energy

    • MCB is a Miniature Circuit Breaker used for electrical protection

    • Motors are commonly used in various applications such as fans, pumps, and conveyor belts

    • MCBs are designed to automatically switch ...

  • Answered by AI
  • Q2. Define the types of motor divice.
  • Ans. 

    Types of motor devices include AC motors, DC motors, stepper motors, and servo motors.

    • AC motors: commonly used in household appliances and industrial applications

    • DC motors: used in battery-operated devices and automotive applications

    • Stepper motors: used in precision positioning applications

    • Servo motors: used in robotics and automation for precise control

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 1 .Law of thermodynamics, about centrifugal, reciprocating pump,types of boiler
  • Q2. Types of Gear, types of valve
  • Ans. 

    There are various types of gears and valves used in maintenance.

    • Types of gears include spur, helical, bevel, worm, and planetary gears.

    • Types of valves include gate, globe, ball, butterfly, and check valves.

    • Each type of gear and valve has its own unique characteristics and applications.

    • Proper maintenance and lubrication is essential for the longevity and efficiency of gears and valves.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - In power plant more scope for specially mechanical, electrical

Interview Questionnaire 

1 Question

  • Q1. 1.what have you perform any difficult maintenance Activities. 2.If DE System will Jam How will find out Phisically. 3.If beg on De system torn I would we find out.
  • Ans. 

    Answering questions related to difficult maintenance activities and troubleshooting DE system issues.

    • Performed difficult maintenance activities such as replacing a faulty gearbox in a wind turbine

    • To physically find out if DE system is jammed, I would inspect the system for any blockages or obstructions

    • If the bag on DE system is torn, I would conduct a visual inspection and check for any leaks or tears in the bag

  • Answered by AI

Hitachi Energy Interview FAQs

How many rounds are there in Hitachi Energy Maintenance Team Lead interview?
Hitachi Energy interview process usually has 3 rounds. The most common rounds in the Hitachi Energy interview process are Technical and Resume Shortlist.
What are the top questions asked in Hitachi Energy Maintenance Team Lead interview?

Some of the top questions asked at the Hitachi Energy Maintenance Team Lead interview -

  1. SLD Diagram of Power starion . PLC programming, MTTR, MTBF, Equipment Availabi...read more
  2. PLC, Plant Maintenance, Budget Planning, MTTR, MT...read more

Tell us how to improve this page.

Hitachi Energy Maintenance Team Lead Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.1
 • 250 Interviews
ABB Interview Questions
4.1
 • 232 Interviews
Adani Group Interview Questions
3.9
 • 186 Interviews
Tata Power Interview Questions
3.9
 • 161 Interviews
NTPC Interview Questions
4.2
 • 157 Interviews
Suzlon Group Interview Questions
4.1
 • 129 Interviews
Torrent Power Interview Questions
3.7
 • 126 Interviews
Eaton Interview Questions
3.9
 • 118 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
View all
Project Engineer
310 salaries
unlock blur

₹6.3 L/yr - ₹16 L/yr

Associate Project Engineer
259 salaries
unlock blur

₹3.2 L/yr - ₹10 L/yr

Design Engineer
128 salaries
unlock blur

₹3 L/yr - ₹13.5 L/yr

R&D Engineer
126 salaries
unlock blur

₹7.2 L/yr - ₹19.4 L/yr

Project Manager
122 salaries
unlock blur

₹7.9 L/yr - ₹30 L/yr

Explore more salaries
Compare Hitachi Energy with

Siemens Energy

4.1
Compare

ABB

4.1
Compare

Schneider Electric

4.1
Compare

BHEL

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview