i
Hitachi Energy
Filter interviews by
I applied via LinkedIn and was interviewed in Oct 2023. There were 3 interview rounds.
SLD diagram is a graphical representation of a power station's electrical system. PLC programming is used for automation. MTTR, MTBF, and equipment availability are key metrics for maintenance.
SLD diagram provides a visual representation of the power station's electrical system, including transformers, generators, switchgear, and distribution lines.
PLC programming is used to automate processes in the power station, suc...
Top trending discussions
posted on 19 Jul 2024
I applied via Company Website and was interviewed in Jun 2024. There were 2 interview rounds.
Gear box replacement work
I applied via Newspaper Ad
Efficiency in boilers is limited due to various factors.
Incomplete combustion of fuel leads to energy loss
Heat loss through flue gases and radiation
Inefficient heat transfer due to scaling or fouling
Improper insulation leading to heat loss
Inadequate maintenance and tuning
Lack of advanced control systems
Design limitations and constraints
Fuel quality and composition
Operating conditions and load variations
The efficiency of a turbine is less due to various factors such as friction, heat losses, and mechanical losses.
Friction between the moving parts of the turbine reduces its efficiency.
Heat losses occur due to the conversion of thermal energy into mechanical energy.
Mechanical losses include losses in bearings, seals, and other components.
Efficiency equation: Efficiency = (Useful output energy / Input energy) * 100%
posted on 27 Jun 2022
De-ashing process from ESP to silo involves several steps.
The ash is collected in hoppers located at the bottom of the ESP.
The ash is then transported to the silo using a pneumatic conveying system.
The ash is stored in the silo until it can be disposed of properly.
Regular maintenance of the ESP and pneumatic conveying system is necessary to ensure efficient de-ashing.
Proper safety measures must be taken during the de-a
The capacity of ESP hoppers varies depending on the size and model of the equipment.
ESP hoppers can range from a few hundred cubic feet to several thousand cubic feet in capacity.
The capacity can also depend on the type of material being collected in the hopper.
It is important to regularly monitor and maintain the hopper to prevent overfilling and potential equipment damage.
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
posted on 1 Aug 2017
I was interviewed before Aug 2016.
I applied via Company Website and was interviewed in Jul 2023. There were 3 interview rounds.
Any questions ask my job related
posted on 18 Jun 2023
I was interviewed before Jun 2022.
A motor is a device that converts electrical energy into mechanical energy, while MCB stands for Miniature Circuit Breaker used for electrical protection.
Motor is a machine that converts electrical energy into mechanical energy
MCB is a Miniature Circuit Breaker used for electrical protection
Motors are commonly used in various applications such as fans, pumps, and conveyor belts
MCBs are designed to automatically switch ...
Types of motor devices include AC motors, DC motors, stepper motors, and servo motors.
AC motors: commonly used in household appliances and industrial applications
DC motors: used in battery-operated devices and automotive applications
Stepper motors: used in precision positioning applications
Servo motors: used in robotics and automation for precise control
I applied via Company Website and was interviewed in Dec 2022. There were 2 interview rounds.
There are various types of gears and valves used in maintenance.
Types of gears include spur, helical, bevel, worm, and planetary gears.
Types of valves include gate, globe, ball, butterfly, and check valves.
Each type of gear and valve has its own unique characteristics and applications.
Proper maintenance and lubrication is essential for the longevity and efficiency of gears and valves.
posted on 17 Jan 2021
Answering questions related to difficult maintenance activities and troubleshooting DE system issues.
Performed difficult maintenance activities such as replacing a faulty gearbox in a wind turbine
To physically find out if DE system is jammed, I would inspect the system for any blockages or obstructions
If the bag on DE system is torn, I would conduct a visual inspection and check for any leaks or tears in the bag
based on 1 interview
Interview experience
Project Engineer
310
salaries
| ₹6.3 L/yr - ₹16 L/yr |
Associate Project Engineer
259
salaries
| ₹3.2 L/yr - ₹10 L/yr |
Design Engineer
128
salaries
| ₹3 L/yr - ₹13.5 L/yr |
R&D Engineer
126
salaries
| ₹7.2 L/yr - ₹19.4 L/yr |
Project Manager
122
salaries
| ₹7.9 L/yr - ₹30 L/yr |
Siemens Energy
ABB
Schneider Electric
BHEL