Upload Button Icon Add office photos

Filter interviews by

Hiranmaye Energy Executive Engineer Interview Questions and Answers

Updated 27 Sep 2023

Hiranmaye Energy Executive Engineer Interview Experiences

2 interviews found

Executive Engineer Interview Questions & Answers

user image Vivek Pathak

posted on 27 Sep 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Boiler operation questions
  • Q2. Coal mill line up
  • Q3. Turbine rolling
  • Q4. Boiler Emergency
  • Q5. Turbine emergency

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn basic of operation questions like boiler turbine

Interview Questionnaire 

1 Question

  • Q1. Question regarding Thermal Power Plant, Turnine, Motors. Etc etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - My advice to all, if you are willing to join in any Plant, make sure you have a knowledge of Motors, Turbine & Boilers.
Motors are the vital equipment in any plant. Major problem occurres for motors.

Executive Engineer Interview Questions Asked at Other Companies

asked in TCS
Q1. Question 1: What is memory leak? Question 2: What is static varia ... read more
Q2. What are the main Contamination in Safe drinkig Water.
Q3. What is material balance ? And wrote down the column material bal ... read more
Q4. What are the Various ways of distribution Transformer protection?
asked in TCS
Q5. Differences between C and Java? Explain me about exception handli ... read more

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Previous experience and education
  • Q2. Salary discussions
Round 2 - Technical 

(2 Questions)

  • Q1. Related to distribution
  • Q2. Metering knowledge
Round 3 - Behavioral 

(2 Questions)

  • Q1. General discussion and communication skills
  • Q2. Family background
Interview experience
4
Good
Difficulty level
-
Process Duration
6-8 weeks
Result
Selected Selected
Round 1 - Aptitude Test 

Gate exam, math, english, lQ test

Round 2 - HR 

(2 Questions)

  • Q1. Tell about the company.
  • Ans. 

    The company is a leading engineering firm specializing in infrastructure projects.

    • Established in 2005

    • Provides services in civil, structural, and mechanical engineering

    • Completed projects include bridges, highways, and water treatment plants

  • Answered by AI
  • Q2. Future growth of company
  • Ans. 

    The future growth of the company is dependent on various factors such as market trends, innovation, strategic planning, and customer satisfaction.

    • Market trends play a crucial role in determining the growth potential of the company. Keeping an eye on industry trends and adapting to changes can help in staying ahead of the competition.

    • Innovation is key to driving growth. Developing new products or services, improving exi...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What you know about Transmission and distribution
  • Ans. 

    Transmission and distribution refer to the processes of delivering electricity from power plants to consumers.

    • Transmission involves high voltage lines to carry electricity over long distances

    • Distribution involves lower voltage lines to deliver electricity to homes and businesses

    • Transformers are used to step up or step down voltage as needed

    • Substations are used to switch and control electricity flow

    • Smart grids use advan...

  • Answered by AI
  • Q2. What is isolation process
  • Ans. 

    Isolation process is a method used to separate or restrict the movement of individuals or objects to prevent the spread of infectious diseases or contaminants.

    • Isolation process involves physically separating individuals or objects from others to prevent the spread of infectious diseases.

    • It can also involve restricting the movement of individuals within a certain area to prevent contamination.

    • Examples include quarantine...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Torrent Power Executive Engineer interview:
  • SCADA
  • SAP
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. It is all about basics technical part and what post required.
  • Q2. What are the test of concrete and steel and procedure of cube test , which test perform if cube fail. Mainly sefaty releted questions.
  • Ans. 

    The tests for concrete and steel include cube test for concrete and tensile test for steel. If the cube test fails, additional tests like rebound hammer test or ultrasonic pulse velocity test can be performed.

    • Concrete test: Cube test is performed to determine the compressive strength of concrete. A cube specimen is prepared and subjected to compressive load.

    • Steel test: Tensile test is conducted to measure the strength ...

  • Answered by AI
Round 3 - Case Study 

In second round all questions ask about situation base and priority of safety at site.

Round 4 - HR 

(1 Question)

  • Q1. Basic HR questions asked.

Interview Preparation Tips

Interview preparation tips for other job seekers - Company first priority is sefaty any thing else is after the sefaty and second quality.
Interview experience
2
Poor
Difficulty level
Hard
Process Duration
2-4 weeks
Result
-

I applied via Campus Placement and was interviewed before Aug 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

100 marks test and no negative marking.

Round 2 - Technical 

(1 Question)

  • Q1. Basic technical questions asked
Round 3 - HR 

(1 Question)

  • Q1. What is your long term goal?
  • Ans. 

    My long term goal is to become a respected leader in the field of engineering, leading innovative projects and making a positive impact on society.

    • Continuously improve my technical skills and knowledge through advanced education and training

    • Take on increasing levels of responsibility and leadership roles within the engineering industry

    • Contribute to the development of groundbreaking technologies and solutions that addre...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you not have any other option then you apply here.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Institute of Management Nirma University, Ahmedabad and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

General aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Electrical related questions
  • Q2. Core electrical subject

I applied via Company Website and was interviewed in Dec 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What are the Various ways of distribution Transformer protection?
  • Ans. 

    Various ways of distribution transformer protection include overcurrent protection, differential protection, and earth fault protection.

    • Overcurrent protection involves the use of fuses or circuit breakers to protect the transformer from excessive current.

    • Differential protection compares the current entering and leaving the transformer to detect any internal faults.

    • Earth fault protection detects any fault between the tr...

  • Answered by AI
  • Q2. What is Buckley relay?
  • Ans. 

    Buckley relay is a protective relay used in power systems to detect faults and prevent damage to equipment.

    • It is a type of directional overcurrent relay.

    • It operates based on the principle of phase comparison.

    • It is used to protect generators, transformers, and transmission lines.

    • It is named after its inventor, W. H. Buckley.

    • It is commonly used in high voltage power systems.

  • Answered by AI
  • Q3. What is the size of dog conductor?
  • Ans. 

    The size of dog conductor depends on the current carrying capacity and the voltage rating of the electrical system.

    • The size of the dog conductor is determined by the electrical load it needs to carry.

    • The current carrying capacity of the conductor is directly proportional to its size.

    • The voltage rating of the electrical system also plays a role in determining the size of the conductor.

    • For example, a 20-ampere circuit re...

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. What are various Types of earthing?
  • Ans. 

    Earthing is the process of connecting the metallic parts of an electrical appliance to the earth plate.

    • Plate Earthing

    • Pipe Earthing

    • Rod Earthing

    • Strip Earthing

    • Earthing through Water Mains

    • Earthing through Earth Electrodes

    • Earthing through Foundation

    • Plate Earthing with Pipe

    • Chemical Earthing

  • Answered by AI
  • Q2. How do we do pipe earthing?
  • Ans. 

    Pipe earthing is done by connecting the pipe to a copper electrode buried in the ground.

    • Select a suitable location for the copper electrode

    • Dig a hole and insert the copper electrode into it

    • Connect the pipe to the copper electrode using a copper wire

    • Ensure that the connection is tight and secure

    • Cover the hole with soil and water it to ensure good contact between the electrode and the soil

  • Answered by AI
Round 4 - HR 

(1 Question)

  • Q1. Why do you want to this organisation?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be cool and focus on technical concepts. Be to the point.

I applied via Job Portal and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Why did you wish to join

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident........
Give proper answers.....
Dont hesitate.....

Hiranmaye Energy Interview FAQs

How many rounds are there in Hiranmaye Energy Executive Engineer interview?
Hiranmaye Energy interview process usually has 2 rounds. The most common rounds in the Hiranmaye Energy interview process are Technical and Resume Shortlist.
What are the top questions asked in Hiranmaye Energy Executive Engineer interview?

Some of the top questions asked at the Hiranmaye Energy Executive Engineer interview -

  1. Question regarding Thermal Power Plant, Turnine, Motors. Etc et...read more
  2. Boiler operation questi...read more
  3. Coal mill line...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Hiranmaye Energy interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 199 Interviews
Adani Group Interview Questions
3.9
 • 176 Interviews
NTPC Interview Questions
4.2
 • 157 Interviews
Tata Power Interview Questions
3.9
 • 156 Interviews
Suzlon Group Interview Questions
4.1
 • 123 Interviews
Torrent Power Interview Questions
3.8
 • 122 Interviews
Eaton Corporation Interview Questions
4.0
 • 114 Interviews
GE Vernova Interview Questions
4.1
 • 85 Interviews
ReNew Interview Questions
4.2
 • 81 Interviews
View all
Hiranmaye Energy Executive Engineer Salary
based on 6 salaries
₹3.2 L/yr - ₹4.4 L/yr
31% less than the average Executive Engineer Salary in India
View more details

Hiranmaye Energy Executive Engineer Reviews and Ratings

based on 3 reviews

4.0/5

Rating in categories

1.2

Skill development

4.9

Work-Life balance

4.9

Salary & Benefits

4.9

Job Security

3.0

Company culture

4.9

Promotions/Appraisal

4.9

Work Satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
27 salaries
unlock blur

₹3.8 L/yr - ₹9.2 L/yr

Manager
18 salaries
unlock blur

₹6.4 L/yr - ₹16 L/yr

Deputy Manager
14 salaries
unlock blur

₹7.2 L/yr - ₹15.5 L/yr

Fireman
8 salaries
unlock blur

₹1.5 L/yr - ₹2.2 L/yr

Executive Engineer
6 salaries
unlock blur

₹3.2 L/yr - ₹4.4 L/yr

Explore more salaries
Compare Hiranmaye Energy with

Adani Green Energy

4.1
Compare

Suzlon Group

4.1
Compare

Azure Power

3.9
Compare

ReNew

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview