i
Hindware Limited
Filter interviews by
I applied via Referral and was interviewed before Aug 2022. There were 4 interview rounds.
posted on 14 Jun 2024
I applied via LinkedIn and was interviewed before Jun 2023. There was 1 interview round.
Discuss the brainstorming on increasing WOD & Market mapping
I applied via Job Fair and was interviewed before Feb 2023. There was 1 interview round.
The company uses diesel generators for power generation.
The company relies on diesel generators to provide power.
The generators are powered by diesel fuel.
The power output of the generators varies depending on the specific model and capacity.
The generators are used to supply electricity to various equipment and machinery in the company.
Hindware Limited interview questions for popular designations
I applied via Referral and was interviewed before May 2022. There were 2 interview rounds.
Address the issue directly, communicate openly, build trust, and involve higher management if necessary.
Address the issue directly with the individuals involved to understand their concerns and find a resolution.
Communicate openly with the team to address any misunderstandings and build trust.
Involve higher management if necessary to mediate and resolve conflicts professionally.
Set clear expectations and consequences f...
Get interview-ready with Top Hindware Limited Interview Questions
I applied via Approached by Company and was interviewed in Nov 2021. There were 2 interview rounds.
Process troubleshooting is the process of identifying and resolving issues in a production process.
Identifying the root cause of the problem
Analyzing data to determine the extent of the issue
Developing and implementing solutions to fix the problem
Monitoring the process to ensure the issue does not reoccur
Documenting the troubleshooting process for future reference
Manpower management involves organizing and coordinating employees to achieve production goals. R/M re-process refers to the process of repairing or remanufacturing faulty or damaged products. Technical reporting involves documenting and communicating technical information.
Manpower management involves scheduling, training, and supervising employees
R/M re-process involves identifying and repairing faulty products to red...
What are the parts of an injection moulding machine?
Injection unit
Clamping unit
Mold or tool
Heating and cooling system
Ejector system
Hydraulic system
Control system
I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.
I am a dedicated and detail-oriented Production Engineer with a strong background in manufacturing processes and problem-solving.
Experienced in optimizing production processes to improve efficiency and reduce costs
Proficient in using CAD software to design and modify production equipment
Skilled in troubleshooting and resolving technical issues on the production floor
Strong knowledge of lean manufacturing principles and...
A Production Engineer is responsible for overseeing the manufacturing process and ensuring efficient production.
Oversee the manufacturing process
Ensure efficient production
Identify and resolve production issues
Implement process improvements
Collaborate with cross-functional teams
Monitor production metrics and analyze data
Ensure compliance with safety and quality standards
Lean manufacturing is a systematic approach to minimize waste and maximize value in production processes.
Focuses on continuous improvement
Eliminates non-value adding activities
Involves all employees in the process
Reduces lead time and inventory
Examples: Toyota Production System, Kaizen, 5S
6 Sigma is a data-driven methodology used to improve quality and reduce defects in a process.
It focuses on identifying and removing the causes of defects and minimizing variability in a process.
It uses statistical analysis to measure and improve the performance of a process.
It aims to achieve a level of quality where the probability of a defect occurring is less than 3.4 per million opportunities.
It has been widely ado...
Our current company OEE is 85%.
OEE stands for Overall Equipment Efficiency.
It is a measure of how effectively a manufacturing operation is utilized.
It takes into account the availability, performance, and quality of the equipment.
OEE is calculated by multiplying the availability, performance, and quality factors.
A higher OEE indicates better productivity and efficiency.
For example, if the availability is 90%, performan...
Implemented cost savings measures through process optimization and waste reduction.
Conducted time and motion studies to identify areas for improvement
Implemented lean manufacturing principles to reduce waste and increase efficiency
Introduced new technologies to automate processes and reduce labor costs
Negotiated better pricing with suppliers to reduce material costs
Trained employees on cost-saving measures and encourag
I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.
General questions related to Ceramic Engineering especially in the Whiteware domain
I applied via Walk-in and was interviewed in Jul 2021. There were 6 interview rounds.
The laws of thermodynamics are fundamental principles that govern the behavior of energy in physical systems.
The first law states that energy cannot be created or destroyed, only transferred or converted.
The second law states that the total entropy of a closed system will always increase over time.
The third law states that it is impossible to reach absolute zero temperature.
These laws have important applications in fie...
The formula for vernier caliper least count is the difference between the main scale division and the vernier scale division.
The formula is: Least Count = Main Scale Division / (Total Number of Divisions on Vernier Scale - 1)
The main scale division is the distance between two consecutive main scale graduations.
The vernier scale division is the distance between two consecutive vernier scale graduations.
The least count i...
The area of a rectangle is calculated by multiplying its length and width.
To find the area of a rectangle, multiply its length and width.
The formula for the area of a rectangle is A = l x w.
The units of the area will be the square of the units of the length and width.
For example, if the length is 5 units and the width is 3 units, the area would be 15 square units.
1 inch is equal to 25.4 mm.
1 inch is a unit of length commonly used in the imperial system.
mm stands for millimeter, which is a unit of length in the metric system.
To convert inches to millimeters, you multiply the inch value by 25.4.
For example, 2 inches is equal to 50.8 mm (2 * 25.4).
Quality control refers to the process of ensuring that products or services meet the desired level of quality.
It involves setting quality standards and ensuring that they are met
It includes monitoring and inspecting products or services to identify defects or issues
It also involves taking corrective action to address any problems that are identified
Examples include conducting product testing, performing audits, and imp
I applied via Referral and was interviewed before Oct 2022. There was 1 interview round.
The duration of Hindware Limited interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 69 interviews
Interview experience
based on 1.1k reviews
Rating in categories
Hyderabad / Secunderabad
12-18 Yrs
Not Disclosed
Area Sales Manager
212
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
199
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Area Sales Manager
164
salaries
| ₹0 L/yr - ₹0 L/yr |
Territory Manager
157
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
101
salaries
| ₹0 L/yr - ₹0 L/yr |
Jaquar
Cera Sanitaryware
Parryware
Kohler