I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.
Top trending discussions
Aptitude test maths resiong general awareness
I applied via Naukri.com and was interviewed in Dec 2022. There were 2 interview rounds.
To increase OEE, focus on reducing downtime, improving quality, and increasing speed.
Identify and address the root causes of downtime
Implement preventive maintenance programs
Train employees to operate equipment efficiently
Improve quality control processes
Optimize production scheduling
Invest in new technology or equipment
Streamline processes to reduce waste and increase speed
SMED stands for Single Minute Exchange of Die, a lean manufacturing technique to reduce setup time.
SMED aims to reduce the time it takes to switch a production line from making one product to another
It involves breaking down the setup process into small steps and finding ways to streamline each step
The goal is to reduce setup time to less than 10 minutes, hence the name Single Minute Exchange of Die
Examples of SMED in ...
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
I applied via Walk-in and was interviewed in Mar 2024. There were 5 interview rounds.
The first round interview is typically viewed as an introductory conversation to determine that you have the basic skills and qualifications for the role and can fit in with the team and company culture
posted on 12 Jan 2023
I applied via Naukri.com and was interviewed in Jul 2022. There were 4 interview rounds.
I applied via Job Fair and was interviewed in May 2022. There were 3 interview rounds.
posted on 5 Mar 2024
I applied via Walk-in and was interviewed before Mar 2023. There were 2 interview rounds.
Preform yield is the percentage of usable preforms produced in a manufacturing process.
Preform yield is calculated by dividing the number of usable preforms by the total number of preforms produced and multiplying by 100.
It is an important metric in manufacturing to assess the efficiency of the production process.
For example, if 900 usable preforms are produced out of 1000 total preforms, the preform yield would be 90%
Operating a blowing machine involves setting up the machine, loading materials, adjusting settings, and monitoring the process.
Ensure the blowing machine is properly set up and connected to power source.
Load the materials into the machine according to the manufacturer's instructions.
Adjust the settings such as temperature, pressure, and speed based on the desired output.
Start the machine and monitor the process to ensu...
Gravity filling is a process of filling containers by allowing gravity to push the liquid into the container.
Liquid is poured into a container from a higher point, allowing gravity to fill the container.
The height difference between the liquid source and the container determines the speed of filling.
Commonly used in industries like food and beverage for filling bottles and containers.
Gravity filling is a simple and cos...
I applied via Naukri.com and was interviewed in Jul 2022. There were 2 interview rounds.
Its a normal written test
based on 3 interviews
Interview experience
based on 27 reviews
Rating in categories
Sales Team Leader
491
salaries
| ₹5 L/yr - ₹14.8 L/yr |
Sales Executive
349
salaries
| ₹1 L/yr - ₹9 L/yr |
Team Lead
307
salaries
| ₹5.9 L/yr - ₹15.9 L/yr |
Market Growth Representative
221
salaries
| ₹1.2 L/yr - ₹5.5 L/yr |
Executive Production
213
salaries
| ₹2.4 L/yr - ₹8 L/yr |
PepsiCo
Parle Agro
Dabur
Britannia