Upload Button Icon Add office photos

Filter interviews by

HIDADA Site Supervisor Interview Questions and Answers

Updated 22 Oct 2022

HIDADA Site Supervisor Interview Experiences

1 interview found

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Depending upon job and responsibilities Tecnical knowledge on particular job etc
  • Q2. If you got the opportunity then how you perform and manage your job Then how to handle your workforce in difficult situation and how you handle in job pressure from client and management. Your view about ...
  • Q3. How much you expecting your remuneration?
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical and personality

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company to work for beginners
Management is good

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is bar bending schedule
  • Ans. 

    Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.

    • It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.

    • Helps in estimating the quantity of steel required for construction.

    • Ensures proper placement and bending of reinforcement bars as per design specifications.

    • Used by contractors, engineers, and construction workers for re...

  • Answered by AI
  • Q2. 28 days concrete strength
  • Ans. 

    28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.

    • 28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing

    • It is important for assessing the quality of concrete and its ability to support structural loads

    • The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing

  • Answered by AI
  • Q3. Difference between mivan and conventional
  • Ans. 

    Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.

    • Mivan is faster and more efficient than conventional construction methods.

    • Mivan requires skilled labor for installation of aluminum formwork.

    • Conventional construction is more labor-intensive and time-consuming.

    • Mivan provides better quality finishes compared to conventional...

  • Answered by AI
  • Q4. What is self leveling concrete
  • Ans. 

    Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.

    • Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.

    • It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.

    • Self leveling concrete can be applied in thicknesses ranging from a featheredg...

  • Answered by AI
  • Q5. How many days will take 1st Aluform mockup Concreting
  • Ans. 

    The 1st Aluform mockup concreting typically takes 1-2 days to complete.

    • 1-2 days is the usual timeframe for 1st Aluform mockup concreting

    • Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration

    • Proper planning and coordination can help expedite the process

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shimizu Senior Site Engineer interview:
  • Construction
  • Structural
  • Quality Control
  • Quality Assurance
  • Bar Bending Schedule
  • Project Execution
Interview preparation tips for other job seekers - Be active and action to learn every step and work hard and smart . Please ensure technical criticis and how it resolve it
Interview experience
3
Average
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. How mane year experience
  • Q2. I'm interested sir
  • Q3. Total 18 year experience in power plant & oil and gas plant
  • Ans. 

    I have a total of 18 years of experience in power plant and oil and gas plant.

    • Experience includes working on various projects in power plant and oil and gas plant

    • Knowledge of electrical systems, equipment, and regulations in these industries

    • Hands-on experience in maintenance, troubleshooting, and project management

    • Strong understanding of safety protocols and procedures in high-risk environments

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me M25 ratio
  • Ans. 

    M25 ratio refers to the mix ratio of concrete, commonly used in construction projects.

    • M25 ratio is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.

    • This mix is commonly used for structural concrete works like columns, beams, and slabs.

    • The strength of concrete with M25 ratio is typically around 25 megapascals after 28 days of curing.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Newspaper Ad and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. About Carriageways, Service Roads and patchwork i.e pot Holes, slippage cracks i.e alligator crack, horizontal or vertical crack, Undulating surface,rain cut, Metals beam crash barrier,Gaurd Rail or Mild s...
Round 2 - Technical 

(3 Questions)

  • Q1. Checking level of the layer
  • Q2. Testing the field dry density of the bed like Sub Grade ,GSB,WMM, DBM or BC
  • Q3. Checking the road width

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir I m very hardworker employee .
I m very panchtual for my job duty and going to site daily and prepare daily progress report and also prepare monthly progress report.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Find your information
  • Q2. Site Work related questions
Round 3 - Others 

(1 Question)

  • Q1. Project Related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Fyi
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed before Nov 2022. There were 2 interview rounds.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Company management
  • Q2. Machine fitness
  • Q3. Eco friendly management
  • Q4. Road management
  • Q5. Electricals system
Round 2 - Group Discussion 

I love construction line but one thing please provide some extra pay

Interview Preparation Tips

Interview preparation tips for other job seekers - According to my suggestion I love construction line ❤️
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How many years experience do you have in this field? 15 Years
  • Q2. What are the problems have you faced and the solution find out?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confidence on the presentation/answer against the question relating to the job has been handled/ wotked on the site

HIDADA Interview FAQs

How many rounds are there in HIDADA Site Supervisor interview?
HIDADA interview process usually has 3 rounds. The most common rounds in the HIDADA interview process are Resume Shortlist, Technical and One-on-one Round.
What are the top questions asked in HIDADA Site Supervisor interview?

Some of the top questions asked at the HIDADA Site Supervisor interview -

  1. Depending upon job and responsibilities Tecnical knowledge on particular job e...read more
  2. Technical and personal...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Motors Interview Questions
4.2
 • 991 Interviews
Tata Steel Interview Questions
4.1
 • 827 Interviews
Maruti Suzuki Interview Questions
4.2
 • 591 Interviews
JSW Steel Interview Questions
3.9
 • 568 Interviews
Ashok Leyland Interview Questions
4.1
 • 235 Interviews
Bharat Forge Interview Questions
3.8
 • 55 Interviews
Vedanta Limited Interview Questions
3.8
 • 44 Interviews
View all

HIDADA Site Supervisor Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

2.0

Skill development

2.0

Work-life balance

3.0

Salary

4.0

Job security

2.0

Company culture

3.0

Promotions

1.0

Work satisfaction

Explore 1 Review and Rating
Tekla Modeller
10 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Design Engineer
6 salaries
unlock blur

₹4.1 L/yr - ₹10.6 L/yr

Detailing Engineer
6 salaries
unlock blur

₹3.6 L/yr - ₹7.2 L/yr

Structural Detailer
4 salaries
unlock blur

₹2.4 L/yr - ₹5 L/yr

Detailer
4 salaries
unlock blur

₹3.1 L/yr - ₹7.5 L/yr

Explore more salaries
Compare HIDADA with

Tata Steel

4.1
Compare

JSW Steel

3.9
Compare

Steel Authority Of India

4.1
Compare

Vedanta Limited

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview