Filter interviews by
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
Top trending discussions
posted on 5 Jun 2024
Optimistic costing involves estimating project costs on the lower end of the spectrum.
Identify all potential cost-saving measures and efficiencies in the project plan.
Use historical data and benchmarks to estimate costs on the lower side.
Consider best-case scenarios and optimistic assumptions when estimating costs.
Collaborate with stakeholders to gather insights and input on cost-saving opportunities.
Regularly review a...
posted on 13 Sep 2022
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
Accountant
5
salaries
| ₹2.2 L/yr - ₹3.8 L/yr |
Mechanical Engineer
5
salaries
| ₹3 L/yr - ₹4.6 L/yr |
Civil Site Engineer
4
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Account Assistant
4
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Site Accountant
4
salaries
| ₹3.5 L/yr - ₹4.5 L/yr |
Lea Associates South Asia
ABCI Infrastructures
R.V.R. PROJECTS
VIKRAN Engineering & Exim