Filter interviews by
Man power material productions
Marital manpower services and production
I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed in Oct 2019. There was 1 interview round.
Types of maintenance include preventive, corrective, predictive, and proactive maintenance.
Preventive maintenance involves scheduled inspections and maintenance to prevent equipment failure.
Corrective maintenance is performed after a failure occurs to restore equipment to its normal operating condition.
Predictive maintenance uses data analysis and monitoring to predict when maintenance should be performed.
Proactive mai...
There are several types of control limit charts used in quality control.
Control limit charts are used to monitor and control processes in quality control.
Some common types of control limit charts include: X-bar and R chart, X-bar and S chart, Individual and Moving Range (I-MR) chart, and p-chart.
The X-bar and R chart is used to monitor the process mean and range.
The X-bar and S chart is used to monitor the process mean...
The number of engines to run in the process depends on the specific requirements and capacity of the system.
The number of engines may vary based on factors such as production volume, efficiency, and quality standards.
It is important to consider the workload and capacity of each engine to ensure optimal performance.
Regular monitoring and evaluation of the process can help determine if the current number of engines is su...
Speed measurement meters are devices used to measure the speed of an object or vehicle.
Speed radar guns are commonly used by law enforcement to measure the speed of vehicles.
Laser speed guns use laser technology to measure the speed of an object.
Doppler radar systems are used to measure the speed of moving objects by analyzing the change in frequency of the reflected waves.
GPS devices can also be used to measure the sp...
Transducers are devices that convert one form of energy into another.
Transducers are used in various industries such as automotive, aerospace, and healthcare.
They can be used to measure physical quantities such as temperature, pressure, and flow.
Transducers can also be used in medical imaging devices like ultrasound machines.
Examples of transducers include thermocouples, pressure sensors, and microphones.
I applied via Company Website and was interviewed in Oct 2019. There was 1 interview round.
Vernier calipers are used for precise measurements in engineering and manufacturing.
Vernier calipers have a main scale and a sliding vernier scale for accurate readings.
Measurements are taken by aligning the jaws with the object being measured and reading the scale where it lines up.
Vernier calipers can measure internal, external, and depth dimensions.
They are commonly used in industries like automotive, aerospace, and...
There are various types of pressure, including atmospheric pressure, gauge pressure, absolute pressure, and differential pressure.
Atmospheric pressure is the pressure exerted by the weight of the atmosphere on a given area.
Gauge pressure is the pressure measured relative to atmospheric pressure.
Absolute pressure is the total pressure exerted by a fluid, including atmospheric pressure.
Differential pressure is the differ...
Harita Fehrer interview questions for popular designations
Top trending discussions
I applied via Campus Placement and was interviewed in Nov 2020. There was 1 interview round.
A die is a tool used to shape or cut materials. There are various types of dies used in different industries.
Dies are used in manufacturing to cut, shape, or form materials such as metal, plastic, and paper.
Some common types of dies include cutting dies, forming dies, and drawing dies.
Cutting dies are used to cut materials into specific shapes, while forming dies are used to bend or shape materials.
Drawing dies are use...
Tool room is a specialized area in a company where tools and equipment are designed, manufactured, and maintained.
Tool room is responsible for designing and manufacturing tools and equipment required for production.
It also maintains and repairs the tools and equipment to ensure their longevity and efficiency.
Tool room is equipped with specialized machinery and skilled personnel to carry out the tasks efficiently.
It pla...
Designing of a component before manufacturing helps in identifying and resolving potential issues, reducing costs and improving efficiency.
Designing helps in identifying potential issues and resolving them before manufacturing.
It helps in reducing costs by identifying and rectifying errors early on.
Designing also helps in improving efficiency by optimizing the component's design.
It ensures that the final product meets ...
My dream is to create innovative software solutions that positively impact people's lives.
Developing cutting-edge technology
Solving complex problems
Improving user experience
Collaborating with talented individuals
Making a difference in society
I am excited to join this organization because of its reputation for innovation and commitment to employee growth.
I am impressed by the company's track record of developing cutting-edge software solutions.
I am excited about the opportunity to work with a team of talented and motivated engineers.
I appreciate the company's focus on employee development and growth.
I am drawn to the company's culture of innovation and coll...
I am willing to work full-time with this organization and put in extra hours if required.
I am committed to delivering quality work within deadlines
I am open to working overtime and on weekends if necessary
I am willing to take on additional responsibilities if needed
To attach one variable from one file to another, we can use import or require statements in programming languages.
In JavaScript, we can use the 'require' statement to import a variable from another file.
In Python, we can use the 'import' statement to import a variable from another file.
We can also use the 'export' statement in the source file to export the variable and then import it in the destination file.
The syntax ...
I applied via LinkedIn and was interviewed in Aug 2023. There were 3 interview rounds.
posted on 2 Apr 2024
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There were 3 interview rounds.
Startup code sequence refers to the order in which code is executed when a program is launched.
Startup code sequence typically involves initializing variables, setting up memory, and executing any necessary setup functions.
Examples of startup code sequence include setting up hardware registers in embedded systems, initializing global variables in C programs, and loading configuration files in web applications.
Yes, I am willing to work on weekends if necessary to meet project deadlines or address urgent issues.
I understand that sometimes working on weekends may be required in order to meet project deadlines or address urgent issues.
I am committed to delivering high-quality work and am willing to put in extra hours when needed.
I am flexible with my schedule and can adjust my plans to accommodate weekend work if necessary.
I will address conflicts by promoting open communication, active listening, and facilitating constructive discussions.
Encourage open communication among team members to address conflicts early on
Practice active listening to understand all perspectives involved
Facilitate constructive discussions to find mutually beneficial solutions
Establish clear team norms and guidelines for conflict resolution
Seek input from team mem...
Seeking new challenges and opportunities for growth in a more innovative and dynamic environment.
Looking for new challenges and opportunities for growth
Interested in working in a more innovative and dynamic environment
Seeking career advancement and professional development
Seeking new challenges and opportunities for growth in a different environment.
Looking for new challenges and opportunities for growth
Interested in working with different technologies or industries
Seeking a better work-life balance or company culture
Wanting to expand skill set or take on more responsibilities
Relocation to a new area
based on 2 interviews
Interview experience
based on 110 reviews
Rating in categories
Senior Engineer
31
salaries
| ₹4.7 L/yr - ₹9.1 L/yr |
Assistant Manager
23
salaries
| ₹7.5 L/yr - ₹13.6 L/yr |
Engineer
15
salaries
| ₹3.2 L/yr - ₹6.5 L/yr |
Production Engineer
13
salaries
| ₹2 L/yr - ₹5.2 L/yr |
Junior Engineer
9
salaries
| ₹3 L/yr - ₹4.1 L/yr |
Caparo Engineering India
Marelli
Enco Engineers Combine
Seoyon E-hwa Automotive