I applied via Approached by Company and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Aug 2021. There were 2 interview rounds.
posted on 3 May 2024
I applied via Indeed and was interviewed in Apr 2024. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
posted on 3 Oct 2021
I applied via Walk-in and was interviewed in Nov 2021. There were 3 interview rounds.
The tolerance of subgrade top refers to the acceptable deviation from the specified elevation of the subgrade surface.
Tolerance of subgrade top is typically specified in project plans or specifications.
It is important to measure and ensure that the subgrade top meets the specified tolerance to ensure proper construction of the pavement layers.
For example, a typical tolerance for subgrade top may be +/- 0.1 feet from th
Transition curve is a curve that connects a straight line with a circular curve in a smooth and gradual manner.
Transition curve is used in civil engineering and transportation engineering to ensure smooth transition between different types of curves.
It helps in reducing discomfort for passengers and minimizing wear and tear on vehicles.
Examples of transition curves include clothoid, cubic parabola, and spiral curves.
Camber is the curvature of the road surface while gradient is the slope of the road surface.
Camber refers to the curvature of the road surface, typically used to aid in water drainage.
Gradient refers to the slope of the road surface, indicating the rate of incline or decline.
Camber is measured in percentage or ratio, while gradient is measured in degrees or percentage.
Example: A road with a positive camber will slope s...
I applied via Naukri.com and was interviewed in Mar 2022. There were 3 interview rounds.
Drawing study, output BOQ etc.
Face to face interview
I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.
The principal of surveying involves accurately measuring and mapping the physical features of the land.
Surveying involves measuring and mapping land features such as boundaries, elevations, and distances.
The principal of surveying requires the use of specialized equipment such as total stations and GPS receivers.
Surveying is used in a variety of industries including construction, engineering, and land development.
Accur...
posted on 16 Sep 2017
I was interviewed before Sep 2016.
I applied via Referral and was interviewed before Feb 2021. There was 1 interview round.
I applied via Referral and was interviewed in Aug 2021. There were 2 interview rounds.
Civil Site Engineer
14
salaries
| ₹1 L/yr - ₹4.8 L/yr |
Civil Engineer
7
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Site Engineer
6
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Project Manager
4
salaries
| ₹5.2 L/yr - ₹9 L/yr |
Accountant
4
salaries
| ₹0.9 L/yr - ₹4 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group