Filter interviews by
I applied via Approached by Company and was interviewed before Aug 2023. There was 1 interview round.
The question is unclear and lacks context. It seems to be asking about the frequency of maintenance tool usage in operations.
Clarify the question with the interviewer to understand the specific context and details.
Provide examples of maintenance tools commonly used in operations.
Discuss the importance of regular maintenance to ensure smooth operation of equipment.
Packers are devices used in oil and gas wells to isolate sections of the wellbore during various operations.
There are two main types of packers: retrievable packers and permanent packers.
Retrievable packers can be removed from the wellbore after use, while permanent packers remain in place.
Packers can also be classified based on their setting mechanism, such as mechanical packers, hydraulic packers, and inflatable pack...
Top trending discussions
I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.
Glass is a solid, transparent material made by heating a mixture of silica and other materials.
Glass is a non-crystalline, amorphous solid
It is made by heating a mixture of silica, soda ash, and lime
It can be molded into various shapes and sizes
It is used in windows, mirrors, lenses, and containers
Different types of glass include tempered, laminated, and stained glass
Graphene is a thin layer of pure carbon arranged in a hexagonal lattice.
It is the thinnest material known to man
It is a good conductor of electricity and heat
It is incredibly strong and flexible
It has potential applications in electronics, energy, and medicine
posted on 16 Dec 2022
I applied via Approached by Company and was interviewed in Nov 2022. There were 2 interview rounds.
posted on 20 Aug 2021
I applied via Company Website and was interviewed in Feb 2021. There were 6 interview rounds.
posted on 31 Jan 2022
I appeared for an interview in Jan 2022.
posted on 5 Jan 2023
There are several types of HVAC systems, including central, split, packaged, ductless, and geothermal.
Central HVAC systems use ducts to distribute air throughout a building
Split systems have separate indoor and outdoor units
Packaged systems have all components in one unit
Ductless systems use individual units in each room
Geothermal systems use the earth's temperature to heat and cool a building
HVAC system is designed to control temperature, humidity, and air quality in a building.
HVAC stands for Heating, Ventilation, and Air Conditioning.
It includes components such as air handlers, ductwork, filters, and thermostats.
The system works by circulating air through the building and adjusting temperature and humidity levels.
It also helps to remove pollutants and maintain air quality.
Examples of HVAC systems include...
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Managed various projects including software development, system integration, and process improvement.
Led a team in developing a new software application for streamlining customer data management
Implemented system integration solutions to improve communication between different departments
Executed process improvement initiatives to increase efficiency and reduce costs
Collaborated with cross-functional teams to ensure pr
Continuous learning, growth, challenging projects, leadership opportunities, work-life balance
Continuous learning and skill development through training and certifications
Opportunities for career growth and advancement
Challenging projects that allow for problem-solving and innovation
Leadership opportunities to mentor and guide junior team members
Maintaining a healthy work-life balance to prevent burnout
based on 1 interview
Interview experience
Accountant
40
salaries
| ₹5.5 L/yr - ₹13.7 L/yr |
Senior Accountant
36
salaries
| ₹9.6 L/yr - ₹23.5 L/yr |
Procurement Specialist
21
salaries
| ₹7 L/yr - ₹12.5 L/yr |
Data Scientist
20
salaries
| ₹8.2 L/yr - ₹21 L/yr |
HR Specialist
20
salaries
| ₹7 L/yr - ₹10.5 L/yr |
Shapoorji Pallonji Group
Alstom Transportation
Saint-Gobain
AECOM