Upload Button Icon Add office photos

Filter interviews by

Hajee A P Bava Construction Business Analyst Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

I applied via Recruitment Consultant

Interview Questionnaire 

5 Questions

  • Q1. I am aaply for business analyst position .
  • Q2. I am continuous apply in l@t ,but company acqusition team not respond?
  • Q3. My queries a what a expected salary ?
  • Q4. Last question please company recuriters call back and job process start.
  • Q5. My opinion l@t avoid my resume .

Interview Preparation Tips

Interview preparation tips for other job seekers - Please company hr back and pre job discussion start

Interview Questionnaire 

4 Questions

  • Q1. What is Google sheets
  • Ans. 

    Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.

    • Allows users to create and edit spreadsheets online

    • Offers collaboration features for real-time editing and commenting

    • Can import and export various file formats, including Microsoft Excel

    • Offers add-ons and scripts for automation and customization

    • Accessible from any device with internet connection

  • Answered by AI
  • Q2. What is the MDD & OMC of soil
  • Ans. 

    MDD & OMC are important parameters for soil compaction and moisture content.

    • MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.

    • OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.

    • These parameters are important for determining the appropriate moisture content and compaction effort for...

  • Answered by AI
  • Q3. What is the velocity of steel
  • Ans. 

    The velocity of steel varies depending on the type and conditions.

    • The velocity of steel can range from 5000 to 6000 meters per second

    • The velocity of steel can be affected by factors such as temperature and pressure

    • The velocity of steel is important in industries such as construction and manufacturing

  • Answered by AI
  • Q4. What is the cube test result in 7 days
  • Ans. 

    The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.

    • The cube test can refer to various tests in different fields such as construction, engineering, and materials science.

    • For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.

    • The result of the cube test can vary depending on factors such as the ty...

  • Answered by AI

Skills evaluated in this interview

Interview Questionnaire 

2 Questions

  • Q1. Working purpos
  • Q2. How to E. T. S work
  • Ans. 

    ETS (Educational Testing Service) is a non-profit organization that develops and administers standardized tests.

    • ETS develops and administers tests like the GRE, TOEFL, and Praxis exams.

    • The organization also offers research and assessment services for educational institutions.

    • ETS uses computer-based testing and scoring for many of its exams.

    • The organization has faced criticism for its role in the standardized testing in

  • Answered by AI

I applied via Referral and was interviewed before May 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

I received a video call link and in that link will get the accounting basic questions for that we have to answer after a beep.

Round 2 - Technical 

(1 Question)

  • Q1. It was all basic accounting question.mostly related to 12th standard c v raman book Friendly interviewers
Round 3 - HR 

(1 Question)

  • Q1. 5 min telephonic call with recruiter

Interview Preparation Tips

Interview preparation tips for other job seekers - Get yourself prepared with basic accounting questions and be confident

Interview Questionnaire 

15 Questions

  • Q1. What is pile?
  • Ans. 

    A pile is a long, cylindrical structure made of materials such as concrete, steel, or wood, used to support heavy loads.

    • Piles are commonly used in construction to support buildings, bridges, and other structures.

    • They are driven or drilled into the ground to provide stability and prevent settling or shifting.

    • Different types of piles include timber, concrete, steel, and composite piles.

    • Pile foundations are often used in ...

  • Answered by AI
  • Q2. What is vertical load test of pile ?
  • Ans. 

    Vertical load test of pile is a test to determine the load carrying capacity of a pile.

    • A vertical load is applied to the pile using a hydraulic jack or a reaction frame.

    • The load is increased until the pile reaches its ultimate capacity or a predetermined limit.

    • The test helps in determining the pile's load settlement behavior and its ultimate bearing capacity.

    • The test is commonly used in the construction industry to ens...

  • Answered by AI
  • Q3. What is the lateral load test of pile ?
  • Ans. 

    Lateral load test of pile is a test to determine the lateral capacity of a pile.

    • It involves applying a horizontal load to the pile and measuring the deflection.

    • The test is conducted by using a hydraulic jack or a reaction frame.

    • The lateral load test helps in determining the lateral load capacity of the pile.

    • The test results are used to design the foundation of the structure.

    • The lateral load test is important for struct...

  • Answered by AI
  • Q4. IS code Vertical load test of pile ?
  • Ans. 

    Yes

    • Yes, there is an IS code for vertical load test of piles.

    • The relevant IS code is IS 2911 (Part 4): 2013 - 'Design and construction of pile foundations - Load test on piles'.

    • This code provides guidelines for conducting vertical load tests on piles to determine their load-carrying capacity and performance.

    • The code covers various aspects such as test setup, instrumentation, loading procedures, acceptance criteria, and ...

  • Answered by AI
  • Q5. Why I do vertical load test of pile ?
  • Ans. 

    Vertical load test of pile is done to determine the load carrying capacity of the pile.

    • To ensure the pile can support the intended load

    • To determine the settlement of the pile under load

    • To verify the design assumptions

    • To assess the quality of the pile installation

    • Examples: bridge piers, high-rise buildings, transmission towers

  • Answered by AI
  • Q6. Vertical load test procedure ?
  • Ans. 

    Vertical load test is a procedure to determine the load-bearing capacity of a structure.

    • The test involves applying a vertical load to the structure and measuring the resulting deflection.

    • The load is gradually increased until the structure reaches its maximum load-bearing capacity.

    • The test can be performed using hydraulic jacks, weights, or other equipment.

    • The results of the test are used to ensure the safety and stabil...

  • Answered by AI
  • Q7. Lateral load test procedure ?
  • Ans. 

    Lateral load test is a procedure to determine the strength and stability of a structure against horizontal forces.

    • The test involves applying a horizontal force to the structure and measuring its response.

    • The force is usually applied using hydraulic jacks or a reaction frame.

    • The test is performed on a representative section of the structure, such as a column or a wall.

    • The results of the test are used to verify the desig...

  • Answered by AI
  • Q8. What is the SPT test of soil ?
  • Ans. 

    SPT test is a standard penetration test used to determine the soil's resistance to penetration.

    • SPT test involves driving a standard sampler into the soil using a hammer of standard weight and height.

    • The number of blows required to drive the sampler a certain distance is recorded as the SPT N-value.

    • SPT test is commonly used in geotechnical engineering to determine soil properties such as shear strength and bearing capac...

  • Answered by AI
  • Q9. What is MPR ,WPR , DPR ?
  • Ans. 

    MPR, WPR, and DPR are acronyms used in various fields to represent different concepts.

    • MPR stands for Monthly Progress Report, which is a document that provides an overview of the progress made during a specific month.

    • WPR stands for Weekly Progress Report, which is a document that highlights the progress made on a weekly basis.

    • DPR stands for Daily Progress Report, which is a document that summarizes the daily progress m...

  • Answered by AI
  • Q10. BBS calculation of pile ?
  • Ans. 

    BBS calculation is a method used to determine the reinforcement required for a pile.

    • BBS stands for Bar Bending Schedule.

    • It involves calculating the length and number of steel bars required for the pile.

    • Factors such as load capacity, soil type, and pile diameter are taken into consideration.

    • The BBS is used to ensure the pile can withstand the required load and prevent failure.

  • Answered by AI
  • Q11. How meny test of pile ?
  • Ans. 

    The number of tests required for a pile depends on various factors such as the type of pile, soil conditions, and project requirements.

    • The number of tests can range from one to several depending on the project.

    • Common tests for piles include static load tests, dynamic load tests, and integrity tests.

    • Factors such as pile length, diameter, and soil type can affect the number of tests required.

    • The project specifications an...

  • Answered by AI
  • Q12. What is the cut off level of pile ?
  • Ans. 

    The cut off level of pile depends on various factors such as soil type, load capacity, and design requirements.

    • The cut off level of pile is the depth at which the pile is embedded into the ground.

    • It is determined by the soil type and load capacity of the ground.

    • The design requirements of the structure being built also play a role in determining the cut off level of pile.

    • For example, if the structure requires a deeper f...

  • Answered by AI
  • Q13. Minimum distance of detume bar of pile vertical load test ?
  • Ans. 

    The minimum distance of detume bar of pile vertical load test is typically 2.5 times the diameter of the pile.

    • The detume bar is used to measure the settlement of the pile during the load test.

    • The minimum distance is important to ensure accurate measurement of the pile settlement.

    • The distance is typically 2.5 times the diameter of the pile, but may vary depending on the specific test requirements.

    • If the distance is too ...

  • Answered by AI
  • Q14. Why I do dynamic load test of pile ?
  • Ans. 

    Dynamic load test of pile is done to assess its load carrying capacity and integrity.

    • To ensure the pile can withstand the expected load and prevent failure

    • To determine the pile's ultimate bearing capacity

    • To assess the pile's integrity and detect any defects or damage

    • To verify the design assumptions and optimize the foundation design

    • Examples: bridge piers, tall buildings, wind turbines, etc.

  • Answered by AI
  • Q15. Why I do integrity test of pile ?
  • Ans. 

    Integrity test of pile is done to ensure the pile is structurally sound and can bear the required load.

    • To ensure the pile is not damaged during installation

    • To check if the pile is free from any defects or cracks

    • To verify if the pile can bear the required load

    • To ensure the safety of the structure and its occupants

    • Examples: Sonic Integrity Testing, Crosshole Sonic Logging, etc.

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How to manage Project life cycle?
  • Ans. 

    Project life cycle can be managed by following a structured approach that includes planning, execution, monitoring, and closure.

    • Define project scope, objectives, and deliverables

    • Create a project plan with timelines, milestones, and resources

    • Execute the plan and monitor progress regularly

    • Identify and manage risks, issues, and changes

    • Close the project by delivering the final product and conducting a post-project review

  • Answered by AI
  • Q2. How to manage client relationship?
  • Ans. 

    Managing client relationships involves effective communication, understanding their needs, and delivering quality service.

    • Establish clear communication channels and respond promptly to their queries

    • Understand their needs and expectations and tailor your services accordingly

    • Deliver quality service and exceed their expectations

    • Maintain transparency and honesty in all dealings

    • Regularly seek feedback and take corrective ac...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be happy. Be honest. Just say what u know. Don't say any false.
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What is you present package?
Round 3 - Technical 

(1 Question)

  • Q1. What is quality control and quality assurance.?
  • Ans. 

    Quality control involves checking the quality of products during production, while quality assurance focuses on preventing defects before they occur.

    • Quality control involves inspecting products to ensure they meet specific standards and requirements.

    • Quality assurance involves implementing processes and procedures to prevent defects and errors in the production process.

    • Quality control is reactive, focusing on identifyin...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is slump test
  • Ans. 

    Slump test is a concrete test to measure the consistency and workability of freshly mixed concrete.

    • It involves filling a slump cone with concrete, then removing the cone and measuring how much the concrete slumps or settles.

    • The amount of slump can indicate the water content, mix proportions, and consistency of the concrete.

    • A higher slump value indicates a more workable mix, while a lower slump value indicates a stiffer...

  • Answered by AI
  • Q2. Mix design of concrete
  • Ans. 

    Concrete mix design involves determining the proportions of ingredients to achieve desired properties.

    • Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.

    • Factors to consider in mix design include strength, workability, durability, and cost.

    • Examples of ingredients in concrete mix design are cement, water, aggregates, and admix

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. What is Pile foundation
  • Ans. 

    Pile foundation is a type of deep foundation used to transfer loads from a structure to a stronger layer of soil or rock deep below the surface.

    • Pile foundations are used when shallow foundations are not feasible due to weak soil conditions or high structural loads.

    • There are different types of pile foundations, including driven piles, bored piles, and screw piles.

    • Pile foundations can be made of materials such as concret...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Avoid using too much corporate jargon in your CV. Sometimes keeping things simple will get your job done.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Water proofing Related question
  • Q2. BBS Related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Totally Technical interview it was.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Introduction ,current job profile ,Current CTC ,expected CTC

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 765 Interviews
Tata Projects Interview Questions
4.2
 • 458 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
Saint-Gobain Interview Questions
4.0
 • 174 Interviews
View all
Mechanical Engineer
74 salaries
unlock blur

₹1.8 L/yr - ₹5.2 L/yr

Safety Officer
51 salaries
unlock blur

₹2.2 L/yr - ₹4.5 L/yr

Accountant
30 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Site Engineer
21 salaries
unlock blur

₹1.8 L/yr - ₹4.6 L/yr

Engineer
17 salaries
unlock blur

₹1.8 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Hajee A P Bava Construction with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview