i
Haier Appliances India
Filter interviews by
I applied via Recruitment Consulltant
Refrigerant is a substance used in a heat pump or refrigeration cycle to transfer heat between the indoors and outdoors.
Refrigerant absorbs heat from the indoor air and releases it outside
It changes from a liquid to a gas and back again in the refrigeration cycle
Common refrigerants include R-410A, R-134a, and R-22
Refrigerants should be handled carefully due to their potential environmental impact
PLC stands for Programmable Logic Controller, used in industrial automation to control machinery and processes.
PLC is a digital computer used to automate electromechanical processes.
It uses a programmable memory to store instructions and execute specific functions.
PLCs are commonly used in manufacturing plants, assembly lines, and other industrial settings.
They can be programmed using ladder logic, function block diagr...
MTTR stands for Mean Time To Repair and MTBF stands for Mean Time Between Failures.
MTTR is the average time taken to repair a failed component or system.
MTBF is the average time between failures of a component or system.
MTTR is usually measured in hours or days, while MTBF is also measured in hours or days.
MTTR is an important metric for assessing maintenance efficiency, while MTBF is used to predict the reliability of...
I applied via Walk-in and was interviewed before Jul 2021. There were 2 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed before Aug 2020. There was 1 interview round.
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
Insulation
Insulate the panel
Use protective covers
Ensure proper grounding
Regular maintenance
UG cable laying process involves trenching, cable pulling, jointing, and testing.
Trenching is done to create a path for the cable and ensure proper depth
Cable pulling involves laying the cable in the trench and securing it with clamps
Jointing is done to connect two cables together using connectors and insulators
Testing is done to ensure the cable is properly installed and functioning
Criteria for UG cable laying include...
I applied via Job Portal and was interviewed in Oct 2023. There were 2 interview rounds.
1 hour - Trees, Array, Hashmap, DP, CP etc
I applied via Recruitment Consulltant and was interviewed before Jan 2021. There were 4 interview rounds.
I applied via Apna Jobs and was interviewed in Mar 2022. There were 3 interview rounds.
I will immediately investigate the cause of the NG lot and work with the team to find a solution to make it usable.
Investigate the cause of the NG lot
Work with the team to find a solution
Prioritize urgent use of the lot
Ensure quality control measures are in place
Communicate with stakeholders about the situation
based on 1 interview
Interview experience
based on 10 reviews
Rating in categories
Assistant Manager
270
salaries
| ₹3.8 L/yr - ₹10.3 L/yr |
Senior Engineer
256
salaries
| ₹3.5 L/yr - ₹9.1 L/yr |
Deputy Manager
224
salaries
| ₹5 L/yr - ₹16 L/yr |
Sales Executive
180
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Engineer
149
salaries
| ₹2.8 L/yr - ₹5.5 L/yr |
Vivo
OPPO
LG Electronics
HARMAN