Filter interviews by
Clear (1)
I applied via Company Website and was interviewed before Feb 2023. There were 3 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Dec 2021. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jan 2023. There was 1 interview round.
Dealing with liquid measurement involves understanding units, using appropriate tools, and considering factors like temperature and viscosity.
Understand different units of liquid measurement, such as liters, milliliters, gallons, and fluid ounces.
Use appropriate tools like measuring cups, graduated cylinders, or pipettes to accurately measure liquids.
Consider factors like temperature and viscosity, as they can affect t...
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 3 interview rounds.
I am not currently working with a boiler.
I do not have experience with boilers.
I am willing to learn and adapt to new systems.
If there is a specific type of boiler required for the job, I am open to training and gaining experience with it.
Our plant process has a capacity of 500 units per day.
Our plant process is designed to handle up to 500 units per day.
We have optimized our production line to achieve a maximum capacity of 500 units per day.
Our current production rate is at 80% of our plant process capacity.
We are constantly looking for ways to improve our plant process to increase capacity.
CFBC boiler problems can include ash buildup, erosion, and corrosion.
Regular cleaning and maintenance can prevent ash buildup
Using high-quality refractory materials can prevent erosion
Using corrosion-resistant materials can prevent corrosion
Monitoring and controlling the temperature and pressure can prevent other issues
Consulting with experts and following manufacturer guidelines can help address any problems
A protection system is a set of devices and measures designed to prevent damage or harm to equipment, personnel, or the environment in case of a fault or abnormal condition.
Protection systems can include circuit breakers, fuses, relays, and alarms.
They are commonly used in electrical systems to prevent overloads, short circuits, and ground faults.
Protection systems are essential for ensuring the safety and reliability ...
I applied via LinkedIn and was interviewed before Sep 2022. There were 3 interview rounds.
Pipe sizing calculation involves determining the appropriate diameter of a pipe based on flow rate, pressure drop, and material properties.
Calculate the required flow rate for the system
Determine the pressure drop allowed in the system
Consider the material properties of the pipe such as friction factor and roughness
Use pipe sizing charts or formulas to find the appropriate diameter
Ensure the selected pipe size meets th
I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Jan 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2022. There were 3 interview rounds.
DMZ is a network segment that acts as a buffer zone between the internet and an organization's internal network.
DMZ stands for Demilitarized Zone.
It is a network segment that is isolated from the internal network and the internet.
It is used to host publicly accessible servers like web servers, email servers, etc.
DMZ is protected by a firewall that allows only specific traffic to pass through.
It helps to enhance the sec...
based on 2 interviews
Interview experience
based on 27 reviews
Rating in categories
Assistant Engineer
115
salaries
| ₹0 L/yr - ₹0 L/yr |
Graduate Apprenticeship Trainee
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Process Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
29
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Chemicals
Deepak Nitrite
Pidilite Industries
UPL