Upload Button Icon Add office photos

Filter interviews by

Greenko Group Lab Technician Interview Questions and Answers

Updated 29 Feb 2024

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. About gas turbine
  • Q2. PLC and DCS or offsite of plant

Technician Interview Questions & Answers

Vestas user image mikal jakeson

posted on 12 Oct 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Your experience for ask me ? My answer 5 years experience
  • Q2. Your 12month working no problem yes or no ask ? I am asking no problem I am working for full 1 year
  • Q3. Wind power any experience asking?
  • Q4. You torking and service work experience and Blade ripearing any experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Vestas is a best us company of India
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is difference between earth and neutral ?
  • Ans. 

    Earth is the connection between an electrical circuit and the ground, while neutral is the return path for current in a circuit.

    • Earth is a safety measure to prevent electric shock and protect against electrical faults.

    • Neutral carries the current back to the source in a circuit.

    • Earth is typically connected to the ground through a grounding electrode.

    • Neutral is usually connected to the center tap of a transformer.

    • In a th...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Working base questions
  • Q2. 5 s mainten in daily basis in work
  • Ans. 

    Performing 5 seconds maintenance tasks on a daily basis at work.

    • Performing regular maintenance tasks can help prevent equipment breakdowns and prolong their lifespan.

    • Examples of 5-second maintenance tasks include wiping down equipment, checking for loose screws, and clearing debris.

    • By incorporating these tasks into a daily routine, employees can ensure that equipment is functioning properly and avoid costly repairs.

    • Reg...

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Wind Blade manufacturing process Type of row material
  • Ans. 

    The raw material for wind blade manufacturing is primarily fiberglass and resin.

    • Fiberglass is a composite material made of glass fibers and resin.

    • The resin is typically a thermosetting polymer that hardens when cured.

    • Other materials such as carbon fiber, balsa wood, and foam may also be used in the manufacturing process.

    • The raw materials are layered and molded into the desired shape of the wind blade.

    • The manufacturing ...

  • Answered by AI
  • Q2. Preelpy gsm release foil

Interview Preparation Tips

Interview preparation tips for other job seekers - Nokri.com
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before Aug 2023. There were 4 interview rounds.

Round 1 - Aptitude Test 

Solar industry relative question

Round 2 - Technical 

(4 Questions)

  • Q1. What is principal working in ingot process?
  • Ans. 

    Principal working in ingot process involves melting raw materials, pouring into molds, solidifying, and removing ingots for further processing.

    • Melting raw materials such as metal or alloy in a furnace

    • Pouring the molten material into molds to shape it into ingots

    • Allowing the material to solidify and cool in the molds

    • Removing the solidified ingots from the molds for additional processing or use

  • Answered by AI
  • Q2. What is material used in ingot process?
  • Ans. 

    The material used in the ingot process is typically metal, such as aluminum, steel, or copper.

    • Metal is the primary material used in the ingot process

    • Common metals used include aluminum, steel, and copper

    • The ingot process involves melting the metal and pouring it into molds to cool and solidify

  • Answered by AI
  • Q3. What is a CZ process?
  • Ans. 

    CZ process stands for Chemical Mechanical Polishing or Chemical Mechanical Planarization, a process used in semiconductor manufacturing.

    • CZ process involves using a combination of chemical and mechanical forces to polish a semiconductor wafer surface.

    • It helps to achieve a flat and smooth surface necessary for creating precise semiconductor devices.

    • Examples of CZ process equipment include CMP machines and slurries used f...

  • Answered by AI
  • Q4. How many times used making a one ingot ?
  • Ans. 

    The number of times used making a one ingot depends on the size of the ingot and the manufacturing process.

    • The number of times a one ingot is used can vary depending on the size of the ingot and the specific manufacturing process.

    • In some cases, a single ingot may be used multiple times to create different products.

    • For example, in metal casting, an ingot may be melted down and poured into molds multiple times to create

  • Answered by AI
Round 3 - Group Discussion 

Production planning
HMI interface
Semiconductor related

Round 4 - HR 

(1 Question)

  • Q1. Salary discuss

I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Group Discussion 

About the T.B.T.& P.T.W.
About the Module, SCB, Cables ,Inverter, IDT ,HT-LT Panel ,ICOG Panel And Other Electrical Elements and all block successfully charged

Round 3 - Coding Test 

Cable colour coding
All panel wiring & wiring coding

Interview Preparation Tips

Topics to prepare for ReNew Technician interview:
  • Data Structures
  • PPC
  • All information about power plan
  • About the Module SCB Cables IDT
Interview preparation tips for other job seekers - Best Regards
Discipline
Dedication
Best performance

I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Which device to use for testing insulation?
  • Ans. 

    A megohmmeter is used for testing insulation.

    • A megohmmeter, also known as an insulation tester, is used to measure the resistance of insulation materials.

    • It applies a high voltage to the insulation and measures the current flowing through it.

    • The results help determine if the insulation is in good condition or if there are any faults or leaks.

    • Megohmmeters are commonly used in electrical and electronic industries to ensu...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - We use megger to test for insulation

I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Solar fild

Interview Preparation Tips

Interview preparation tips for other job seekers - Solar ground mounted

Interview Questionnaire 

1 Question

  • Q1. About your previous experiences

Greenko Group Interview FAQs

How many rounds are there in Greenko Group Lab Technician interview?
Greenko Group interview process usually has 1 rounds. The most common rounds in the Greenko Group interview process are Technical.

Tell us how to improve this page.

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 201 Interviews
Suzlon Group Interview Questions
4.1
 • 123 Interviews
ReNew Interview Questions
4.2
 • 81 Interviews
Vestas Interview Questions
4.3
 • 81 Interviews
Jakson Group Interview Questions
4.3
 • 74 Interviews
Wind World Interview Questions
3.9
 • 70 Interviews
Siemens Energy Interview Questions
4.2
 • 69 Interviews
Waaree Energies Interview Questions
3.9
 • 55 Interviews
View all
Assistant Manager
392 salaries
unlock blur

₹2.8 L/yr - ₹10.6 L/yr

Deputy Manager
259 salaries
unlock blur

₹4.1 L/yr - ₹13 L/yr

Officer
225 salaries
unlock blur

₹2 L/yr - ₹6.9 L/yr

Assistant Engineer
77 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Manager
75 salaries
unlock blur

₹7 L/yr - ₹20 L/yr

Explore more salaries
Compare Greenko Group with

Adani Green Energy

4.1
Compare

Tata Power Renewable Energy

3.7
Compare

ReNew

4.2
Compare

Hero Future Energies

4.4
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview