i
Greaves Cotton
Filter interviews by
I applied via Referral and was interviewed before Feb 2020. There were 4 interview rounds.
Fluid flow can be classified into three types: laminar, turbulent, and transitional.
Laminar flow is characterized by smooth and predictable movement of fluid particles in parallel layers.
Turbulent flow is characterized by chaotic and irregular movement of fluid particles.
Transitional flow is a mix of laminar and turbulent flow and occurs when the flow rate or viscosity of the fluid changes.
Examples of laminar flow incl...
Power plants convert fuel into electricity using steam turbines.
Fuel is burned to produce heat, which is used to create steam.
The steam drives a turbine, which generates electricity.
Different types of power plants use different fuels, such as coal, natural gas, or nuclear fuel.
Renewable energy sources like wind and solar can also be used to generate electricity.
Power plants require regular maintenance to ensure safe an
5S is a lean manufacturing methodology that aims to improve workplace organization and efficiency.
Sort: Remove unnecessary items from the workplace
Set in order: Organize remaining items in a logical manner
Shine: Clean and maintain the workplace
Standardize: Establish procedures and standards for maintaining the workplace
Sustain: Continuously improve and maintain the workplace
Example: Using color-coded labels to identify
Top trending discussions
I applied via Approached by Company and was interviewed in Feb 2023. There were 4 interview rounds.
Several Questions from different technical leads. But all questions were related to general work practices, nothing specific to deleverables
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
No one in the panel was from the relevant background and they were creating hypothetical situations
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
I have 8 years of experience in the field of engineering.
I have worked in various engineering roles for 8 years
I have experience in project management, design, and implementation
I have successfully completed multiple engineering projects
I have received positive feedback and recognition for my work
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
Assistant Manager
218
salaries
| ₹4 L/yr - ₹12.2 L/yr |
Manager
96
salaries
| ₹5 L/yr - ₹16 L/yr |
Senior Production Associate
84
salaries
| ₹2.8 L/yr - ₹5.4 L/yr |
Senior Manager
68
salaries
| ₹8.5 L/yr - ₹21.7 L/yr |
Design Engineer
64
salaries
| ₹2.6 L/yr - ₹5.6 L/yr |
JBM Group
Subros
Endurance Technologies
Spark Minda