I applied via Approached by Company and was interviewed in Dec 2022. There were 3 interview rounds.
CAPITAL ACCOUNT & BALANCE SHEET
I applied via Campus Placement and was interviewed before Oct 2022. There were 4 interview rounds.
Numbers,LCM,HCF,Time speed Distance,Percentage
They randomly given any topic. Time limit is 5-10 minutes in a group of 10 members. Everyone has to speak about the topic.
Types of concrete include normal strength, high strength, and high-performance concrete, each with different mix proportions.
Normal strength concrete: typically used for general construction, with mix proportions of 1:2:4 (cement:sand:aggregate)
High strength concrete: used for structures requiring higher strength, with mix proportions of 1:1.5:3
High-performance concrete: designed for specific applications, with mix pro
Steps involved in concreting & curing include preparation of formwork, mixing of concrete, pouring, leveling, finishing, and curing.
Prepare formwork by setting up wooden or metal molds to contain the concrete.
Mix concrete ingredients such as cement, sand, aggregate, and water in the correct proportions.
Pour the concrete into the formwork, ensuring it reaches all corners and edges.
Level the concrete surface using a scre...
Retaining walls are structures designed to hold back soil and prevent erosion.
Prevent soil erosion
Support sloping terrain
Create usable space on a hillside
Enhance landscaping design
Bending moment & Shear force diagrams show the variation of internal forces along the length of a beam.
Bending moment diagram shows the variation of bending moment along the length of a beam.
Shear force diagram shows the variation of shear force along the length of a beam.
These diagrams are essential for analyzing the behavior of beams under different loading conditions.
The diagrams help in determining the maximum bend...
Quantity Surveyors manage costs and contracts for construction projects, both on-site and in the office.
Preparing cost estimates and budgets
Analyzing construction plans and specifications
Negotiating with contractors and suppliers
Managing contracts and variations
Conducting site visits and inspections
Preparing progress reports and final accounts
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
Regarding how to manage a site accommodation
I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.
Prioritize tasks based on deadlines and importance
Stay organized by creating to-do lists and setting realistic goals
Take breaks to recharge and prevent burnout
Communicate with team members and delegate tasks when necessary
posted on 16 Aug 2021
posted on 26 Jul 2023
I applied via Naukri.com and was interviewed in Jun 2023. There were 3 interview rounds.
posted on 4 May 2024
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
String & central inverters are types of solar inverters used in solar power systems. Transformers are used to step up or step down voltage in electrical systems.
String inverters are used in smaller solar power systems and convert DC power from solar panels into AC power for use in the home.
Central inverters are used in larger solar power systems and are connected to multiple strings of solar panels to convert DC power ...
Hari Transformer unloading involves safely removing transformers from trucks and placing them in designated areas.
Ensure proper safety measures are in place before unloading transformers
Use appropriate equipment such as cranes or forklifts to lift and move the transformers
Follow manufacturer's guidelines for handling and placement of transformers
Inspect transformers for any damage during unloading process
Coordinate wit...
posted on 3 Sep 2022
I applied via LinkedIn and was interviewed in Mar 2022. There were 3 interview rounds.
based on 1 interview
Interview experience
Senior Engineer
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Coordinator
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Suzlon Group
ReNew
Greenko Group
Adani Green Energy