Upload Button Icon Add office photos

Filter interviews by

GPI Projects Interview Questions and Answers

Updated 22 Mar 2024

GPI Projects Interview Experiences

Popular Designations

3 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is the tan delta of CT ?
  • Ans. 

    The tan delta of a Current Transformer (CT) is a measure of its insulation quality.

    • Tan delta is a measure of the power factor of the insulation material in the CT.

    • It indicates the quality of the insulation and any potential issues with the CT.

    • A low tan delta value indicates good insulation quality, while a high value may indicate deterioration.

    • Regular testing of tan delta is important to ensure the CT's reliability and...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Answering confidently

Shift Engineer Interview Questions asked at other Companies

Q1. What is the process of oil top-up in fluid coupling
View answer (3)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2022. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. About electrical equipment
  • Q2. Breaker and ct pt

Electrical Engineer Interview Questions asked at other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ?
View answer (13)

I applied via Referral and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Substation all equipment, power transformer,relay,
  • Q2. Layout of transmission line of ganaration to distribution.
  • Ans. 

    Transmission lines carry electricity from power plants to distribution substations.

    • Transmission lines are typically high voltage and operate at 69 kV or higher

    • They are designed to minimize power loss and maximize efficiency

    • Transmission lines can be overhead or underground

    • Distribution substations step down the voltage for use in homes and businesses

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared your self..and basic concept are clears..n

Electrical Shift Engineer Interview Questions asked at other Companies

Q1. What are the troubleshooting techniques used in electrical systems?
View answer (1)

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About my experience and what kind of job i can handle etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Mine experience was Nice , they were also kind and gentle . During interview they help me also to define some terms and specifications etc

I applied via Company Website and was interviewed in Feb 2021. There were 6 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Everything related to our field
  • Q2. Past and current project contributions
  • Q3. What do you think about SPCPL

Interview Preparation Tips

Interview preparation tips for other job seekers - Being a professional firm, professional interview and presentation needs to clear
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be honest with your years of experience. All information you share will be verified at the time of joining.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Material Producer's
  • Q2. Matrial Management
Round 3 - One-on-one 

(1 Question)

  • Q1. Final round is taken Functional head Management skill Questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Pile foundation Pile Cap BBBS
Round 3 - HR 

(1 Question)

  • Q1. Salary Negotiable
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Elaborate VT pump installation process step by step.. How many valves & types used in Raising main? Explain about Cooling Lubrication system.
  • Ans. 

    The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.

    • The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.

    • The raising main typically has gate valves, check valves, and air release valves.

    • The cooling lubrication system is responsib...

  • Answered by AI
  • Q2. Why are you going to quit the current job?
  • Ans. 

    I am looking for new challenges and opportunities for growth.

    • Seeking new challenges and opportunities for growth

    • Wanting to expand my skill set and knowledge

    • Desire for a higher level of responsibility

    • Seeking a better work-life balance

    • Unsatisfied with the current work environment or company culture

  • Answered by AI
  • Q3. What is your salary expectation?
  • Ans. 

    I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.

    • I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.

    • I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident..
Be Genuine..
Listen each & every Qustion or case study & Explain properly as per practical conditions.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2022. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. Manufacturing of cement, Durability of concrete, Chemical reaction of cement with water.
  • Ans. 

    The manufacturing of cement involves chemical reactions with water, resulting in the durability of concrete.

    • Cement is made by heating limestone, clay, and other materials in a kiln

    • The chemical reaction between cement and water, known as hydration, results in the hardening of concrete

    • The durability of concrete depends on factors such as the water-cement ratio, curing time, and quality of materials used

  • Answered by AI
  • Q2. Why LnT, Where do you see yourself after 5 years, SWOT analysis, About LnT
  • Q3. Calculate deflection at the free end of a cantilever beam with a point load at the end
  • Ans. 

    Calculate deflection at free end of cantilever beam with point load at end

    • Use the formula: δ = (PL³)/(3EI)

    • P is the point load at the end

    • L is the length of the cantilever beam

    • E is the modulus of elasticity of the beam material

    • I is the moment of inertia of the beam's cross-sectional area

    • Example: A steel cantilever beam with a length of 2 meters and a point load of 500 N at the end has a deflection of 0.104 mm

  • Answered by AI
  • Q4. What is camber, How do we provide camber, Steps for the construction of a Road
  • Ans. 

    Camber is the slope provided to the road surface to drain off rainwater. It is achieved by raising the center of the road surface.

    • Camber is the curvature provided to the road surface to ensure proper drainage of rainwater.

    • It is achieved by raising the center of the road surface.

    • The amount of camber depends on the width of the road and the expected rainfall.

    • The steps for the construction of a road include surveying, cle...

  • Answered by AI
  • Q5. What is an admixture, How do they affect the concrete, name various admixtures.
  • Ans. 

    Admixtures are chemicals added to concrete to enhance its properties. They affect the workability, strength, and durability of concrete.

    • Admixtures are added to concrete to improve its quality and performance.

    • They can affect the setting time, workability, strength, and durability of concrete.

    • Examples of admixtures include water reducers, accelerators, retarders, air-entraining agents, and superplasticizers.

  • Answered by AI
  • Q6. What is hoop stress, How to provide reinforcement in a dome
  • Ans. 

    Hoop stress is the stress exerted circumferentially in a cylindrical or spherical object. Reinforcement in a dome can be provided by using steel bars or mesh.

    • Hoop stress is caused by the pressure inside the object and is calculated using the formula P*r/t, where P is the pressure, r is the radius, and t is the thickness of the object.

    • In a dome, reinforcement can be provided by using steel bars or mesh that are placed i...

  • Answered by AI
  • Q7. What is estimation and costing, No. of bricks required in 1 m3 of brickwork, various types of contracts
  • Ans. 

    Estimation and costing involves calculating the expenses of a project. No. of bricks required in 1 m3 of brickwork depends on the size of the bricks. There are various types of contracts in construction.

    • Estimation and costing involves calculating the expenses of a project, including materials, labor, and other costs.

    • No. of bricks required in 1 m3 of brickwork depends on the size of the bricks used. For example, if stan...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and don't try to bluff them, if you don't know the answer simply tell them that I can't recall the answer at the moment don't beat them around the bushes.

GPI Projects Interview FAQs

How many rounds are there in GPI Projects interview?
GPI Projects interview process usually has 1-2 rounds. The most common rounds in the GPI Projects interview process are Resume Shortlist, One-on-one Round and Technical.
How to prepare for GPI Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at GPI Projects . The most common topics and skills that interviewers at GPI Projects expect are Communication Skills, Convincing Power, Marketing Communication and Public Relations.
What are the top questions asked in GPI Projects interview?

Some of the top questions asked at the GPI Projects interview -

  1. Layout of transmission line of ganaration to distributi...read more
  2. What is the tan delta of C...read more
  3. Substation all equipment, power transformer,rel...read more

Tell us how to improve this page.

GPI Projects Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more

GPI Projects Reviews and Ratings

based on 14 reviews

4.2/5

Rating in categories

3.9

Skill development

3.9

Work-life balance

3.7

Salary

3.8

Job security

3.9

Company culture

3.6

Promotions

3.8

Work satisfaction

Explore 14 Reviews and Ratings
Shift Engineer
10 salaries
unlock blur

₹1.1 L/yr - ₹2.2 L/yr

Electrical Engineer
4 salaries
unlock blur

₹1.4 L/yr - ₹2.2 L/yr

Executive Accountant
4 salaries
unlock blur

₹1.2 L/yr - ₹3.2 L/yr

SBO
4 salaries
unlock blur

₹1.1 L/yr - ₹2.5 L/yr

Project Engineer and Project Coordinator
4 salaries
unlock blur

₹4.5 L/yr - ₹5.5 L/yr

Explore more salaries
Compare GPI Projects with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview