i
Goodyear
Filter interviews by
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
Manager sir give all worker's question paper and we are write the answer
This is a surprise group discussion we are sitting in hall with manager observation
Top trending discussions
I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.
personal details, my self ( I'm..., my graduation, hobbies, skills, family etc.)
PPE stands for Personal Protective Equipment, which includes clothing and gear worn to minimize exposure to hazards.
PPE includes items like gloves, goggles, helmets, and masks.
It is used in various industries such as construction, healthcare, and manufacturing.
PPE is essential for protecting workers from injuries and illnesses.
Examples of PPE in healthcare include surgical masks, gloves, and gowns.
A work standard sheet is a document that outlines the specific tasks, procedures, and expectations for a particular job or project.
Provides detailed instructions on how to perform a job or task
Includes information on safety protocols, quality standards, and deadlines
Helps ensure consistency and efficiency in work processes
May include visual aids or diagrams to aid understanding
Examples: manufacturing assembly instructi
5S is a workplace organization method that uses a list of five Japanese words: seiri, seiton, seiso, seiketsu, and shitsuke.
Sort (Seiri) - Separate needed tools, materials, and instructions from unneeded ones.
Set in order (Seiton) - Arrange the needed items so that they are easy to find and use.
Shine (Seiso) - Clean and inspect the work area and equipment regularly.
Standardize (Seiketsu) - Establish procedures and sche...
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing breakdowns and improving overall equipment efficiency
It involves regular maintenance, cleaning, and inspection of equipment
TPM also includes training employees to take ownership of equipment maintenance
Example: Implementing TPM practices in a manufacturing plant to red
I applied via Campus Placement
40 questions including 20 Aptitude and 20 Technical questions
The process during refrigeration is named as the refrigeration cycle.
The refrigeration cycle involves four main components: compressor, condenser, expansion valve, and evaporator.
Refrigerant is compressed by the compressor, then condensed in the condenser to release heat.
The high-pressure liquid refrigerant passes through the expansion valve, where it expands and cools down.
The cooled refrigerant then absorbs heat from...
posted on 17 Nov 2023
I applied via Campus Placement and was interviewed before Nov 2022. There were 5 interview rounds.
General knowledge questions and welding defect questions.
General knowledge questions
General knowledge questions and engineering department questions.
I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.
personal details, my self ( I'm..., my graduation, hobbies, skills, family etc.)
PPE stands for Personal Protective Equipment, which includes clothing and gear worn to minimize exposure to hazards.
PPE includes items like gloves, goggles, helmets, and masks.
It is used in various industries such as construction, healthcare, and manufacturing.
PPE is essential for protecting workers from injuries and illnesses.
Examples of PPE in healthcare include surgical masks, gloves, and gowns.
A work standard sheet is a document that outlines the specific tasks, procedures, and expectations for a particular job or project.
Provides detailed instructions on how to perform a job or task
Includes information on safety protocols, quality standards, and deadlines
Helps ensure consistency and efficiency in work processes
May include visual aids or diagrams to aid understanding
Examples: manufacturing assembly instructi
5S is a workplace organization method that uses a list of five Japanese words: seiri, seiton, seiso, seiketsu, and shitsuke.
Sort (Seiri) - Separate needed tools, materials, and instructions from unneeded ones.
Set in order (Seiton) - Arrange the needed items so that they are easy to find and use.
Shine (Seiso) - Clean and inspect the work area and equipment regularly.
Standardize (Seiketsu) - Establish procedures and sche...
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing breakdowns and improving overall equipment efficiency
It involves regular maintenance, cleaning, and inspection of equipment
TPM also includes training employees to take ownership of equipment maintenance
Example: Implementing TPM practices in a manufacturing plant to red
I applied via Walk-in and was interviewed in Aug 2023. There were 3 interview rounds.
That was conducted online and easy
That was also online and little bit tough
I applied via campus placement at Vidya Vardhaka College of Engineering, Mysore and was interviewed in Nov 2022. There were 4 interview rounds.
Quite easy if ur smart enough to crack. Take your friends help it will be easier.
I applied via Job Portal
Quantitative,logical reasoning, English
I applied via campus placement at Velammal Engineering College, Chennai
Interview experience
based on 1 review
Rating in categories
Area Sales Manager
119
salaries
| ₹9 L/yr - ₹19 L/yr |
Assistant Manager
77
salaries
| ₹6.5 L/yr - ₹16 L/yr |
Area Sales Executive
55
salaries
| ₹10.4 L/yr - ₹15.4 L/yr |
Territory Sales Incharge
37
salaries
| ₹7.5 L/yr - ₹12 L/yr |
Territory Sales Manager
36
salaries
| ₹7.9 L/yr - ₹12 L/yr |
Bridgestone
Michelin
Continental
Pirelli