Filter interviews by
I applied via Referral and was interviewed before Sep 2023. There was 1 interview round.
I am excited about the opportunity to immerse myself in a new culture and contribute to the growth of the company in Nigeria.
Excited about experiencing a new culture
Opportunity to contribute to company's growth in Nigeria
Seeking new challenges and professional development
I have extensive experience in managing teams and achieving branch targets.
Proven track record of successfully leading teams to meet and exceed sales goals
Strong communication and interpersonal skills to effectively manage staff and client relationships
Ability to analyze data and make strategic decisions to drive branch performance
I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.
Top trending discussions
I applied via campus placement at University of Petroleum and Energy Studies (UPES), Dehradun and was interviewed in Sep 2023. There were 5 interview rounds.
It was psychometric test
I applied via Naukri.com and was interviewed in Jan 2023. There were 2 interview rounds.
AC DC transformer motor automation is a process of controlling and regulating the operation of a motor using an AC DC transformer.
AC DC transformer motor automation involves converting AC power to DC power using a transformer.
The DC power is then used to control and regulate the operation of a motor.
This automation process allows for efficient and precise control of motor speed, torque, and direction.
Examples of AC DC ...
I applied via Company Website and was interviewed in Sep 2022. There were 4 interview rounds.
The qualification for an Instrumentation Technician typically includes a degree or diploma in instrumentation technology or a related field.
A degree or diploma in instrumentation technology or a related field is usually required.
Knowledge of electrical and electronic systems is important.
Experience with calibration and troubleshooting of instruments is often necessary.
Familiarity with industry standards and regulations...
Thermocouple range refers to the temperature range within which a thermocouple can accurately measure temperature.
Thermocouple range varies depending on the type of thermocouple used.
Common thermocouple types include J, K, T, E, and N.
For example, a type K thermocouple has a range of -200 to 1350 degrees Celsius.
It is important to select the appropriate thermocouple type for the temperature range being measured.
An anti-surge valve is a control valve used in a compressor system to prevent surge and maintain stable operation.
An anti-surge valve is typically installed in the discharge line of a compressor.
It is designed to protect the compressor from surge, which is a phenomenon of unstable flow and pressure that can cause damage to the compressor.
The valve opens or closes based on the compressor's operating conditions to mainta...
Yes, I have experience working with gas turbines.
I have worked with gas turbines in my previous job as an instrumentation technician.
I am familiar with the maintenance and troubleshooting of gas turbines.
I have experience in calibrating and testing gas turbine sensors and instruments.
I have knowledge of the safety protocols and regulations related to gas turbines.
There are three types of vibration in the field: axial, radial, and tangential.
Axial vibration occurs parallel to the axis of rotation.
Radial vibration occurs perpendicular to the axis of rotation.
Tangential vibration occurs at a right angle to both axial and radial vibration.
Vibration analysis is used to detect and diagnose problems in rotating machinery.
Excessive vibration can lead to premature failure of bearings, g
Yes, I am familiar with preventive maintenance jobs.
Preventive maintenance involves regularly scheduled inspections, cleaning, and repairs to prevent equipment breakdowns.
I have experience performing preventive maintenance on various types of instrumentation equipment, such as calibrators, transmitters, and controllers.
Examples of preventive maintenance tasks I have performed include checking for leaks, replacing worn ...
Precautions are necessary to ensure safe and efficient plant operation.
Regular maintenance of equipment and machinery
Proper training and certification of personnel
Strict adherence to safety protocols and procedures
Regular inspections and audits to identify potential hazards
Effective communication and coordination among team members
Use of personal protective equipment (PPE) as required
Emergency response planning and dri...
I am interested to work in maintenance field and troubleshooting
I applied via Company Website and was interviewed in Mar 2023. There were 3 interview rounds.
What is the CNG?hhhj
I have been working as a Junior Engineer for 2 years.
I have 2 years of experience as a Junior Engineer.
I started working as a Junior Engineer 2 years ago.
I have gained valuable skills and knowledge during my 2 years of work experience.
I applied via campus placement at Institute for Technology and Management (ITM) and was interviewed in Apr 2022. There were 3 interview rounds.
The symbols of 1st angle and 3rd angle view of engineering drawing
First angle projection symbol is a square with one corner cut off and an arrow pointing towards the object
Third angle projection symbol is a square with two corners cut off and an arrow pointing away from the object
The symbol is usually placed in the lower right-hand corner of the drawing
1st and 3rd angle projection are two different methods used in technical drawing to represent 3D objects on 2D surfaces.
1st angle projection is commonly used in Europe and Asia, while 3rd angle projection is commonly used in North America.
In 1st angle projection, the object is placed in the first quadrant and the views are projected onto the planes of projection.
In 3rd angle projection, the object is placed in the thir...
I would remain calm and professional, address the issue privately, and seek a resolution.
Stay calm and composed
Avoid reacting impulsively
Address the issue privately
Seek a resolution through communication
Maintain professionalism throughout
Draw the engineering drawing of the given physical object
I have worked on several projects during my training as a Tool Room Trainee.
Designed and fabricated a custom tool for a specific manufacturing process
Assisted in the maintenance and repair of various tools and equipment
Collaborated with a team to develop a new tooling solution for increased efficiency
Implemented improvements to existing tools to enhance their performance
Participated in the development of a prototype to
I created a web application for managing employee schedules.
Used React.js for the front-end and Node.js for the back-end
Implemented a calendar view for scheduling shifts
Included features for requesting time off and swapping shifts
Stored data in a MySQL database
Yes, I am able to work in a team.
I have experience working in teams in my previous job.
I am a good communicator and can collaborate effectively with others.
I am open to different perspectives and can adapt to different working styles.
I can contribute my skills and knowledge to achieve team goals.
I can handle conflicts and resolve them in a constructive manner.
Salary expectations will depend on factors such as experience, qualifications, and industry standards.
Salary expectations should be based on research of industry standards and the specific role
Consider factors such as experience, qualifications, and location when determining salary expectations
It is important to be realistic and flexible in negotiations
Provide a salary range rather than a specific number to allow for n
Yes, I know how to use Excel.
I am proficient in using Excel for data analysis, creating spreadsheets, and generating charts and graphs.
I have experience with functions and formulas in Excel, such as VLOOKUP, SUMIF, and IFERROR.
I can use Excel to perform data manipulation tasks, such as sorting, filtering, and pivot tables.
I am familiar with creating macros and automating tasks in Excel.
I have used Excel for financial m...
I can resume immediately.
I am available to start immediately.
I can begin work as soon as possible.
I am ready to start right away.
posted on 24 Jan 2022
Technical & Logical Reasoning - 1 hours
Current Topic - mine was Triple Talaq - 20 persons - 10 mins
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
IT Manager
4
salaries
| â‚ą11 L/yr - â‚ą15.4 L/yr |
Group Head Human Resource and Administration
4
salaries
| â‚ą48 L/yr - â‚ą70 L/yr |
Deputy General Manager
3
salaries
| â‚ą30 L/yr - â‚ą35 L/yr |
Financial Controller
3
salaries
| â‚ą18 L/yr - â‚ą23 L/yr |
Adani Wilmar
Patanjali Foods
Marico
Emami