There are two main types of dosing in Boiler Drum: continuous dosing and intermittent dosing.
Continuous dosing involves adding chemicals continuously to maintain a desired level of treatment in the boiler water.
Intermittent dosing involves adding chemicals at specific intervals to prevent scale and corrosion buildup.
Examples of chemicals used for dosing in Boiler Drum include oxygen scavengers, pH adjusters, and scale
Types of blow down include intermittent blow down and continuous blow down.
Intermittent blow down involves manual opening of a valve to release boiler water periodically.
Continuous blow down involves a continuous flow of water from the boiler to remove impurities.
Blow down helps maintain boiler efficiency and prevent build-up of harmful substances.
Examples of impurities removed during blow down include dissolved solids
To reduce foaming in a drum, the process involves adjusting temperature, using anti-foaming agents, controlling agitation, and ensuring proper filling levels.
Adjust temperature to reduce foam formation
Use anti-foaming agents to break down foam
Control agitation to prevent excessive foam buildup
Ensure proper filling levels to avoid overflow and foam creation
Top trending discussions
I expect you to provide guidance, support, and opportunities for growth in my role as a Senior Engineer.
Clear communication on expectations and goals
Regular feedback and support for professional development
Opportunities for learning new technologies and skills
Collaborative work environment
Recognition for achievements and contributions
I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.
I appeared for an interview before Nov 2016.
Yes, I am willing to work at any location for the Senior Engineer position.
I am open to relocating for the right opportunity
I have experience working in different locations
I am flexible and adaptable to new environments
I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.
I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.
I am adaptable and can quickly assess a situation to determine the best course of action.
I have strong problem-solving skills and can think creatively to find solutions in ad
posted on 13 Apr 2018
I applied via Naukri.com and was interviewed before Apr 2017. There were 5 interview rounds.
Discuss work related questions
Distribution voltage refers to the voltage level at which electricity is distributed from substations to consumers.
Distribution voltage typically ranges from 4 kV to 33 kV for residential and commercial areas.
Higher distribution voltages, such as 66 kV or 132 kV, are used for industrial areas or large consumers.
The choice of distribution voltage depends on factors like distance, load requirements, and cost.
Transformers...
I applied via Referral and was interviewed before Nov 2023. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Associate Manager
128
salaries
| ₹4.6 L/yr - ₹17 L/yr |
Junior Manager
99
salaries
| ₹3.5 L/yr - ₹8.3 L/yr |
Manager
51
salaries
| ₹9.5 L/yr - ₹20.9 L/yr |
Associate General Manager
25
salaries
| ₹17 L/yr - ₹43 L/yr |
Manager Civil
10
salaries
| ₹10.5 L/yr - ₹22.5 L/yr |
Suzlon Group
Adani Power
Adani Group
Torrent Power