Filter interviews by
Top trending discussions
posted on 3 May 2024
I applied via Indeed and was interviewed in Apr 2024. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
posted on 1 Sep 2022
I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.
Surveyors measure and map land, airspace, and water features to determine property boundaries and prepare construction sites.
Surveyors use specialized equipment such as GPS, total stations, and drones to collect data.
They analyze the data to create maps, legal descriptions, and other documents.
Surveyors work in various industries including construction, engineering, and government.
They must have knowledge of math, phys...
To do a detailed survey, a surveyor must use precise instruments and techniques to accurately measure and record data.
Use high-precision instruments such as total stations and GPS receivers
Take multiple measurements to ensure accuracy
Record data in a clear and organized manner
Consider environmental factors that may affect measurements
Collaborate with other professionals to ensure comprehensive data collection
Use softwa...
Layout and line level check can be done using various tools and techniques.
Use a theodolite or total station to measure angles and distances accurately.
Use a level to ensure that the ground is level and the lines are straight.
Use string lines and pegs to mark out the layout of the site.
Check the measurements and levels regularly to ensure accuracy.
Make adjustments as necessary to ensure that the layout and lines are co
Surveyor work involves measuring and mapping land, buildings, and other physical features.
Using specialized equipment to take precise measurements
Creating maps and drawings to represent the data collected
Working with architects, engineers, and construction teams
Ensuring compliance with local regulations and laws
Surveying land for potential development or construction projects
I applied via Naukri.com and was interviewed in Mar 2022. There were 3 interview rounds.
Drawing study, output BOQ etc.
Face to face interview
I applied via Referral and was interviewed in Aug 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Feb 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.
The principal of surveying involves accurately measuring and mapping the physical features of the land.
Surveying involves measuring and mapping land features such as boundaries, elevations, and distances.
The principal of surveying requires the use of specialized equipment such as total stations and GPS receivers.
Surveying is used in a variety of industries including construction, engineering, and land development.
Accur...
based on 1 review
Rating in categories
Site Engineer
7
salaries
| ₹3 L/yr - ₹3.6 L/yr |
Project Manager
6
salaries
| ₹11.8 L/yr - ₹15.9 L/yr |
Billing Engineer
5
salaries
| ₹2.4 L/yr - ₹8 L/yr |
Junior Engineer Civil
5
salaries
| ₹1.8 L/yr - ₹2.5 L/yr |
Civil Engineer
5
salaries
| ₹2.4 L/yr - ₹4.7 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company