i
GGS Engineering
Services
Filter interviews by
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
FMEA stands for Failure Modes and Effects Analysis, a systematic method for identifying and preventing potential failures in a process or product.
FMEA is a proactive risk assessment tool used to identify and prioritize potential failure modes in a system, process, or product.
It involves analyzing the potential effects of each failure mode, the likelihood of their occurrence, and the ability to detect and prevent them.
F...
Tool design involves creating and developing tools and equipment used in manufacturing processes.
Tool design focuses on creating efficient and effective tools for specific manufacturing processes.
It involves understanding the requirements of the manufacturing process and designing tools to meet those needs.
Tool design also includes considerations for material selection, ergonomics, and cost-effectiveness.
Examples of to...
The 7 wastages in assembly engineering are overproduction, waiting, transportation, inappropriate processing, excess inventory, unnecessary motion, and defects.
Overproduction: Producing more than needed, leading to excess inventory and waste.
Waiting: Delays in the production process due to inefficient scheduling or downtime.
Transportation: Unnecessary movement of materials or products, increasing costs and time.
Inappro...
VLOOKUP and HLOOKUP are Excel functions used to search for a value in a table and return a corresponding value.
VLOOKUP stands for vertical lookup and searches for a value in the first column of a table and returns a value in the same row from a specified column.
HLOOKUP stands for horizontal lookup and searches for a value in the first row of a table and returns a value in the same column from a specified row.
Both funct...
Top trending discussions
posted on 30 Dec 2023
I applied via Naukri.com and was interviewed in Nov 2023. There was 1 interview round.
A control module is a device that manages and regulates the operation of a system, while a relay module is a device that controls the flow of electrical current.
Control modules are responsible for monitoring and adjusting various parameters in a system, such as temperature, pressure, or speed.
Relay modules act as switches that open or close circuits to control the flow of electrical current.
Control modules are typicall...
The system architecture of FAS (Fire Alarm System) and BMS (Building Management System) involves the integration of various components and subsystems to ensure efficient monitoring and control of fire safety and building operations.
FAS system architecture typically includes fire detectors, control panels, notification devices, and communication interfaces.
BMS system architecture typically includes sensors, controllers,...
BOQ quantity for FAS system can be calculated by determining the required components and their quantities.
Identify the components needed for the FAS system
Determine the quantity of each component required based on project specifications
Consider factors such as system size, layout, and design requirements
Calculate the total quantity by summing up the quantities of all components
Example: If the FAS system requires 10 smo...
I applied via Company Website and was interviewed in May 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed before Apr 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Nov 2023. There was 1 interview round.
Pipe wall thickness can be calculated using various methods based on the material, pressure, and temperature of the pipe.
Calculate using Barlow's formula: t = PD/(2S - 0.8P)
Consider factors like material properties, pressure, temperature, and safety factor
Consult relevant codes and standards for specific calculations
Use software tools like CAESAR II for complex piping systems
I appeared for an interview in Oct 2022.
I applied via LinkedIn and was interviewed in Aug 2023. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Aug 2024. There was 1 interview round.
Question where asked from trains,permutation and some grammer
based on 1 interview experience
Difficulty level
Duration
based on 4 reviews
Rating in categories
Design Engineer
325
salaries
| ₹3.5 L/yr - ₹7.6 L/yr |
Senior Design Engineer
165
salaries
| ₹5.1 L/yr - ₹12 L/yr |
Junior Design Engineer
67
salaries
| ₹2.8 L/yr - ₹5 L/yr |
Lead Engineer
62
salaries
| ₹8.3 L/yr - ₹14 L/yr |
Senior Engineer
59
salaries
| ₹5.6 L/yr - ₹11.5 L/yr |
L&T Energy Hydrocarbon
AECOM
Sterling & Wilson
Apco Infratech