Soil compactor drum thickness is an important factor for compaction efficiency and durability.
The drum thickness of a soil compactor is typically between 0.5 to 1 inch.
Thicker drums are more durable and can withstand heavier loads.
The material of the drum also affects its thickness and durability, with steel drums being thicker than plastic ones.
Regular maintenance and inspection of the drum thickness is important to e
Preventive maintenance of excavator involves regular inspections, lubrication, and replacement of worn parts to ensure optimal performance and longevity.
Regularly inspecting the excavator for signs of wear and tear
Lubricating moving parts to prevent friction and reduce wear
Replacing worn out parts such as filters, belts, and hoses
Checking fluid levels and topping up as needed
Cleaning the excavator to prevent buildup of...
I applied via Naukri.com and was interviewed before Jul 2022. There were 3 interview rounds.
PMS stands for Piping Material Specification. One class for LPG system piping is Class 150.
PMS is a document that specifies the materials, standards, and requirements for piping systems.
Class 150 is a common class for LPG system piping, indicating the pressure rating of the piping components.
PMS helps ensure that the piping system is designed and constructed according to industry standards and safety regulations.
Hydrotest procedure involves filling the equipment with water and pressurizing it to check for leaks or structural integrity.
Prepare the equipment by ensuring it is clean and free of debris
Fill the equipment with water and remove air pockets
Gradually increase the pressure to the specified level
Hold the pressure for a specified duration to check for leaks
Monitor for any leaks or structural failures
Release the pressure a
Current CTC is $90,000 and expected CTC is $110,000
Current CTC: $90,000
Expected CTC: $110,000
Open to negotiation based on benefits and growth opportunities
posted on 7 Feb 2023
I applied via Recruitment Consulltant and was interviewed in Aug 2022. There were 2 interview rounds.
Alignment methods are techniques used to ensure proper positioning and orientation of mechanical components.
Common alignment methods include laser alignment, dial indicator alignment, and straight edge alignment.
Laser alignment uses a laser beam to measure and adjust the alignment of components.
Dial indicator alignment uses a dial gauge to measure the alignment of components.
Straight edge alignment involves using a str...
I applied via Newspaper Ad and was interviewed before May 2022. There were 2 interview rounds.
posted on 1 Sep 2021
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
based on 1 interview
Interview experience
Lead Engineer
43
salaries
| ₹14 L/yr - ₹25.1 L/yr |
Senior Engineer
41
salaries
| ₹6.9 L/yr - ₹14.5 L/yr |
Senior Design Engineer
25
salaries
| ₹8 L/yr - ₹12.7 L/yr |
Material Analyst
10
salaries
| ₹2.8 L/yr - ₹4 L/yr |
Senior Software Engineer
9
salaries
| ₹6.5 L/yr - ₹14.3 L/yr |
L&T Construction
Simplex Infrastructures
Saint-Gobain
AECOM