Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Gaursons Hi Tech Infrastructure Team. If you also belong to the team, you can get access from here

Gaursons Hi Tech Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Gaursons Hi Tech Infrastructure Interview Questions and Answers

Updated 22 Jan 2025

Gaursons Hi Tech Infrastructure Interview Experiences

Popular Designations

5 interviews found

Civil Supervisor Interview Questions & Answers

user image Sunil kumar prajapati

posted on 22 Jan 2025

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Company introduction

Civil Supervisor Interview Questions asked at other Companies

Q1. 1=Derivation of D²/162. 2=nominal mix 3=design mix 4=per tonne binding wire 5=water cement ratio 6=recent experience or responsibility.
View answer (1)

I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Fire fighting hydrant systems
  • Q2. Fire fighting sprinkler systems
  • Q3. Water curtain systems
  • Q4. Related all types fire extinguisher
  • Q5. Fire Alarm systems and PA systems
  • Q6. Pressurization fan and exhaust fan systems

Interview Preparation Tips

Interview preparation tips for other job seekers - Company culture good work salary benefits time to time all any benefits

Fire Fighting Foreman Interview Questions asked at other Companies

Q1. Experience naffco 6six years complicated
View answer (1)
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is slump test?
  • Ans. 

    Slump test is a method to measure the workability of concrete by determining the consistency and stiffness of the mix.

    • Involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles

    • Helps determine if the concrete mix has the right amount of water for proper workability

    • Results can indicate if adjustments need to be made to the mix before pouring

    • Commonly used in con

  • Answered by AI
  • Q2. The thickness of ply used in construction and size?
  • Ans. 

    Plywood thickness used in construction varies depending on the application, typically ranging from 3mm to 25mm.

    • Plywood thickness in construction can range from 3mm to 25mm, depending on the specific requirements of the project.

    • Common plywood sizes used in construction are 4x8 feet, 4x10 feet, and 4x12 feet.

    • Thicker plywood is typically used for structural applications, while thinner plywood may be used for finishing or

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Gaursons Hi Tech Infrastructure Civil Site Engineer interview:
  • Basic of building construction
  • RCC
  • Concrete
Interview preparation tips for other job seekers - Go without hesitation in interview.

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)

Senior Engineer Interview Questions & Answers

user image Ankit Abhishek

posted on 4 Feb 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. What is Developement lenght
  • Ans. 

    Development length is the distance required for a reinforcing bar to fully transfer its load to the surrounding concrete.

    • Development length is determined by factors such as bar diameter, concrete strength, and bond strength.

    • It is important to ensure an adequate development length to prevent premature failure of reinforced concrete structures.

    • For example, in a beam-column connection, the development length is the length...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Why are you changing job

Interview Preparation Tips

Interview preparation tips for other job seekers - Gaurs Group is good company and A learner can learn a lot from here.

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)

Gaursons Hi Tech Infrastructure interview questions for popular designations

 Assistant Project Manager

 (1)

 Civil Site Engineer

 (1)

 Civil Supervisor

 (1)

 Fire Fighting Foreman

 (1)

 Senior Engineer

 (1)

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Feb 2022. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Personal details and where is working on profile

Assistant Project Manager Interview Questions asked at other Companies

Q1. What are the different phases in new product development?
View answer (1)

Interview questions from similar companies

Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Apr 2020.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What is human resources
  • Q2. Can you describe your experience?

Interview Preparation Tips

Interview preparation tips for other job seekers - During my interview, the HR representatives named Kuldeep and Sathish provided the worst experience; they did not offer any clarity regarding the job role or even basic employment details. They offered me a salary that was less than $2000 gross compared to my current salary, mentioning an annual bonus that might be available after a year. The discussion was limited to the CTC as an increment. They displayed a lack of integrity.

I applied via Naukri.com and was interviewed in Dec 2021. There were 5 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. Brief explanation on work history.
  • Q2. Situational questions faced by the hiring manager.
  • Q3. Team management, vendor management, negotiations.
  • Q4. Ways to find new suppliers.
  • Ans. 

    There are several ways to find new suppliers, including attending trade shows, searching online directories, and asking for referrals.

    • Attend trade shows and conferences related to your industry

    • Search online directories such as ThomasNet or Alibaba

    • Ask for referrals from industry contacts or business partners

    • Use social media platforms like LinkedIn to connect with potential suppliers

    • Utilize supplier databases like Dun & ...

  • Answered by AI
  • Q5. Why do you want to change the industry?
  • Q6. Why would you want to join smartworks, and how can you make a difference

Interview Preparation Tips

Interview preparation tips for other job seekers - to have a clarity of thoughts was very important for me in order to answer the situational based questions. Deep insight about my expertise in Procurement domain played a key role in cracking the interview. Being honest about my strengths and the challenges i may have in the job also helped me i think.

Manager-Projects QAQC Interview Questions & Answers

M3M India user image Anonymous

posted on 16 Jan 2022

I applied via Recruitment Consultant and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

14 Questions

  • Q1. Non destructive tests of concrete structures ?
  • Ans. 

    Non destructive tests are used to assess the quality and integrity of concrete structures without causing damage.

    • Ultrasonic testing: Uses high-frequency sound waves to detect flaws or measure the thickness of concrete.

    • Ground penetrating radar: Uses electromagnetic waves to create images of subsurface structures and detect voids or anomalies.

    • Impact echo testing: Measures the resonance of a structure by striking it with ...

  • Answered by AI
  • Q2. 1. Core cutting test, 2. CAPO Test, 3. Rebound Hammer test, 4. Ultra Sonic Pulse velocity test.
  • Q3. Can we do the welding to reinforcement bars ?
  • Ans. 

    Yes, welding can be done to reinforcement bars.

    • Welding reinforcement bars is a common practice in construction projects.

    • It helps to create strong and durable connections between bars.

    • Welding is often used to join reinforcement bars in concrete structures.

    • Proper welding techniques and procedures should be followed to ensure quality and safety.

    • Examples of welding methods for reinforcement bars include shielded metal arc

  • Answered by AI
  • Q4. Yes. If reinforcement have carbon content equal or less than 0.25%.
  • Ans. 

    The carbon content of reinforcement should be equal to or less than 0.25%.

    • Reinforcement with carbon content exceeding 0.25% may not meet quality standards.

    • Carbon content in reinforcement affects its strength and durability.

    • Examples of reinforcement with low carbon content include low carbon steel bars and fibers.

    • Testing methods such as carbon analysis can be used to determine the carbon content of reinforcement.

  • Answered by AI
  • Q5. If we are lapping two different dia bars then lap length shall be according to lower or higher dia ?
  • Ans. 

    The lap length should be according to the higher diameter of the two bars.

    • The lap length is determined by the larger diameter bar to ensure sufficient overlap and bond strength.

    • This is because the larger diameter bar requires a longer length to achieve the same level of bond as the smaller diameter bar.

    • Using the lap length of the larger diameter bar ensures that the connection between the two bars is strong and meets t...

  • Answered by AI
  • Q6. Higher dia shall be followed as per IS 13920.2016.
  • Q7. What is standard deviation for M30 grade concrete as IS 456.2000
  • Ans. 

    The standard deviation for M30 grade concrete as per IS 456.2000 is not provided.

    • The IS 456.2000 code does not specify the standard deviation for M30 grade concrete.

    • Standard deviation values for concrete grades are typically provided in specific codes or standards.

    • To determine the standard deviation for M30 grade concrete, one would need to refer to a relevant code or conduct testing.

    • Without the specific data or code r...

  • Answered by AI
  • Q8. 4 N/mm2 as per IS 456.2000
  • Ans. 

    4 N/mm2 is the compressive strength of concrete as per IS 456.2000.

    • IS 456.2000 is the Indian standard code for the design and construction of reinforced concrete structures.

    • N/mm2 is the unit of measurement for compressive strength of concrete.

    • Compressive strength refers to the ability of concrete to withstand compression or crushing forces.

    • 4 N/mm2 is a common value used for design purposes in many construction projects

  • Answered by AI
  • Q9. What is tolerance for cover to reinforcement ?
  • Ans. 

    The tolerance for cover to reinforcement refers to the acceptable variation in the distance between the surface of concrete and the reinforcement bars.

    • The tolerance for cover to reinforcement is specified in construction codes and standards.

    • It is important to maintain the specified cover to ensure the durability and strength of the reinforced concrete structure.

    • The tolerance may vary depending on the type of structure,...

  • Answered by AI
  • Q10. -0 and +10 mm as IS 456.2000
  • Q11. NO LAP ZONE in column ?
  • Ans. 

    NO LAP ZONE in column refers to a specific area where lap joints are not allowed in the construction of a column.

    • A lap joint is a type of connection where two pieces of material overlap and are joined together.

    • In column construction, lap joints are typically avoided in certain zones to ensure structural integrity.

    • This may be due to factors such as high stress concentration, reduced load-bearing capacity, or increased r...

  • Answered by AI
  • Q12. H/4 from top and bottom of column.
  • Ans. 

    H/4 from top and bottom of column refers to the height of the column divided by 4.

    • H/4 from top and bottom of column is a measurement used in construction and engineering.

    • It is used to determine the distance from the top and bottom of a column where certain actions or inspections need to take place.

    • For example, if a column is 12 feet tall, H/4 from top and bottom would be 3 feet from the top and 3 feet from the bottom.

  • Answered by AI
  • Q13. %age of fly ash in concrete is allowed by IS 456.2000
  • Ans. 

    The percentage of fly ash allowed in concrete according to IS 456.2000.

    • IS 456.2000 allows a maximum of 35% fly ash in concrete.

    • Fly ash is a byproduct of coal combustion and is used as a supplementary cementitious material in concrete.

    • The use of fly ash in concrete improves workability, durability, and reduces the heat of hydration.

    • Fly ash can replace a portion of cement in concrete mixtures, reducing the environmental ...

  • Answered by AI
  • Q14. Minimum 25% as per IS 456.2000 Amendment-5

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared yourself and read IS codes precisely.

Plamber techniceon Interview Questions & Answers

Prestige Group user image Manas Swain

posted on 4 Oct 2021

I applied via Other and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Mr. Manas kumar swain
  • Q2. 10 your experience plambing departments mantniance
  • Q3. I am full interested prestige group compeny job
  • Q4. Please sir please job hona mere ku
  • Q5. Information karana sir

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir my locetian varthru banglour 560087

Interview Questionnaire 

16 Questions

  • Q1. Working of UPS and their safety ?
  • Ans. 

    UPS ensures uninterrupted power supply during power outages and protects equipment from power surges.

    • UPS stands for Uninterruptible Power Supply

    • It provides backup power during power outages

    • UPS also protects equipment from power surges and voltage fluctuations

    • UPS can be of different types such as standby, line-interactive, and online

    • UPS batteries need to be replaced periodically for optimal performance

  • Answered by AI
  • Q2. Working of HVAC systems and their safety ?
  • Ans. 

    HVAC systems are responsible for heating, ventilation, and air conditioning in buildings, ensuring comfort and safety.

    • HVAC systems regulate temperature, humidity, and air quality in indoor spaces.

    • They consist of various components such as furnaces, air conditioners, heat pumps, fans, and ductwork.

    • Safety measures include regular maintenance, proper installation, and adherence to building codes.

    • HVAC systems should be des...

  • Answered by AI
  • Q3. Working of fire alarm & fire fighting systems ?
  • Ans. 

    Fire alarm and fire fighting systems are designed to detect and extinguish fires in buildings.

    • Fire alarm systems use sensors to detect smoke or heat and trigger an alarm to alert occupants of the building.

    • Fire fighting systems include sprinklers, fire extinguishers, and fire hoses.

    • Sprinkler systems are designed to automatically release water when a fire is detected.

    • Fire extinguishers are portable devices that can be us...

  • Answered by AI
  • Q4. Power Distribution SLD of Electrical systems ?
  • Ans. 

    Power Distribution SLD is a schematic diagram that shows the distribution of power in an electrical system.

    • SLD stands for Single Line Diagram

    • It shows the flow of power from the source to the loads

    • It includes information about transformers, switchgear, and protective devices

    • It is used for design, construction, and maintenance of electrical systems

  • Answered by AI
  • Q5. Working principle of transformer and their safety ?
  • Ans. 

    Transformers work on the principle of electromagnetic induction and require proper grounding and insulation for safety.

    • Transformers convert electrical energy from one circuit to another through electromagnetic induction

    • They consist of two coils, primary and secondary, wound around a magnetic core

    • The primary coil is connected to the input voltage source and the secondary coil to the load

    • Safety measures include proper gr...

  • Answered by AI
  • Q6. SLD of UPS system ?
  • Ans. 

    SLD of UPS system refers to the Single Line Diagram of the system.

    • SLD is a graphical representation of the electrical system that shows all the components and their interconnections.

    • It is used to design, install, and maintain the UPS system.

    • SLD includes information about the power sources, distribution panels, transformers, UPS units, and loads.

    • It helps in identifying the fault location and isolating the faulty compone...

  • Answered by AI
  • Q7. Working of DG sets & their safety ?
  • Ans. 

    DG sets are backup power sources used in case of power outages. Safety measures include regular maintenance and proper ventilation.

    • DG sets are diesel-powered generators that provide backup power in case of power outages.

    • They are commonly used in hospitals, data centers, and other critical facilities.

    • Safety measures include regular maintenance to ensure proper functioning and prevent accidents.

    • Proper ventilation is also...

  • Answered by AI
  • Q8. Working of water treatment systems & their distribution ?
  • Ans. 

    Water treatment systems purify water for safe consumption. Distribution involves transporting treated water to consumers.

    • Water treatment systems remove impurities and contaminants from water.

    • Common methods include filtration, sedimentation, and disinfection.

    • Treated water is then distributed through a network of pipes and pumps.

    • Distribution systems must be regularly maintained to ensure water quality.

    • Chlorine is often a...

  • Answered by AI
  • Q9. Engineering (MEP)point of view which equipments we should have to taking care regularly to maintain the systems at data center of IT premises ?
  • Q10. What are procedure of procurement of materials and approvals of concern authority in Engineering point of view ?
  • Ans. 

    Procurement of materials and approvals in engineering involve several procedures and authorities.

    • Identify the required materials and their specifications

    • Prepare a list of potential suppliers and obtain quotes

    • Evaluate the quotes and select the supplier

    • Obtain necessary approvals from concerned authorities

    • Place the purchase order and track the delivery

    • Inspect the materials upon receipt to ensure compliance with specificat

  • Answered by AI
  • Q11. How we will implement cost saving intiatives ?
  • Ans. 

    Cost saving initiatives can be implemented through various measures.

    • Conducting a cost analysis to identify areas of potential savings

    • Reducing unnecessary expenses such as travel and entertainment

    • Negotiating better deals with suppliers

    • Implementing energy-efficient practices

    • Encouraging remote work to reduce office space costs

    • Investing in automation to reduce labor costs

    • Consolidating operations to reduce overhead costs

  • Answered by AI
  • Q12. Annual maintenance contract management & Vendor management procedures ?
  • Ans. 

    Annual maintenance contract & vendor management are crucial for efficient operations.

    • Annual maintenance contracts should be reviewed and renewed on time.

    • Vendor management procedures should include regular communication and performance evaluation.

    • Contracts should clearly define the scope of work, timelines, and payment terms.

    • Vendor selection should be based on factors such as quality, reliability, and cost-effectiveness...

  • Answered by AI
  • Q13. What is Capex and opex ?
  • Ans. 

    Capex refers to capital expenditures, while opex refers to operational expenses.

    • Capex is the money spent on acquiring or upgrading physical assets like property, equipment, or infrastructure.

    • Opex is the money spent on day-to-day operations like salaries, utilities, and maintenance.

    • Capex is usually a one-time expense, while opex is ongoing.

    • Capex is often used to increase the company's long-term value, while opex is nece...

  • Answered by AI
  • Q14. What is Escalation matrix ?
  • Ans. 

    Escalation matrix is a hierarchical process of escalating issues to higher authorities for resolution.

    • It is a structured process for resolving issues that cannot be resolved at lower levels.

    • It defines the hierarchy of authorities to be contacted in case of an issue.

    • It helps in timely resolution of issues by ensuring that they are escalated to the right authority.

    • It is commonly used in customer support, IT support, and ...

  • Answered by AI
  • Q15. Elevator and their safety ?
  • Ans. 

    Elevators are essential for modern buildings, and their safety is crucial for passengers' well-being.

    • Elevators must undergo regular maintenance and inspections to ensure their safety.

    • Safety features such as emergency brakes, door sensors, and alarms must be installed and functioning properly.

    • Elevator operators must be trained and certified to operate the elevator safely.

    • Building codes and regulations must be followed t...

  • Answered by AI
  • Q16. What is statutory approvals ?
  • Ans. 

    Statutory approvals are legal permissions required for a project or activity to comply with laws and regulations.

    • Statutory approvals are mandatory legal permissions required for any project or activity.

    • These approvals ensure that the project or activity complies with all the laws and regulations of the concerned authorities.

    • Examples of statutory approvals include building permits, environmental clearances, and licenses...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It was a walk-in round which I have been attended at Knight Frank head office. I have cleared HR & technical round. Mostly questions have been asked by interviwer were related to technical theory of electrical engineering . Interviwer also check the candidature technical skills as well as communication skills. I have cleared and qualified all of above questions which I have mention in ambition box and after that I got my offer letter from Knight Frank India Pvt ltd.

Gaursons Hi Tech Infrastructure Interview FAQs

How many rounds are there in Gaursons Hi Tech Infrastructure interview?
Gaursons Hi Tech Infrastructure interview process usually has 1-2 rounds. The most common rounds in the Gaursons Hi Tech Infrastructure interview process are Technical, HR and Resume Shortlist.
How to prepare for Gaursons Hi Tech Infrastructure interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Gaursons Hi Tech Infrastructure. The most common topics and skills that interviewers at Gaursons Hi Tech Infrastructure expect are Communication Skills, Real Estate, Accounting, CRM and Finance.
What are the top questions asked in Gaursons Hi Tech Infrastructure interview?

Some of the top questions asked at the Gaursons Hi Tech Infrastructure interview -

  1. The thickness of ply used in construction and si...read more
  2. What is slump te...read more
  3. What is Developement len...read more

Tell us how to improve this page.

Gaursons Hi Tech Infrastructure Interview Process

based on 6 interviews

Interview experience

4.2
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 127 Interviews
DLF Interview Questions
3.9
 • 74 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
View all

Gaursons Hi Tech Infrastructure Reviews and Ratings

based on 65 reviews

4.2/5

Rating in categories

3.9

Skill development

4.1

Work-life balance

3.8

Salary

3.9

Job security

3.8

Company culture

3.5

Promotions

3.8

Work satisfaction

Explore 65 Reviews and Ratings
Civil Engineer
12 salaries
unlock blur

₹3 L/yr - ₹4.5 L/yr

Civil Site Engineer
7 salaries
unlock blur

₹1.9 L/yr - ₹3.6 L/yr

Electrical Engineer
7 salaries
unlock blur

₹3 L/yr - ₹4.3 L/yr

Assistant Engineer - Civil
5 salaries
unlock blur

₹3.6 L/yr - ₹5.5 L/yr

Billing Engineer
5 salaries
unlock blur

₹4.5 L/yr - ₹7.8 L/yr

Explore more salaries
Compare Gaursons Hi Tech Infrastructure with

DLF

3.9
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview