Per MW cost with rational refers to the cost of generating one megawatt of electricity with a logical and reasonable approach.
Per MW cost with rational is calculated by taking into account all the expenses incurred in generating one megawatt of electricity.
This includes the cost of fuel, maintenance, labor, and other operational expenses.
The cost can vary depending on the type of power plant, fuel source, and location.
...
I applied via Campus Placement and was interviewed in Nov 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2020. There were 3 interview rounds.
posted on 8 Sep 2021
I applied via Naukri.com and was interviewed before Jan 2022. There were 2 interview rounds.
Quality tools for analysis include Pareto charts, fishbone diagrams, scatter plots, and control charts.
Pareto charts help identify the most significant factors affecting quality
Fishbone diagrams help identify the root cause of a problem
Scatter plots help identify correlations between variables
Control charts help monitor and control a process over time
I applied via Referral and was interviewed before Nov 2023. There were 3 interview rounds.
I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.
Possible reasons for cube failure despite good materials
Improper mixing of materials
Incorrect curing process
Inadequate compaction of concrete
Presence of air voids or impurities
Poor quality control during manufacturing
Compression test is conducted after cube test to determine the compressive strength of concrete.
Compression test is conducted to determine the compressive strength of concrete.
It involves applying a gradually increasing load to the concrete specimen until failure.
The results of the compression test help in assessing the quality of the concrete mix and its ability to withstand compressive forces.
Compression test is an i...
The quantity of cement used in M35 grade concrete varies depending on the mix design and specifications.
The quantity of cement in M35 grade concrete typically ranges from 360 to 420 kg/m3.
The exact amount of cement needed can be calculated using the mix design provided for the project.
Factors such as water-cement ratio, aggregate size, and admixtures also influence the quantity of cement required.
Assistant Manager
33
salaries
| ₹3.6 L/yr - ₹8 L/yr |
Production Engineer
33
salaries
| ₹2 L/yr - ₹4.4 L/yr |
Civil Site Engineer
22
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
Quality Engineer
21
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Site Engineer
13
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Adani Power
Vestas
ReNew
Siemens Gamesa Renewable Power Private Limited