i
G R Infraprojects
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
I was interviewed in Mar 2023.
I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.
Launching girder is a temporary structure used in construction to move and position heavy loads.
Launching girder is typically made of steel and consists of multiple sections that can be assembled and disassembled.
It is used in the construction of bridges, viaducts, and other structures to lift and move precast concrete segments into position.
The launching operation involves the step-by-step movement of the girder along...
posted on 30 Nov 2023
I was interviewed before Nov 2022.
posted on 30 Nov 2022
I applied via Job Portal
Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.
Bentonite is mixed with water to form a slurry and pumped into the borehole.
The slurry fills the borehole and stabilizes the walls, preventing collapse.
After the bentonite has set, pulsing can be done without the risk of borehole collapse.
Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.
posted on 10 Sep 2017
I was interviewed before Sep 2016.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 12 May 2018
based on 1 interview
Interview experience
Assistant Manager
350
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
224
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
137
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
131
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Engineer
123
salaries
| ₹0 L/yr - ₹0 L/yr |
Nagarjuna Construction Company
PNC Infratech
Ashoka Buildcon
IRB Infrastructure