Filter interviews by
Top trending discussions
I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.
posted on 24 May 2024
I applied via Recruitment Consulltant and was interviewed before May 2023. There were 2 interview rounds.
General aptitude and engineering test
I applied via Internshala and was interviewed in Aug 2022. There were 2 interview rounds.
posted on 20 Oct 2021
I applied via Referral and was interviewed in Sep 2021. There were 4 interview rounds.
Landing price can be calculated by adding the FOB price with freight, insurance, customs duty, and other charges.
FOB price is the cost of goods and transportation to the port of shipment
Freight cost is the cost of shipping the goods from the port of shipment to the port of destination
Insurance cost is the cost of insuring the goods during transit
Customs duty is the tax imposed by the importing country on the imported g...
In case of a global shortage of an exclusive semiconductor, I would take the following actions:
Identify alternative suppliers or manufacturers who can provide the required semiconductor
Negotiate with existing suppliers to increase the supply or prioritize our orders
Explore the possibility of redesigning the product to use a different semiconductor
Collaborate with other companies or industry associations to find a colle...
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
based on 2 reviews
Rating in categories
SMT Engineer
21
salaries
| ₹2.2 L/yr - ₹3.2 L/yr |
Test Engineer
13
salaries
| ₹1 L/yr - ₹3 L/yr |
SMT Operator
8
salaries
| ₹1.7 L/yr - ₹2.2 L/yr |
Purchase Engineer
7
salaries
| ₹2 L/yr - ₹3 L/yr |
Production Engineer
7
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Voltas
Blue Star
Havells
Crompton Greaves Consumer Electricals