Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Fibrex Construction Chemicals Team. If you also belong to the team, you can get access from here

Fibrex Construction Chemicals Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Fibrex Construction Chemicals Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - Assignment 

Question are hard in panel

Round 2 - HR 

(3 Questions)

  • Q1. What is the current ctc
  • Ans. 

    I am currently earning a salary of $60,000 per year.

    • My current annual salary is $60,000

    • I am earning $5,000 per month

    • My total compensation package is $60,000

  • Answered by AI
  • Q2. What is the company name
  • Ans. 

    The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.

    • XYZ Corporation is a data analytics firm

    • Specializes in providing insights for businesses

  • Answered by AI
  • Q3. Gammon India Ltd
Round 3 - Case Study 

It is very good in study for
Further studies.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. About GSB grades,SDBC
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Works which I had complited in nwda
  • Ans. 

    I have completed various projects at NWDA related to business development.

    • Developed new business strategies to increase revenue

    • Identified potential clients and formed partnerships

    • Analyzed market trends and competitor activities

    • Implemented marketing campaigns to promote products/services

  • Answered by AI
  • Q2. Details of each work complited by me
  • Q3. Tendering and costing
  • Q4. What is the problems of irrigation projects
  • Ans. 

    Some problems of irrigation projects include water scarcity, inefficient water distribution, environmental impact, and maintenance issues.

    • Water scarcity leading to insufficient supply for irrigation needs

    • Inefficient water distribution systems causing uneven water distribution

    • Environmental impact such as soil salinization and water pollution

    • Maintenance issues like clogging of irrigation channels or equipment breakdowns

  • Answered by AI
  • Q5. What is the latest model for solvingsewarge and drainage problem
  • Ans. 

    The latest model for solving sewage and drainage problems involves implementing green infrastructure solutions such as rain gardens and permeable pavement.

    • Green infrastructure solutions help manage stormwater runoff by allowing water to infiltrate into the ground instead of overwhelming sewer systems.

    • Examples of green infrastructure include rain gardens, bioswales, permeable pavement, and green roofs.

    • These solutions ca...

  • Answered by AI
  • Q6. Area of exposure in the present irrigation projects
  • Ans. 

    Currently involved in large-scale irrigation projects in rural areas

    • Implementing drip irrigation systems to conserve water

    • Utilizing solar-powered pumps for efficient water distribution

    • Working with local communities to educate on sustainable irrigation practices

  • Answered by AI

Interview Preparation Tips

Topics to prepare for MSV International General Manager Business Development interview:
  • About the field of expertise
Interview preparation tips for other job seekers - Be complete in your resume
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Case Study 

Over all performance

Round 2 - Assignment 

Project work related

Interview Preparation Tips

Interview preparation tips for other job seekers - Be sincere, honest and punctual to work
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Work in last service period with presentation about the work
  • Q2. Project report complited by me during service period
  • Ans. 

    I have completed multiple project reports during my service period.

    • Led a team to compile and analyze data for a quarterly project report

    • Implemented new reporting tools to streamline the process and improve accuracy

    • Presented findings to senior management and stakeholders for decision-making

    • Ensured all reports were completed on time and met quality standards

  • Answered by AI
Round 2 - HR 

Interview Preparation Tips

Interview preparation tips for other job seekers - First ensure job safty security then join this comny they are only busness oriented
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. About my past job
  • Q2. About interlinking
  • Q3. Comand area related details
  • Q4. Domestik water related details
  • Q5. Drainage works related works details

Interview Preparation Tips

Interview preparation tips for other job seekers - I will sugest to first discuss time frame of job

Interview Questions & Answers

MSV International user image Anonymous

posted on 24 Jun 2022

I applied via Referral and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Field realated Higway and Re wall
Round 3 - Technical 

(1 Question)

  • Q1. Explanation to BC DBM

Interview Preparation Tips

Interview preparation tips for other job seekers - Assistant Higway engineer (Sugrade ,GSB,WMM

Skills evaluated in this interview

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is responsibility of privious company. How much Col. Erection in site Refinery Experienced
  • Q2. All the sup. Instructions how to work is complete by the my Sr. Manager. All the work are working asper given drawing & designs Weekly meeting for clients & daily Meeting contractor staff. I have release...

Interview Preparation Tips

Topics to prepare for Chatterjee Engineering Mechanical Lead interview:
  • Mechanical Engineering
Interview preparation tips for other job seekers - Company give you offer letter you doesn't join this company. Because doesn't provide tools & tackles. last off months company take bills

Fibrex Construction Chemicals Interview FAQs

How to prepare for Fibrex Construction Chemicals interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Fibrex Construction Chemicals. The most common topics and skills that interviewers at Fibrex Construction Chemicals expect are Project Sales, Technical Sales, Time Management, Chemical Engineering and Construction.

Tell us how to improve this page.

Interview Questions from Similar Companies

GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Six Construct Interview Questions
4.5
 • 5 Interviews
Akshar Group Interview Questions
3.8
 • 3 Interviews
View all

Fibrex Construction Chemicals Reviews and Ratings

based on 4 reviews

3.6/5

Rating in categories

3.1

Skill development

3.5

Work-life balance

2.7

Salary

3.7

Job security

3.3

Company culture

3.9

Promotions

3.9

Work satisfaction

Explore 4 Reviews and Ratings
HR Executive

Faridabad

2-4 Yrs

Not Disclosed

Store Executive

Palwal

3-5 Yrs

Not Disclosed

Accounts Executive

Faridabad

2-6 Yrs

Not Disclosed

Explore more jobs
Regional Sales Manager
4 salaries
unlock blur

₹15.6 L/yr - ₹24.4 L/yr

Area Sales Manager
4 salaries
unlock blur

₹8.2 L/yr - ₹9.5 L/yr

Business Development Manager
4 salaries
unlock blur

₹6.2 L/yr - ₹6.3 L/yr

Store Executive
4 salaries
unlock blur

₹3 L/yr - ₹4 L/yr

Senior Executive Quality Control
4 salaries
unlock blur

₹6.5 L/yr - ₹10 L/yr

Explore more salaries
Compare Fibrex Construction Chemicals with

GAMMON INDIA

3.8
Compare

Karam Industries

4.1
Compare

Ray Engineering

4.1
Compare

MaRS Planning & Engineering Services

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview