Q1. How to calculate OEE, 7 QC tools, TPM, JH steps, SPC
Explanation of how to calculate OEE, 7 QC tools, TPM, JH steps, SPC
OEE = Availability x Performance x Quality
7 QC tools include Pareto chart, fishbone diagram, control chart, etc.
TPM involves total employee involvement in maintenance
JH steps include job analysis, job design, job instruction, etc.
SPC involves statistical analysis of process data
Q2. 1)HPDC process calculation. 2)What is 5S . 3)Kaizen implementation 4) How to reduce process Rejection 5) Plan Vs Actual 6)
The question includes topics such as HPDC process calculation, 5S, Kaizen implementation, reducing process rejection, and plan vs actual.
HPDC process calculation involves determining the parameters for high-pressure die casting.
5S is a methodology for workplace organization and standardization.
Kaizen is a continuous improvement approach that focuses on small incremental changes.
To reduce process rejection, one can implement quality control measures, improve training, and anal...read more
Q3. How to calculate cost of the plastic molding components
The cost of plastic molding components can be calculated by considering factors such as material cost, tooling cost, labor cost, and overhead cost.
Determine the material cost per unit of the component
Calculate the tooling cost, which includes the cost of the mold and any necessary equipment
Factor in the labor cost, which includes the cost of operating the molding machine and any necessary labor for finishing and assembly
Include overhead costs such as rent, utilities, and insu...read more
Q4. Which type of tools you can use in this given drawing.
Tools that can be used in the given drawing for Production Engineer.
CAD software like AutoCAD, SolidWorks, etc. for designing and drafting
CAM software like Mastercam, EdgeCAM, etc. for creating toolpaths and generating G-code
CNC machines for cutting, drilling, and shaping the parts
Measuring tools like calipers, micrometers, etc. for quality control
Hand tools like wrenches, pliers, etc. for assembly and maintenance
Q5. Plant maintenance activities, Why why analysis of breakdowns, Energy saving projects
Plant maintenance activities include Why-Why analysis of breakdowns and energy saving projects.
Plant maintenance activities are crucial for ensuring smooth operations and preventing breakdowns.
Why-Why analysis is a problem-solving technique used to identify the root cause of breakdowns and prevent their recurrence.
Energy saving projects involve identifying opportunities to reduce energy consumption and implementing measures to achieve those savings.
Examples of energy saving p...read more
Q6. what is MSA?
MSA stands for Measurement System Analysis.
MSA is a statistical method used to determine the variation and accuracy of a measurement system.
It helps to identify the sources of variation in a measurement system and improve its reliability.
MSA is commonly used in manufacturing and quality control processes.
Examples of measurement systems include scales, gauges, and thermometers.
Q7. What is major breakdowns in heat treatment.
Major breakdowns in heat treatment include improper quenching, overheating, and inadequate tempering.
Improper quenching can lead to distortion, cracking, and insufficient hardness.
Overheating can cause grain growth, loss of hardness, and reduced toughness.
Inadequate tempering can result in excessive hardness, brittleness, and reduced ductility.
Other breakdowns may include equipment failure, improper cleaning, and incorrect heat treatment specifications.
Q8. Is there any difficulty you face during following procedure
Yes, I sometimes face difficulty in coordinating training schedules with multiple departments.
Coordinating schedules with different departments can be challenging due to conflicting priorities.
Communication breakdowns can occur when trying to align training dates and times.
Rescheduling sessions may be necessary if conflicts arise.
Using a centralized calendar or scheduling tool can help streamline the process.
Q9. What's the major problems in endo generator.
The major problem in endo generator is overheating.
Overheating can cause damage to the generator and affect the quality of the end product.
The cooling system must be properly maintained to prevent overheating.
Other potential problems include electrical issues and mechanical failures.
Regular maintenance and inspections can help prevent these problems.
Proper training and education for operators is also important to ensure safe and effective use of the generator.
Q10. What are Iatf clauses
IATF clauses refer to specific requirements outlined in the International Automotive Task Force standards for automotive quality management systems.
IATF clauses are essential components of the quality management system for automotive companies.
They outline specific requirements that must be met in order to achieve IATF certification.
Examples of IATF clauses include requirements for leadership commitment, risk management, and continuous improvement.
Compliance with IATF clauses...read more
Q11. Purchase Procedure If line stop how you will manage
In case of line stop, I will immediately assess the situation and take necessary actions to minimize the impact on production.
Identify the cause of line stoppage
Communicate with production team to understand the impact on production
Prioritize the purchase of necessary materials to resume production
Explore alternative suppliers or materials if necessary
Ensure timely delivery of materials to minimize downtime
Q12. What is the process of training
Training process involves assessing needs, designing training programs, delivering content, evaluating effectiveness.
Assess training needs of employees
Design training programs based on needs assessment
Deliver training content through various methods (e.g. workshops, online modules)
Evaluate training effectiveness through assessments and feedback
Adjust training programs based on evaluation results
Q13. Difference between VA & VE
VA is value analysis, while VE is value engineering. Both are cost-saving techniques used in product development.
VA is a systematic review of a product's components and functions to identify areas where cost can be reduced without affecting performance.
VE is a more comprehensive approach that involves rethinking the entire product design to achieve cost savings while improving performance.
VA is typically used in the early stages of product development, while VE is used later ...read more
Q14. Mcodes g codes of cnc
M codes and G codes are commands used in CNC machines to control various functions and operations.
M codes are used for miscellaneous functions like stopping the machine or changing tools.
G codes are used for specific movements and operations like cutting, drilling, or milling.
Examples of M codes: M00 (program stop), M06 (tool change), M30 (end of program)
Examples of G codes: G00 (rapid positioning), G01 (linear interpolation), G02 (circular interpolation)
Q15. Name some polymers
Polymers are large molecules made up of repeating units called monomers. They have a wide range of applications in various fields.
Polyethylene
Polypropylene
Polyvinyl chloride
Polystyrene
Polyester
Polyurethane
Nylon
Teflon
Silicone
Rubber
Q16. OEE and TPM,explain briefly?
OEE (Overall Equipment Effectiveness) and TPM (Total Productive Maintenance) are two important concepts in manufacturing.
OEE measures the efficiency of a machine or process by taking into account availability, performance, and quality.
TPM is a maintenance strategy that aims to maximize the productivity of equipment by involving all employees in the maintenance process.
OEE and TPM are often used together to improve manufacturing efficiency and reduce downtime.
For example, by u...read more
Q17. What is benefits and shefty.
The question is unclear and seems to be a typo. There is no clear answer.
The question is likely a typo or misspelling.
There is no clear meaning to 'benefits and shefty'.
Without more context or clarification, it is impossible to provide an answer.
Q18. Tell me about HPDC department
HPDC department stands for High Pressure Die Casting department, which specializes in manufacturing complex metal components.
Specializes in manufacturing complex metal components
Utilizes high pressure to inject molten metal into molds
Requires precision and expertise in operating machinery
Plays a crucial role in automotive and aerospace industries
Q19. Relocation possible?
Top HR Questions asked in ARGICK Technologies
Interview Process at ARGICK Technologies
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month