Upload Button Icon Add office photos

Filter interviews by

Exotech Zanini Industries PPC Engineer Interview Questions and Answers

Updated 12 Feb 2023

Exotech Zanini Industries PPC Engineer Interview Experiences

1 interview found

PPC Engineer Interview Questions & Answers

user image Anonymous

posted on 12 Feb 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. How the regular work activity
  • Q2. What is the DWM plan
  • Ans. 

    DWM plan stands for Device, Wearable, and Mobile plan which is a strategy for optimizing digital marketing campaigns.

    • DWM plan focuses on utilizing devices, wearables, and mobile devices to reach target audiences.

    • It involves creating mobile-friendly content and optimizing campaigns for mobile devices.

    • Examples of DWM plan tactics include mobile app advertising, SMS marketing, and mobile search ads.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident, Don't Show the negative point. Tell the Positive points only ablut Your profile. Don't blame anyone

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Production planning control & procurement how to handling
  • Ans. 

    Production planning control & procurement involves coordinating the production process with procurement activities to ensure timely and cost-effective supply of materials.

    • Developing a production plan based on demand forecasts and available resources

    • Coordinating with procurement team to ensure timely sourcing of materials

    • Monitoring production progress and adjusting plans as needed

    • Optimizing inventory levels to balance p...

  • Answered by AI
  • Q2. How to control inventory, capacity analysis for supplier,Part traking for every stage
  • Ans. 

    Inventory control involves tracking parts at every stage, analyzing supplier capacity, and implementing efficient part tracking systems.

    • Implement a robust inventory management system to track parts at every stage of production.

    • Conduct capacity analysis for suppliers to ensure they can meet demand and make adjustments as needed.

    • Utilize barcode or RFID technology for efficient part tracking and real-time updates.

    • Regularl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear Team,try your best and get your place 👍
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - HR 

(2 Questions)

  • Q1. Personal skill and designations
  • Q2. Self introduction

Interview Preparation Tips

Interview preparation tips for other job seekers - Way to Calarify your skills
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Technical know abouts and on ground problems
  • Q2. Situational question

Interview Preparation Tips

Interview preparation tips for other job seekers - Be very sound in your core field if you want to go through the technical round and should be of stable background
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Skill develop , Postive though, Hard work response
  • Q2. Squre job work balance life
  • Q3. Customer achivement
  • Q4. Defect free product customer satisfaction
  • Q5. Life learning highlevel

Interview Preparation Tips

Interview preparation tips for other job seekers - Kizen activity.
Quality cereal
Customer quality achievement.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2024. There were 4 interview rounds.

Round 1 - Aptitude Test 

Aptitude test are used in schools, by employers, and to help individuals make careers

Round 2 - Technical 

(7 Questions)

  • Q1. What work is done in MRF company
  • Q2. What work is company
  • Q3. This is MRF is good company
  • Q4. Maintenance is good work
  • Q5. Maintenance department is MRF company
  • Q6. MRF company work in maintenance
  • Q7. MRF company is a good and excellent company
Round 3 - Group Discussion 

Group discussion is a structured conversation where people exchange ideas and opinions on a topic

Round 4 - Assignment 

The reporter disappeared on an assignment in the war zone

Interview Preparation Tips

Topics to prepare for MRF Tyres Junior Engineer interview:
  • HR Generalist Activities
  • D.g.sets
Interview preparation tips for other job seekers - Be prepared for anything, including interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is your responsibility in your previous organisation.
  • Q2. What is spc and msa in details.
Round 2 - HR 

(2 Questions)

  • Q1. Tell me your family background
  • Q2. Are you know this company before this interview.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. Tell me about your self
  • Ans. 

    I am a dedicated and experienced Production Engineer with a strong background in manufacturing processes and quality control.

    • Bachelor's degree in Mechanical Engineering

    • 5+ years of experience in production engineering

    • Proficient in CAD software and manufacturing processes

    • Implemented lean manufacturing principles to improve efficiency

    • Led cross-functional teams to troubleshoot production issues

  • Answered by AI
  • Q2. You're worked here
  • Q3. Job and responsibilities
Round 2 - Technical 

(5 Questions)

  • Q1. Cnc vmc program
  • Q2. SAP(BOM, production punch)
  • Q3. 7qc tool details
  • Q4. 5 core tools (spc, MSA, Ppap)
  • Q5. Production document (dwm, dd20, 5m change, tl activity

Interview Preparation Tips

Topics to prepare for Subros Production Engineer interview:
  • Self introduction
  • Technical
  • TPM Methodology
  • MS Office
  • SAP
  • CNC Programming
  • VMC Programming
  • Machine Setting
  • English Language
Interview preparation tips for other job seekers - Production engineer in machine shop (CNC, VMC and SPM)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Measuring instrument.
  • Q2. Metal science
  • Q3. Quality definition
  • Q4. Engineering drawing

Interview Preparation Tips

Interview preparation tips for other job seekers - Quality system and definition.
Measuring instrument. Read and keep going to interview
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Job Portal and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is fixture and jigs
  • Ans. 

    Fixtures and jigs are tools used in manufacturing to hold and guide workpieces during machining or assembly processes.

    • Fixtures are devices used to securely hold workpieces in place during machining operations

    • Jigs are tools that guide cutting tools or other machinery during operations

    • Fixtures and jigs help ensure accuracy, repeatability, and efficiency in manufacturing processes

    • Examples include drill jigs for guiding dr...

  • Answered by AI
  • Q2. What is preventive maintenance
  • Ans. 

    Preventive maintenance is the practice of regularly inspecting, cleaning, and servicing equipment to prevent breakdowns and prolong its lifespan.

    • Regularly scheduled inspections and maintenance tasks are performed to identify and address potential issues before they become major problems.

    • Examples include changing air filters in HVAC systems, lubricating moving parts in machinery, and checking for leaks in plumbing syste...

  • Answered by AI
Round 2 - Design Test 

(2 Questions)

  • Q1. What is computer aided design
  • Ans. 

    Computer aided design (CAD) is the use of computer software to create, modify, analyze, and optimize designs for various industries.

    • CAD allows engineers and designers to create 2D or 3D models of products or structures.

    • It helps in visualizing and simulating designs before they are physically built.

    • CAD software can be used in industries such as automotive, aerospace, architecture, and manufacturing.

    • Examples of CAD softw

  • Answered by AI
  • Q2. What is computer aided manufacturing
  • Ans. 

    Computer aided manufacturing (CAM) is the use of software to control machine tools and related machinery in the manufacturing of workpieces.

    • CAM software generates toolpaths and instructions for machines to follow during the manufacturing process.

    • CAM systems can be used for various processes such as milling, turning, and laser cutting.

    • CAM helps in automating and optimizing the manufacturing process, leading to increased...

  • Answered by AI

Exotech Zanini Industries Interview FAQs

How many rounds are there in Exotech Zanini Industries PPC Engineer interview?
Exotech Zanini Industries interview process usually has 2 rounds. The most common rounds in the Exotech Zanini Industries interview process are Resume Shortlist and One-on-one Round.

Tell us how to improve this page.

Interview Questions from Similar Companies

Bosch Interview Questions
4.2
 • 331 Interviews
MRF Tyres Interview Questions
3.7
 • 293 Interviews
JBM Group Interview Questions
4.0
 • 252 Interviews
Varroc Group Interview Questions
3.7
 • 171 Interviews
Exide Industries Interview Questions
3.5
 • 165 Interviews
Subros Interview Questions
3.9
 • 162 Interviews
UNO Minda Interview Questions
4.0
 • 160 Interviews
Ceat Tyres Interview Questions
4.0
 • 153 Interviews
Yazaki Interview Questions
3.8
 • 128 Interviews
View all
Quality Engineer
6 salaries
unlock blur

₹2.2 L/yr - ₹5.5 L/yr

Junior Engineer
6 salaries
unlock blur

₹2.5 L/yr - ₹3.7 L/yr

Senior Quality Assurance Engineer
4 salaries
unlock blur

₹3.8 L/yr - ₹5.2 L/yr

Marketing Engineer
4 salaries
unlock blur

₹3.6 L/yr - ₹5.2 L/yr

Quality Inspector
4 salaries
unlock blur

₹1.5 L/yr - ₹2 L/yr

Explore more salaries
Compare Exotech Zanini Industries with

Bosch

4.2
Compare

JBM Group

4.0
Compare

Samvardhana Motherson Group

3.8
Compare

Subros

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview